Engineering project progress management system

A technology for engineering project and progress management, applied in the field of engineering project progress management system, can solve problems such as difficulty in large-scale construction, delay in work progress, and lag, and achieve the effects of preventing search difficulties, facilitating management, and eliminating interference

Pending Publication Date: 2020-12-25
GUANGXI ROAD & BRIDGE ENG GRP CO LTD
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This traditional method cannot visually display the progress of the entire project during the construction process, and can only be reflected through data reports and other methods
[0003] Moreover, the traditional progress management method information lags behind and the degree of informatization is low, which restricts the development of project progress management level
Because large-scale projects have the characteristics of difficult construction, long period, and many operators, they will face many problems in terms of progress and cost during project construction
In addition, senior leaders may not be able to understand the progress of the project site in a timely manner, and the construction plan is not synchronized with the material demand plan, resulting in delays in work and progress lags due to untimely supply of materials, and delays in the overall progress of the project due to untimely project progress control. Situation etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering project progress management system
  • Engineering project progress management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0042] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field of the invention. The terms used herein in the description of the present invention are for the purpose of describing specific embodiments only, and are not intended to limit the present invention. As used herein, the term "and / or" includes any and all combinations of one or more of the ass...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of engineering construction, in particular to an engineering project progress management system, which comprises a three-dimensional model establishment module, an engineering progress input module, an information platform and a database, and is characterized in that the three-dimensional model establishment module is used for establishing a three-dimensional model of an engineering project. The engineering progress input module is used for inputting engineering progress information of engineering project construction, wherein the information platform is used for managing engineering project information, and the information platform is associated with the three-dimensional model establishing module, so that a manager can acquire the informationof an engineering project in a three-dimensional model through the three-dimensional model establishing module; and the database is used for accessing the three-dimensional model establishing module,the project progress input module and the information platform data. According to the engineering project progress management system, the engineering progress and engineering materials can be effectively monitored, and smooth completion of construction is guaranteed.

Description

technical field [0001] The invention relates to the technical field of engineering construction, in particular to an engineering project progress management system. Background technique [0002] With the rapid development of the national economy, the continuous development of my country's infrastructure construction has been promoted. As an important infrastructure construction project, the construction quality of road and bridge projects directly affects the safety of people's lives and the overall utilization efficiency of national resources. During the construction process, how to effectively monitor the construction progress is one of the key points of construction. In the process of traditional progress management methods, it is managed through paper reports or data management systems. This traditional method cannot visually display the progress of the entire project during the construction process, and can only be reflected through data reports and other methods. [00...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10
CPCG06Q10/103
Inventor 孙辉马文安杜海龙韩玉林广泰胡廷志张云祺解威威覃献康王建军蒋严波王勇朱觉文梁才侯泽群宋晓先韦耀庭谢灿荣徐梓荣何健李雍友韦永奎陈孝强郑健钱海洋欧晨丰陆进罗伟
Owner GUANGXI ROAD & BRIDGE ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products