Mining producing method for synchronous excavation and mining drift multiplying
Patent Information
- Authority / Receiving Office
- CN ยท China
- Current Assignee / Owner
- ่ๅฝๆฐ
- Publication Date
- 2006-03-29
- Estimated Expiration
- Not applicable ยท inactive patent
Smart Images
Figure 1 Figure 2
Abstract
Description
(1) Technical field
[0001] The invention discloses a mining method related to underground mineral deposits, in particular to a production method in which roadway excavation and mining are carried out synchronously. (2) Background technology
[0002] The vast majority of underground deposits are in inclined positions. Large-scale mines have multiple mining areas, and each mining area must have at least two main roadways for air intake and exhaust. The mining working faces are arranged vertically or nearly vertically on the two wings of the main roadway, just like the word "non". The two verticals are the main air intake and exhaust roadways, and each horizontal line is a mining working face. And there are two roadways on both sides of each mining face, used as air intake and exhaust. Generally, the roadway connecting the main air inlet roadway with the roadway on one side of the mining face is called a flat roadway, which plays the role of air intake and product output. Th...