Construction method of deep foundation pit earthwork ramp

A construction method and technology of deep foundation pits, applied in the direction of infrastructure engineering, excavation, construction, etc., can solve the problems of heterogeneous distribution of structural forms, affect the safety of foundation pits, and unfavorable project advancement, etc., to achieve convenient construction, structural safety, and safety sex high effect

Active Publication Date: 2022-07-22
SHANGHAI BAOYE GRP CORP
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the general deep foundation pit project, a large number of heavy machinery vehicles will be used in the construction process. Whether it is the inner support of the concrete structure or the steel structure, there are horizontal and vertical components, and its structural forms are diverse and the distribution methods are heterogeneous. Ordinary earthwork ramps are likely to interfere with the inner support of the foundation pit, which affects the safety of the foundation pit. After the road is formed, how to carry out organized drainage and prevent collapse is also a difficult problem
Similar projects often use steel trestle bridges as the up and down slopes of foundation pits, and use the flexibility of steel structure design to avoid interference with internal supports, but the high cost, difficult construction, and long period are not conducive to project progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of deep foundation pit earthwork ramp
  • Construction method of deep foundation pit earthwork ramp
  • Construction method of deep foundation pit earthwork ramp

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The present invention is further illustrated by specific examples below.

[0025] like Figure 1~Figure 3 As shown, a construction method of a deep foundation pit earthwork ramp, comprising:

[0026] Step 1. Ramp monitoring: According to the design drawings of the ramp, select the monitoring point of the foundation pit, complete the layout before the construction of the ramp, and collect the initial data; the monitoring frequency is from complex to simple, three days before the ramp is put into use, Three times a day in the morning, noon and evening; from the third to fourteenth days, once a day; after two weeks, once every three days, the monitoring time should continue until the ramp is removed;

[0027] Step 2. Ramp construction and initial grinding: Backfill the earthwork according to the designed ramp positioning and slope, starting from the bottom of the foundation pit, backfilling in layers and compacting in layers. During the backfilling process, an excavator c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of a deep foundation pit earthwork ramp. The method is characterized by comprising the steps of ramp monitoring, ramp construction and primary grinding; slope supporting and drainage are conducted, specifically, after the ramps are compacted through rolling, slope supporting and drainage construction are started, slope supporting adopts a soil nailing wall mode, the spraying sequence in the same section needs to be from bottom to top, and after primary spraying, a net is hung to spray a second layer; after the sprayed concrete is finally set for 2 hours, the water spraying maintenance time is not less than 7 days; and surface layer construction: after the slope support construction is finished, removing the steel plate of the ramp surface layer, flattening the gravel layer, pouring and grooving the surface, arranging a single-layer reinforcing mesh in the gravel layer, and carrying out segmented construction along the longitudinal direction of the ramp. Therefore, the deep foundation pit ramp construction method is convenient to construct, safe in structure and programmed, the problems that in deep foundation pit engineering, the ramp and the inner support interfere with each other, and safety is difficult to guarantee are solved, and the purpose of combining economic benefits is achieved.

Description

technical field [0001] The invention relates to the technical field of foundation pit construction, in particular to a construction method of a deep foundation pit earthwork ramp. Background technique [0002] In general deep foundation pit projects, a large number of heavy machinery and vehicles will be used in the construction process. The setting of the upper and lower slopes of the foundation pit is essential, and the foundation pit is designed to ensure the structural safety of the foundation pit itself. The support, whether it is a concrete structure or an internal support of a steel structure, has horizontal and vertical components, and its structural forms are diverse and the distribution is complex. Ordinary earthwork ramps are easy to interfere with the support in the foundation pit, which affects the safety of the foundation pit. After the road is formed, how to conduct organized drainage and prevent collapse is also a difficult problem. Similar projects mostly u...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02E02D17/04E02D15/02
CPCE02D17/02E02D17/04E02D15/02Y02A30/60
Inventor 王怡庭许海钦杨卫平黄学文曾禄欧佳俊
Owner SHANGHAI BAOYE GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products