Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Constructional engineering informatization management system

A technology of information management and construction engineering, applied in data processing applications, resources, instruments, etc., can solve the problems that records cannot be saved, deviations are not easy to be corrected in time, easy to lose, etc., to achieve the effect of improving efficiency and reliability

Pending Publication Date: 2022-04-05
广州铭珩建筑科技有限公司
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

On the one hand, this processing method requires supervision engineers to run to complete the monitoring process, which consumes a lot of human resources
In addition, the manual supervision engineer’s time on site is intermittent and cannot monitor the operation process in real time. When problems are often discovered, the project has already been carried out for a period of time, and it is difficult to correct deviations in time.
[0005] In order to solve the common problems in this field that workers cannot interact with the system, construction progress cannot be monitored, online verification cannot be verified, deviations cannot be corrected, verification operations are complicated, real-time verification cannot be performed, records cannot be saved or easily lost, and the degree of intelligence is low. , made the present invention

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Constructional engineering informatization management system
  • Constructional engineering informatization management system
  • Constructional engineering informatization management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] The implementation of the present invention is described below through specific specific examples, and those skilled in the art can understand the advantages and effects of the present invention from the content disclosed in this specification. The present invention can be implemented or applied through other different specific embodiments, and various modifications and changes can be made to the details in this specification based on different viewpoints and applications without departing from the spirit of the present invention. In addition, the drawings of the present invention are only for simple illustration, and are not drawn according to the actual size, which is stated in advance. The following embodiments will further describe the relevant technical content of the present invention in detail, but the disclosed content is not intended to limit the protection scope of the present invention.

[0056] according to figure 1 , figure 2 , image 3 , Figure 4 , ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a constructional engineering informatization management system, which comprises a cloud server, an acquisition module, a detection module, a calibration module, a supervision module, a task module, a prompt module and a processor, and is characterized in that the acquisition module is used for performing data acquisition on a construction position to obtain current construction drawing parameters and construction requirements; the detection module is used for detecting the work progress of a worker so as to dynamically detect the current progress; the task module is used for distributing engineering tasks so as to achieve task distribution of all positions and building stations; the calibration module is used for rechecking or calibrating each working condition after construction; the supervision module is used for supervising workers and construction progress; and the prompting module is used for prompting workers based on the data of the supervision module and generating modification suggestions. According to the invention, the supervision module is used for supervising the workers and the construction progress, and is also matched with the task module to form a closed loop for supervising the construction tasks allocated by the workers.

Description

technical field [0001] The invention relates to the technical field of construction engineering management, in particular to a construction engineering information management system. Background technique [0002] Project quality control implements the entire life cycle of construction projects. In recent years, the quality of construction projects has been greatly increased at the national level, and it is also always related to the safety of people's lives. Engineering data management is usually carried out through construction data tables, which are an important form of construction project quality and the most important data recording carrier in the construction process. The only process-related records and data traces that can be retained after the completion of the entire construction project are engineering data, so engineering data has an irreplaceable role. [0003] For example, the prior art of CN108376376B discloses a BIM model-based construction engineering quali...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08G06V20/52G01B21/02G01B21/30
Inventor 陶金燕刘其国吴楚鑫
Owner 广州铭珩建筑科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products