Device and method for testing the effect of cement dewatering on sand layer penetration grouting effect
By simulating the permeation grouting process of cement slurry in the sand layer, using a pressurized slurry device and grouting pipe to measure the performance parameters at different locations, the problem of grouting inequality of sand layer caused by the water extraction effect of cement slurry is solved. Quantitative testing and reinforcement effect evaluation have been achieved, ensuring the stability of underground engineering.
Patent Information
- Application Number
- CN201911101694.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-12
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing grouting design cannot consider the water extraction effect of cement slurry, resulting in uneven grouting and reinforcement effect of the sand layer, lack of quantitative testing equipment and methods, and affecting the stability of underground projects.
Provide a device for testing the effect of cement water dissipation on sand layer penetration grouting, including a slurry supply and discharge device, test bench and grouting pipe, to simulate the permeation grouting process of cement slurry in the sand layer, by measuring different The performance parameters of the location, quantitatively test the spatial distribution unevenness of the water analysis effect on the reinforcement effect.
Quantitative testing of the cement slurry water-spout effect on the sand layer penetration grouting reinforcement effect was achieved, ensuring that the grouting process does not disturb the pore structure of the sand layer, avoiding high-pressure rupture, ensuring slurry uniformity, and improving test efficiency and accuracy.
Smart Images

Figure CN110702485B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a device and a method, in particular to a device and a method for testing the influence of cement water separation on the penetration grouting effect of a sand layer. Background Art
[0002] The inventors have found that when underground projects are constructed in strata with good pore connectivity such as gravel layers and coarse and medium sand layers, infiltration grouting is the most common method for reinforcing the above-mentioned strata. At the same time, cement slurry is currently the most commonly used grouting material. Cement slurry is widely used in grouting projects, but cement slurry itself has a water separation effect. The precipitation of water and the sedimentation of cement particles will lead to the uneven distribution of cement slurry in space, making the reinforcement effect of the lower part of the grouting reinforcement body good and the upper part poor, and the grouting effect varies greatly in space. The unevenness of the grouting reinforcement effect of the sand layer will have a significant impact on the stability of the proposed reinforcement project. However, the current grouting design cannot take into account the water separation effect of cement slurry, and there is no device or method that can quantitatively test this difference. Summary of the invention
[0003] The purpose of the present invention is to overcome the shortcomings of existing devices and methods, and to provide a device and method for testing the effect of cement water separation on the effect of sand layer penetration grouting. The device simulates the process of cement slurry penetration grouting in the sand layer, realizes the simulation of cement slurry water separation effect, and realizes the quantitative test of the spatial distribution unevenness of the sand layer penetration grouting reinforcement effect by measuring various performance parameters of slurry stone bodies at different positions after grouting.
[0004] In order to achieve the above-mentioned purpose, the device adopts the following technical solutions.
[0005] In a first aspect, the present invention provides a device for testing the effect of cement water separation on the effect of sand layer penetration grouting, comprising a grouting device, a test bench and a grouting pipe;
[0006] The grouting pipes include a plurality of grouting pipes, which are fixed on the test bench, and the grouting device provides grouting pressure for each grouting pipe;
[0007] Each grouting pipe includes a pipe cap, a PVC pipe, a reducer and a valve. The upper end of the PVC pipe is connected to the pipe cap. A vent hole is provided on the pipe cap to ensure that the gas in the pipe is fully discharged during the infiltration grouting process. A fine wire mesh is laid in the pipe cap, and the mesh diameter of the wire mesh does not exceed the diameter of the sand particles. The lower end of the PVC pipe is connected to the reducer, and a valve is installed under the reducer. The grouting pipe is always kept vertical on the test bench to ensure that the water separation direction of the cement slurry is consistent with the axial direction of the grouting pipe.
[0008] The grouting supply and pressure device includes a grouting pump and a grouting box. In the test, the grouting pump provides grouting pressure, and the cement slurry is stored in the slurry box. The grouting pump provides air pressure to make the slurry flow from the slurry box through the grouting pipeline and injected into the sand layer. The grouting pipe is kept vertical during the grouting process, thereby realizing sand layer penetration grouting. After the grouting is completed, the same conditions are maintained, and then the mold is removed to measure various performance parameters of the grouting reinforcement body at different positions, and finally the influence of cement slurry water separation on the spatial distribution unevenness of the penetration grouting effect is obtained.
[0009] Furthermore, the grouting pressure and grouting rate of the grouting supply and pressure device meet the following conditions: the pore structure of the sand layer is not disturbed during the infiltration grouting process, and the rupture of the grouting pipe due to high pressure can be prevented.
[0010] Furthermore, the slurry storage box adopts a semi-open slurry storage box, which is convenient for stirring the cement slurry during grouting, and avoids the water separation effect caused by gravity when the slurry is left to stand during the grouting process, which affects the uniformity of the slurry.
[0011] Furthermore, the test bench is welded from steel pipes. A plurality of grouting pipe fixing holes are arranged on each side of the grouting pipe fixing bracket, and a plurality of grouting pipes can be placed at one time, so that large-scale tests can be carried out, test efficiency can be improved, and test errors can be reduced.
[0012] Furthermore, the length of the grouting pipe is 1.5-2m, so that the cement slurry can be fully analyzed with water. After the grouting is completed, a sufficient number of test blocks can be guaranteed when the grouting pipe is sampled in sections.
[0013] Furthermore, the reducer comprises a lower part, a connecting part and an upper part, wherein the lower part is cylindrical, the upper part is cylindrical, the connecting part is conical, the upper part and the lower part are connected by the connecting part to form a whole, and the radius of the lower part is smaller than the radius of the upper part; the reducer is used to prevent the sand layer from flowing into the valve from the PVC pipe under the action of gravity, thereby reducing the influence of sand leakage on the test, and at the same time effectively reducing the volume of the retention area of pure cement, thereby reducing its influence on the water separation process.
[0014] Furthermore, a fine wire mesh is laid at the reducer to further fix the injected medium and filter the cement slurry to prevent impurities from entering the grouting pipe and affecting the grouting reinforcement effect.
[0015] Furthermore, a fine wire mesh is laid inside the pipe cap, the mesh diameter of which does not exceed the diameter of the sand particles, allowing the slurry to enter and exit but not allowing the sand particles to pass through, thereby fixing the injected medium and ensuring that the sand particles do not move as a whole due to grouting diffusion during the grouting process.
[0016] In a second aspect, the present invention also provides a method for testing the effect of water separation of cement slurry on the effect of sand layer penetration grouting, the steps of which are:
[0017] Step 1: Filling. Close the valve at the bottom of the grouting pipe, control the particle size distribution of the sand layer by screening, control the density of the sand layer by the quality of the filled sand particles, fill the selected sand particles into the grouting pipe in layers according to the test design and compact them in layers, control the number of compactions and the compaction strength, and ensure that the sand particles fill the entire grouting pipe space.
[0018] Step 2: Assemble the test model and connect the pipeline. Glue the pipe cap, reducer and valve to the grouting pipe, fix the grouting pipe on the test bench, keep the grouting pipe vertical, connect the lower end of the grouting pipe to the high-pressure hose, and connect the other side of the high-pressure hose to the grouting device.
[0019] Step 3: Conduct grouting test. Open the valve at the bottom of the grouting pipe, and place the cement slurry with the corresponding water-cement ratio in the grouting tank according to the test design. Use the grouting pump to inject the cement slurry into the grouting pipe at a low speed until the grouting cap on the upper side of the grouting pipe starts to ooze out, and the grouting is completed. In order to avoid the grouting process affecting the uniformity of the grouting due to water separation, the grouting should be stirred while grouting.
[0020] Step 4: Curing and demolding. After the grouting is completed, all grouting pipes are placed in the curing room. After the curing reaches the specified conditions, demolding is carried out (the specific curing conditions are 20°C, humidity is above 95%, and demolding is carried out after curing for 7 days, 14 days, and 28 days respectively). When demolding, mark the cutting line every 10 cm from the bottom of the grouting pipe and cut it off in sequence to ensure that the surface of the sample is smooth and flat. At the outer edge of the cut grouting pipe, cut the grouting pipe vertically in the direction perpendicular to the cross-section, take out the grouting reinforcement, use a label to record the distance of each section of the grouting reinforcement from the bottom and number it.
[0021] Step 5: Determine the grouting effect. The uniaxial compressive strength of the grouting-reinforced solid specimen is measured using a universal testing machine, and the deformation modulus is calculated based on the corresponding stress-strain curve; the permeability coefficient is measured using a permeability coefficient measuring instrument, and the grouting effect is characterized by the uniaxial compressive strength, deformation modulus and permeability coefficient of the grouting-reinforced solid.
[0022] Step 6: Process the test data and draw a curve showing the change of reinforcement effect index (uniaxial compressive strength, deformation modulus and permeability coefficient) with the height of the space from the bottom of the grouting pipe.
[0023] The invention discloses a device and a method for testing the influence of water separation of cement slurry on the effect of sand layer penetration grouting, which realizes the quantitative test of the spatial distribution non-uniformity of the performance of grouting reinforcement body due to water separation effect.
[0024] The present invention has the following advantages:
[0025] 1. The device as a whole realizes the quantitative test of the spatial distribution unevenness of the performance of the sand layer penetration grouting reinforcement body by the water separation effect of cement slurry;
[0026] 2. This grouting device can achieve the goal of not disturbing the pore structure of the sand layer during the infiltration grouting process, and can also prevent the grouting pipe from rupturing due to high pressure; this device adopts a semi-open grout storage box, which is convenient for stirring the cement slurry while grouting, avoiding the water separation effect caused by gravity when the slurry is standing during the grouting process, which affects the uniformity of the slurry, ensuring that the cement slurry does not produce water separation in advance, and the slurry is homogeneous during the grouting process;
[0027] 3. A fine wire mesh is laid inside the pipe cap. The mesh diameter of the wire mesh does not exceed the diameter of the sand particles. It allows the slurry to enter and exit, but does not allow sand particles to pass through, thereby fixing the injected medium and ensuring that the sand particles do not move as a whole due to grouting diffusion during the grouting process.
[0028] 4. The test bench is welded from steel pipes. Multiple grouting pipe fixing holes are set on each side of the grouting pipe fixing bracket, which can place multiple grouting pipes at one time, so as to realize large-scale testing, improve test efficiency and reduce test errors.
[0029] 5. Use a reducer to prevent the sand layer from flowing into the valve from the PVC pipe under the action of gravity, reduce the impact of sand leakage on the test, and effectively reduce the volume of the retention area of pure cement, reducing its impact on the water separation process; lay a fine wire mesh at the reducer to further fix the injected medium and filter the cement slurry to prevent impurities from entering the grouting pipe and affecting the grouting reinforcement effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The suitable embodiments of the present application and the instructions for use thereof are used to explain the present application and do not constitute an improper determination of the present application.
[0031] Figure 1 It is the overall framework diagram of the grouting system;
[0032] Figure 2(a) and Figure 2(b) are cross-sectional views of the reducer and the pipe cap;
[0033] Figure 3 It is the longitudinal section and truncation schematic diagram of the grouting pipe;
[0034] Figure 4 Schematic diagram of the method for removing the mold after grouting and solidification.
[0035] In order to show the position of each part, the distance or size between them is exaggerated, and the schematic diagram is only for illustration. In the figure: 1--slurry supply and extrusion device; 2--slurry storage box; 3--cement slurry; 4--high pressure hose; 5--valve; 6--reducing joint; 7--grouting pipe; 8--pipe cap; 9--sand particles; 10--test bench; 11--grouting pipe fixing bracket; 12--grouting reinforcement body; 13--cutting line; 14--demolding sample; 15--pipe wall; 16--wire mesh; 17--air vent; 18--slurry inlet; 19--grouting pump. DETAILED DESCRIPTION
[0036] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0037] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or their combinations;
[0038] As introduced in the background technology, when underground projects are built in strata with good pore connectivity such as gravel layers and coarse and medium sand layers, infiltration grouting is the most common method to reinforce the above-mentioned strata. At the same time, cement slurry is currently the most commonly used grouting material. Cement slurry is widely used in grouting projects, but cement slurry itself has a water separation effect. The precipitation of water and the sedimentation of cement particles will lead to the uneven distribution of cement slurry in space, making the reinforcement effect of the lower part of the grouting reinforcement body good and the upper part poor. The grouting effect varies greatly in space. The unevenness of the grouting reinforcement effect of the sand layer will have a significant impact on the stability of the proposed reinforcement project. However, the current grouting design cannot take into account the water separation effect of cement slurry, and there is no device and method that can quantitatively test this difference. In order to solve the above technical problems, the present application proposes a device and method for testing the influence of cement water separation on the infiltration grouting effect of sand layers.
[0039] In a typical implementation of the present application, Figure 1As shown, a device for testing the effect of cement dewatering on the effect of sand layer penetration grouting can realize the quantitative test of the spatial distribution unevenness of the cement dewatering effect on the sand layer penetration grouting reinforcement effect. It includes a grouting device 1, a test bench 10, and a grouting pipe 7. The test provides grouting pressure through the grouting device 1, while the cement slurry 3 is stored in the slurry storage box 2 and flows through the high pressure hose 4 through the action of the grouting pump 19, and finally injected into the sand particles 9 in the grouting pipe 7. During the test, the grouting pipe 7 remains vertical.
[0040] The grouting device 1 provides grouting pressure. The grouting device can realize low-pressure slow infiltration, does not disturb the pore structure of the sand layer during the infiltration grouting process, and can prevent the grouting pipe 7 from rupture due to high pressure; the device includes a semi-open grouting box 2 and a grouting pump 19. The grouting box 2 is semi-open, which is convenient for stirring the cement slurry 3 while grouting, and avoids the water separation effect caused by gravity when the slurry is static during the grouting process, which affects the uniformity of the slurry. The grouting box 2 is connected to the grouting pipe 7 through the grouting pump 19 and the high-pressure hose 4.
[0041] The test bench 10 is welded from steel pipes, and a plurality of fixing holes are arranged on each side of the grouting pipe fixing bracket 11, so that a plurality of grouting pipes 7 can be placed at one time; in this embodiment, 10 fixing holes are arranged on each side of the grouting pipe fixing bracket 11, so that a maximum of 20 grouting pipes 7 can be placed at one time, so that large-scale tests can be carried out, test efficiency can be improved, and test errors can be reduced. Figure 1 In the embodiment, only 9 grouting pipes 7 are provided.
[0042] like Figure 3 As shown, each grouting pipe 7 includes a pipe cap 8, a PVC pipe, a reducer 6, and a valve 5. The pipe cap 8 is installed at the upper end of the PVC pipe, the reducer 6 is installed at the lower end of the PVC pipe, and the valve 5 is installed under the reducer 6. The grouting pipe 7 is always kept vertical during the test, and the grouting pipe 7 is 1.5 to 2 meters long. Specifically, the specific connection method between the pipe cap 8, the PVC pipe, the reducer 6, and the valve 5 can be bonding, welding, threaded connection, etc., which can be selected according to actual needs.
[0043] Among them, the grouting pipe 7 is always kept vertical to ensure that the water separation direction of the cement slurry 3 is consistent with the axial direction of the grouting pipe 7. At the same time, the grouting pipe 7 is 1.5 to 2 meters long, so that the cement slurry 3 can be fully separated by water. After the grouting is completed, a sufficient number of test blocks can be guaranteed when the grouting pipe 7 is sampled in sections.
[0044] The pipe cap 8 is provided with a vent hole 17 to ensure that the gas in the pipe is fully discharged during the infiltration grouting process, and when the pipe cap 8 starts to emit slurry, it means that the cement slurry 3 in the PVC pipe is full and the grouting is completed. Further, as shown in FIG2(a), a fine wire mesh 16 is laid in the pipe cap 8, and the mesh diameter of the wire mesh does not exceed the diameter of the sand particles 9, allowing the slurry to enter and exit, but not allowing the sand particles 9 to pass through, thereby fixing the injected medium and ensuring that the sand particles 9 do not move as a whole due to the diffusion of the grouting during the grouting process;
[0045] In this embodiment, a reducer 6 is used to prevent the sand layer from flowing from the PVC pipe into the valve 5 under the action of gravity, thereby reducing the impact of sand leakage on the test, and effectively reducing the volume of the retention area of pure cement, thereby reducing its impact on the water separation process; the specific structure of the reducer 6 is that the inner diameter of the bottom is smaller than the inner diameter of the upper part, including the lower part, the connecting part and the upper part, wherein the lower part is cylindrical, the upper part is cylindrical, the connecting part is conical, the upper part and the lower part are connected to form a whole through the connecting part, and the radius of the lower part is smaller than the radius of the upper part. A fine wire mesh 16 is laid at the reducer 6, as shown in FIG2(b), which is used to further fix the injected medium and filter the cement slurry 3 to prevent impurities from entering the grouting pipe 7 and affecting the grouting reinforcement effect.
[0046] Furthermore, the valve 5 mentioned above adopts the existing valve structure, and the valve 5 is connected to the slurry supply and pressure device 1 through a high pressure-resistant hose 4 .
[0047] This device simulates the infiltration grouting process of cement slurry in the sand layer, realizes the simulation of the water separation effect of cement slurry, and realizes the quantitative test of the spatial distribution unevenness of the infiltration grouting reinforcement effect of the sand layer by measuring the various performance parameters of the slurry stone body at different positions after the grouting. The test provides grouting pressure through the grouting pump, and the cement slurry is stored in the slurry storage box. The grouting pump provides air pressure to make the slurry flow from the slurry storage box through the grouting pipeline and inject it into the sand layer. The grouting pipe is kept vertical during the grouting process, thereby realizing the infiltration grouting of the sand layer. After the grouting is completed, the same conditions are maintained for a certain period of time, and then the mold is removed to measure the various performance parameters of the grouting reinforcement body at different positions, and finally the influence of water separation of cement slurry on the spatial distribution unevenness of the infiltration grouting effect is obtained.
[0048] Furthermore, the specific implementation method of the present invention is further described below in conjunction with the drawings and embodiments.
[0049] The grouting material used was cement slurry with W:C=1.0, and the injected medium was medium sand (particle size range 2.5-5mm). The experimental steps were as follows:
[0050] Step 1: Filling. Close the valve 5 at the lower side of the grouting pipe 7, fill the selected sand particles into the infiltration grouting pipe 7 in layers and compact them in layers, control the compaction times and compaction strength, and ensure that the sand particles 9 fill the entire grouting pipe 7 space.
[0051] Step 2: Assemble the test model and connect the pipelines.
[0052] Connect the pipe cap 8, reducer 6 and valve 5 to the grouting pipe 7. Fix the grouting pipe 7 on the test bench 10. Keep it vertical. The lower end of the grouting pipe 7 is connected to the high-pressure hose 4. The other side of the high-pressure hose 4 is connected to the slurry extrusion device 1.
[0053] The pipe cap 8 is pre-processed with a vent hole 17, and a wire mesh 16 is pre-placed inside; the wire mesh 16 is also pre-fixed inside the reducer 6;
[0054] Step 3: Conduct grouting test. Open the valve 5 at the lower side of the grouting pipe 7, pour the pre-configured W:C=1.0 cement slurry 3 into the slurry storage box 2, and use the grouting pump 19 to inject the cement slurry 3 into the grouting pipe 7 at a low speed until the grouting pipe 7 cap 8 on the upper side of the grouting pipe 7 emits slurry, and the grouting is completed.
[0055] Step 4: Curing and demolding. After the grouting is completed, all grouting pipes 7 are placed in a curing room with a curing condition of 20°C and a humidity of more than 95%. The molds are removed after curing for 7 days, 14 days, and 28 days respectively. When demolding, mark the cutting lines 13 every 10 cm from the bottom of the grouting pipe 7 and cut them off in sequence. At the outer edge of each section of the grouting pipe 7, cut the grouting pipe 7 vertically in a direction perpendicular to the cross-section, take out the grouting reinforcement 12, and use labels to record the distance of each section of the grouting reinforcement 12 from the bottom and number them; the specific details are as follows: Figure 4 shown.
[0056] Step 5: Determine the grouting effect. The uniaxial compressive strength of the grouting and solid specimen is measured using a universal testing machine, and the deformation modulus is calculated based on the stress-strain curve; the permeability coefficient is measured using a permeability coefficient measuring instrument. The grouting effect is characterized by the uniaxial compressive strength, deformation modulus, and permeability coefficient of the grouting and solid 12.
[0057] Step 6: Process the test data and draw the reinforcement effect indicators, namely, the uniaxial compressive strength, deformation modulus and permeability coefficient, with the change curve of the space height from the bottom of the grouting pipe 7.
[0058] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A device for testing the effect of cement water separation on the sand layer penetration grouting effect, characterized in that: It includes a grouting device, a test bench, and a grouting pipe; The grouting pipes include a plurality of grouting pipes, which are fixed on the test bench, and the grouting device provides grouting pressure for each grouting pipe; Each grouting pipe includes a pipe cap, a PVC pipe, a reducer and a valve. The upper end of the PVC pipe is connected to the pipe cap, and a vent hole is provided on the pipe cap. A fine wire mesh is laid inside the pipe cap, and the mesh diameter of the wire mesh does not exceed the diameter of the sand particles. The lower end of the PVC pipe is connected to the reducer, and a valve is installed under the reducer. The grouting pipe is always kept vertically on the test bench to ensure that the water separation direction of the cement slurry is consistent with the axial direction of the grouting pipe. The grouting device comprises a grouting pump and a grouting tank. The grouting pump is used to provide grouting pressure in the test. At the same time, cement slurry is stored in the grouting tank. The grouting pump provides air pressure to make the slurry flow from the grouting tank through the grouting pipeline and injected into the sand layer. The grouting pipe is kept vertical during the grouting process, thereby achieving sand layer penetration grouting. After the grouting is completed, the same conditions are maintained, and then the mold is removed to measure various performance parameters of the grouting reinforcement body at different positions, and finally the influence of cement slurry water separation on the spatial distribution unevenness of the penetration grouting effect is obtained. When removing the formwork, mark the cutting line every 10cm from the bottom of the grouting pipe and cut it off in sequence. At the outer edge of each section of the grouting pipe, cut the grouting pipe vertically in the direction perpendicular to the cross section, take out the grouting reinforcement, use a label to record the distance of each section of the grouting reinforcement from the bottom and number it; The uniaxial compressive strength of the grouting reinforced solid specimen was measured by a universal testing machine, and the deformation modulus was calculated based on the stress-strain curve; the permeability coefficient was measured by a permeability coefficient measuring instrument; The grouting effect is characterized by the uniaxial compressive strength, deformation modulus and permeability coefficient of the grouting reinforcement body; the reinforcement effect indicators, namely the uniaxial compressive strength, deformation modulus and permeability coefficient, are plotted as a function of the spatial height from the bottom of the grouting pipe.
2. A device for testing the effect of cement water separation on sand layer penetration grouting effect as claimed in claim 1, characterized in that: The grouting pressure and grouting rate of the grouting supply and pressure device meet the following conditions: the pore structure of the sand layer is not disturbed during the infiltration grouting process, and the rupture of the grouting pipe due to high pressure can be prevented.
3. A device for testing the effect of cement water separation on sand layer penetration grouting effect as claimed in claim 1, characterized in that: The slurry storage box is a semi-open slurry storage box.
4. A device for testing the effect of cement water separation on sand layer penetration grouting effect as claimed in claim 1, characterized in that: The length of the grouting pipe is 1.5-2m.
5. A device for testing the effect of cement water separation on sand layer penetration grouting effect as claimed in claim 1, characterized in that: The reducer comprises a lower part, a connecting part and an upper part, wherein the lower part is cylindrical, the upper part is cylindrical, the connecting part is conical, the upper part and the lower part are connected to form a whole through the connecting part, and the radius of the lower part is smaller than the radius of the upper part.
6. A device for testing the effect of cement water separation on sand layer penetration grouting effect as claimed in claim 1, characterized in that: A fine wire mesh is laid at the reducer.
7. A method for testing the effect of cement slurry water separation on sand layer penetration grouting effect using the device described in any one of claims 1 to 6, characterized in that: The steps are: Step 1: Filling Fill the selected sand particles into the grouting pipe according to the test design, control the compaction times and compaction strength to ensure that the sand particles fill the entire grouting pipe space; Step 2: Assemble the test model and connect the pipeline; Install the pipe cap, reducer and valve on the grouting pipe, fix the grouting pipe on the test bench, connect the lower end of the grouting pipe with a high-pressure hose, and connect the other side of the high-pressure hose to the grouting device; Step 3: Conduct grouting test Open the valve at the lower side of the grouting pipe, place cement slurry with the corresponding water-cement ratio according to the test design in the slurry storage box, and use the grouting pump to inject cement slurry into the grouting pipe at a low speed; Step 4: Maintenance and demoulding After grouting, all grouting pipes are placed in a curing room at 20°C and humidity above 95%. They are removed after curing for 7, 14 and 28 days respectively. When removing the mold, cut lines are marked every 10 cm from the bottom of the grouting pipe and cut off in sequence. At the outer edge of each section of the grouting pipe, the grouting pipe is cut vertically in a direction perpendicular to the cross section, and the grouting reinforcement is taken out. The distance of each section of the grouting reinforcement from the bottom is recorded with a label and numbered. Step 5: Determine the grouting effect The uniaxial compressive strength of the grouting reinforced solid specimen was measured by a universal testing machine, and the deformation modulus was calculated based on the stress-strain curve; the permeability coefficient was measured by a permeability coefficient measuring instrument; The grouting effect is characterized by the uniaxial compressive strength, deformation modulus and permeability coefficient of the grouting reinforcement. Step 6: Process the test data and draw the reinforcement effect indicators, that is, the curves of the uniaxial compressive strength, deformation modulus and permeability coefficient changing with the spatial height from the bottom of the grouting pipe, to quantitatively obtain the spatial distribution unevenness of the grouting reinforcement effect.
8. The method according to claim 7, characterized in that The particle size distribution of the sand particles in the sand layer is controlled by screening method, the density of the sand layer is controlled by the quality of the packed sand particles, and the sand particles are filled into the infiltration grouting pipe in layers and compacted in layers.
9. The method according to claim 7, characterized in that Grouting is done while stirring. The grouting pipe should be kept vertical during the grouting process. When grout comes out of the pipe cap, it means that the pipe is full of cement slurry and the grouting is completed.
