An integral drop method for cast-in-place beam supports of a tied arch bridge across a highway

Through the overall landing method and suspension system, the traffic door brackets of the highway tie arch bridge are gradually dismantled, which solves the problems of low efficiency and high safety risks of the traditional method, and realizes the efficient and safe removal of the highway brackets.

CN115262397BActive Publication Date: 2024-10-15CCCC THIRD HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210810377.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-11
Publication Date
2024-10-15
Estimated Expiration
2042-07-11

AI Technical Summary

Technical Problem

The traditional method of dismantling the brackets of tied arch bridges on highways has low efficiency and high safety risks. It cannot meet the construction period requirements of the expressway company. Moreover, it is more difficult to dismantle the brackets due to the impact of clearance, requiring half of the road to be closed for construction.

Method used

The overall landing method is adopted, and the suspension system and hydraulic jack are used to carry out the overall suspension landing. The traffic door opening bracket is gradually removed through the sand bucket support and suspension system, which reduces the working time and safety risks of construction personnel on the highway and improves the demolition process. stability and security.

Benefits of technology

The safety, reliability and efficiency of highway support removal were achieved, the construction time was reduced, safety risks were reduced, and the construction period requirements of the highway company were met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115262397B_ABST
    Figure CN115262397B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for integrally dismantling a cast-in-place beam support of a tied arch bridge across a highway. Applicable cast-in-place beam supports include long-mileage Bailey supports and short-mileage Bailey supports located on both sides of the highway in a one-to-one correspondence, and traffic gate supports located on the highway. The present invention is used to dismantle the traffic gate supports and successively carry out the process of dismantling the long-mileage side half-width gate support and the process of dismantling the short-mileage side half-width gate support. The highway of the long-mileage side half-width gate is first closed by borrowing a road, then demoulding, and then the bottom mold is pulled out to the outside of the highway, and then the suspension system is installed, and finally the long-mileage side half-width gate longitudinal beam system is lowered to the highway through the suspension system. The process of dismantling the short-mileage side half-width gate support is the same as the process of dismantling the long-mileage side half-width gate support. The present invention uses the jack of the suspension system to lift the oil return to steadily lower the support, so as to realize the integral suspension dismantling, which is convenient to operate, highly safe, and can effectively shorten the operation time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an integral dropping method of a cast-in-situ beam support of a tied arch bridge across a highway. Background Art

[0002] In order to accelerate the pace of my country's economic development, my country is vigorously developing highway and bridge construction. A super-large tied arch bridge built in a coastal area crosses the highway of a city in the area. The bridge adopts the construction method of first beam and then arch. The span of the box beam of this bridge is 96m, the longitudinal slope is 2%, and the average net height of the beam bottom is 5.9m. The central dividing strip of the cast-in-place highway adopts the traffic gate bracket with a span combination of 14.7+14.7m. Bailey brackets are used on both sides of the highway. There are two gates in the longitudinal elevation of the traffic gate bracket. The specific form of the traffic gate bracket is: expanded foundation + Ф820×10mm steel pipe column + sand bucket + double HN700*300 pile top distribution beam + 5mm steel plate + HN900*300 steel longitudinal beam + 16 I-beam transverse distribution beam + longitudinal square wood + bamboo plywood. The bridge spans the highway section as the main road, with four lanes in both directions and a large traffic volume. Due to the influence of clearance, the traffic gate bracket is bamboo plywood-longitudinal square wood-16# I-beam transverse distribution beam-HN900*300 steel longitudinal beam-HN700*300 pile top distribution beam-sand bucket support-steel pipe column-expanded foundation. The brackets are closely attached to each other, which increases the difficulty of removing the traffic gate bracket. In addition, half of the road needs to be closed for construction across the highway section when the bracket is removed. The traditional method of bracket removal is to use a car crane to remove the bracket construction materials one by one. Not only is the work efficiency low, but also the safety risk is high, and the highway is occupied for a long time, which cannot meet the construction period requirements put forward by the highway company. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the prior art and provide a method for integrally dismantling a cast-in-place beam support of a tied arch bridge across a highway, which can ensure the safety and reliability of the support removal on the highway section, greatly improve the efficiency of the support removal, and meet the requirements of the support removal period.

[0004] The object of the present invention is achieved by: an integral drop method of a cast-in-place beam support of a tied arch bridge across a highway, wherein the applicable cast-in-place beam support is arranged between a large-mileage bridge pier and a small-mileage bridge pier and comprises a large-mileage Bailey support located on one side of the highway, a traffic door support located on the highway, and a small-mileage Bailey support located on the other side of the highway;

[0005] The traffic gate support includes a lower support, a bottom formwork of a half-width gate beam on the long-mileage side, and a bottom formwork of a half-width gate beam on the short-mileage side; wherein the lower support includes a row of long-mileage side steel pipe supports, a row of mid-span steel pipe supports, and a row of short-mileage side steel pipe supports, and each row of steel pipe supports is composed of four steel pipe columns; the bottoms of the four steel pipe columns of the long-mileage side steel pipe supports are fixed on an expanded foundation located on one shoulder of the expressway, the bottoms of the four steel pipe columns of the mid-span steel pipe supports are fixed on an expanded foundation located on the central dividing strip of the expressway, and the bottoms of the four steel pipe columns of the short-mileage side steel pipe supports are each fixed one-to-one through a cushion beam on four pile foundations located outside the shoulder on the other side of the expressway; a sand bucket support is provided on the top of each steel pipe column, and a long-mileage side pile top distribution beam, a mid-span pile top distribution beam, and a short-mileage side pile top distribution beam are erected one-to-one on the sand bucket supports of the long-mileage side steel pipe supports, the mid-span steel pipe supports, and the short-mileage side pile top distribution beams are erected one-to-one on the sand bucket supports. The bottom formwork of the half-width portal beam on the long mileage side is set between the long mileage side pile top distribution beam and the mid-span pile top distribution beam. The bottom formwork of the half-width portal beam on the long mileage side includes multiple long mileage H-shaped steel longitudinal beams, transverse distribution beams, longitudinal square timbers and bottom formwork bamboo plywood arranged from bottom to top; the bottom formwork of the half-width portal beam on the short mileage side is set between the mid-span pile top distribution beam and the short mileage side pile top distribution beam. The bottom formwork of the half-width portal beam on the short mileage side includes multiple short mileage H-shaped steel longitudinal beams, transverse distribution beams, longitudinal square timbers and bottom formwork bamboo plywood arranged from bottom to top. Wood and bottom formwork bamboo plywood; multiple H-shaped steel longitudinal beams of large mileage sections and multiple H-shaped steel longitudinal beams of small mileage sections are staggered, with a staggered length of 0.5m, and the upper wing plates at the ends of multiple H-shaped steel longitudinal beams of large mileage sections and the upper wing plates in the middle of the span are respectively welded and connected by transverse channel steels to form a longitudinal beam system of the half-width door opening on the large mileage side; the upper wing plates at the ends of multiple H-shaped steel longitudinal beams of small mileage sections and the upper wing plates in the middle of the span are respectively welded and connected by transverse channel steels to form a longitudinal beam system of the half-width door opening on the small mileage side;

[0006] The sand bucket support comprises a lower sand bucket and an upper support arranged on the lower sand bucket; the lower sand bucket is filled with sand, and a plurality of sand outlet holes are evenly distributed on the lower bucket wall of the lower sand bucket, and a plugging bolt is installed in each sand outlet hole;

[0007] The overall dismantling method is used to dismantle the traffic door opening bracket and includes a process of dismantling the half-width door opening bracket on the large mileage side and a process of dismantling the half-width door opening bracket on the small mileage side:

[0008] The process of removing the large mileage side half-width door opening bracket includes the following steps:

[0009] Step 1: First, close the highway of the half-width portal opening on the long-mileage side corresponding to the bottom formwork of the half-width portal opening beam on the long-mileage side, then simultaneously lower the sand bucket supports on the top of the two middle steel pipe columns of the steel pipe support on the long-mileage side and the sand bucket supports on the top of the two middle steel pipe columns of the steel pipe support in the middle of the span, and then simultaneously lower the sand bucket supports on the top of the two steel pipe columns on the left and right sides of the steel pipe support on the long-mileage side and the sand bucket supports on the top of the two steel pipe columns on the left and right sides of the steel pipe support in the middle of the span; when lowering the sand bucket supports, first remove the blockage of the sand outlet hole of the lower sand bucket Bolts, use a high-pressure water gun to flush away the sand in the lower sand bucket, so that the upper support sinks and the bottom mold of the large mileage side half-width portal beam is demoulded; immediately after demoulding, the lower sand bucket and the upper support of each sand bucket support are welded into a whole with two channel steels, and the top surfaces of the two channel steels are higher than the top surfaces of the large mileage side pile top distribution beam and the top surfaces of the mid-span pile top distribution beam; then use a car crane in the closed area of ​​the highway to drag the bottom mold bamboo plywood, longitudinal square wood and transverse distribution beam of the bottom mold of the large mileage side half-width portal beam in the direction of the large mileage in turn out of the large mileage side half-width portal, and then transfer and hoist to a safe area;

[0010] Step 2: Install the suspension system and four upper crossbeam anchoring mechanisms, the suspension system includes two upper crossbeams, two lower crossbeams, four hanger mechanisms and four hydraulic jacks; the two upper crossbeams are both arranged on the bridge deck and are located one-to-one at the pile positions of the steel pipe support on the large mileage side and the pile positions close to the mid-span steel pipe support; the two lower crossbeams and the two upper crossbeams are arranged one-to-one on the bottom surface of the half-width portal longitudinal beam system on the large mileage side, and the lower crossbeam located on the steel pipe support on the large mileage side utilizes the large mileage side pile top distribution beam; each hanger mechanism includes a precision-rolled threaded steel bar, an upper pad beam, an upper gasket, an upper nut, a lower pad beam, a lower gasket and a lower nut The fine-rolled threaded steel bars of the four suspension rod mechanisms are correspondingly arranged between the two ends of the two upper cross beams and the two ends of the two lower cross beams. The upper part of each fine-rolled threaded steel bar is fastened by an upper cushion beam, an upper gasket and an upper nut, and the lower part of each fine-rolled threaded steel bar is fastened by a lower cushion beam, a lower gasket and a lower nut; four hydraulic jacks are correspondingly installed on the upper part of the four fine-rolled threaded steel bars and are located between the upper cushion beam and the upper gasket; four upper cross beam anchoring mechanisms are correspondingly arranged between the middle part of the two upper cross beams and the bridge deck, and each upper cross beam anchoring mechanism includes an upper pressure beam, a lower pressure beam, an anchor rod, an upper anchor nut and a lower anchor nut;

[0011] First install the suspension system, then install the four upper crossbeam anchoring mechanisms, so that the longitudinal beam system of the large mileage side half-width portal opening is suspended on the bridge deck of the large mileage side half-width portal opening;

[0012] Step 3: First, use the four hydraulic jacks in the suspension system to lift the half-width portal longitudinal beam system on the long-mileage side by 15cm to 25cm, then use gas cutting to cut off the transverse channel steel on the half-width portal longitudinal beam system on the long-mileage side, and then use the chain hoist connected to the long-mileage bridge pier to pull out multiple long-mileage H-shaped steel longitudinal beams in groups of two in the long-mileage direction at the same time from the mid-span pile top distribution beam, so that the multiple long-mileage H-shaped steel longitudinal beams are separated from the half-width portal longitudinal beam system on the short-mileage side, and then re-weld the transverse channel steels between the upper wing plates of the multiple long-mileage H-shaped steel longitudinal beams to form the long-mileage side half-width portal longitudinal beam system;

[0013] Step 4: first dismantle the four steel pipe columns supported by the large mileage side pile top distribution beam and the large mileage side steel pipe in turn, and set up a temporary steel support on the road surface of the expressway near the central dividing strip, and then use the four hydraulic jacks of the suspension system to slowly lower the lower crossbeam and the large mileage side half-width portal longitudinal beam system above it in stages, and lower the large mileage side half-width portal longitudinal beam system to the temporary steel support and the expanded foundation on one side of the expressway shoulder in the order of first high and then low in the longitudinal bridge direction, and finally use a crane to lift the large mileage side half-width portal longitudinal beam system to a safe area next to the expressway, and restore the expressway traffic of the large mileage side half-width portal;

[0014] The process of removing the small mileage side half-width door opening bracket includes the following steps:

[0015] Step 1: First, close the expressway of the small mileage side half-width portal opening corresponding to the small mileage side half-width portal opening beam bottom formwork, then simultaneously lower the sand bucket supports on the top of the two steel pipe columns in the middle of the small mileage side steel pipe support, and then simultaneously lower the sand bucket supports on the top of the two steel pipe columns on the left and right sides of the small mileage side steel pipe support, so that the small mileage side half-width portal opening beam bottom formwork is demoulded; immediately after demoulding, the lower sand bucket and the upper support of each sand bucket support are welded into a whole with two channel steels, and the top surfaces of the two channel steels are higher than the top surfaces of the small mileage side pile top distribution beams; then, use a car crane in the closed area of ​​the expressway to drag the bottom formwork bamboo plywood, longitudinal square wood and transverse distribution beam of the small mileage side half-width portal opening beam bottom formwork in the small mileage direction out of the small mileage side half-width portal opening, and then transfer and hoist it to a safe area;

[0016] Step 2: Install the suspension system and four upper crossbeam anchoring mechanisms. The two upper crossbeams of the suspension system are both arranged on the bridge deck and are one-to-one close to the piles of the mid-span steel pipe support and the piles of the steel pipe support on the small mileage side. The two lower crossbeams and the two upper crossbeams of the suspension system are one-to-one correspondingly arranged on the bottom surface of the longitudinal beam system of the small mileage side half-width portal opening, so that the longitudinal beam system of the small mileage side half-width portal opening is suspended on the bridge deck of the small mileage side half-width portal opening.

[0017] Step 3: First, use the four hydraulic jacks in the suspension system to lift the half-width portal longitudinal beam system on the short-mileage side by 15cm to 25cm, then use gas cutting to cut off the transverse channel steel on the half-width portal longitudinal beam system on the short-mileage side, and then use the chain hoist connected to the long-mileage bridge pier to pull out multiple H-shaped steel longitudinal beams of the short-mileage section in groups of two at the same time in the long-mileage direction from the top distribution beam of the pile on the short-mileage side, and then re-weld the transverse channel steels between the upper wing plates of multiple H-shaped steel longitudinal beams of the short-mileage section to form the half-width portal longitudinal beam system on the short-mileage side;

[0018] Step 4: First, dismantle the mid-span pile top distribution beam and the four steel pipe columns supported by the mid-span steel pipe in sequence, and set up a temporary steel support on the shoulder on the other side of the expressway. Then, use the four hydraulic jacks of the suspension system to slowly lower the lower crossbeam and the small mileage side half-width portal longitudinal beam system above it in stages, and lower the small mileage side half-width portal longitudinal beam system to the expanded foundation and temporary steel support located in the central dividing strip in the order of first high and then low in the longitudinal bridge direction. Finally, use a crane to lift the small mileage side half-width portal longitudinal beam system to a safe area beside the expressway.

[0019] Step five is to remove the expanded foundation located on the central dividing strip of the expressway and the expanded foundation located on one side shoulder of the expressway to restore two-way traffic on the expressway.

[0020] The above-mentioned method for integrally dismantling the cast-in-place beam support of the tied arch bridge across the expressway includes, during step two of the process of dismantling the half-width door opening support on the long-mileage side and step two of the process of dismantling the half-width door opening support on the short-mileage side, a working platform is respectively set up at the position where the fine-rolled threaded steel bars are installed on the two upper cross beams, the platform frame is constructed with channel steel, bamboo plywood is laid on the platform frame, and safety railings are also set up on the periphery of the platform frame.

[0021] The above-mentioned method for integrally dismantling the cast-in-place beam support of the tied arch bridge across the expressway, wherein, during step three of the process of dismantling the half-width portal support on the long-mileage side and step three of the process of dismantling the half-width portal support on the short-mileage side, a set of safety suspension rod mechanisms are respectively arranged on the outer sides of the four fine-rolled threaded steel bars of the suspension system to reinforce the connection between the two upper beams and the two lower beams.

[0022] The method for integrally dismantling the cast-in-place beam support of a tied arch bridge across a highway of the present invention has the following characteristics: the hydraulic jack in the suspension system is used to lift and return the oil for smooth lowering to achieve integral suspended dismantling, thereby reducing the working time of construction personnel on the highway and the safety risks during the dismantling process, overcoming the limitations of narrow on-site sites and large mechanical equipment, and greatly improving the overall stability and construction safety of the traffic gate support dismantling process. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1It is a longitudinal elevation view of a cast-in-place beam support of a tied arch bridge across a highway to which the present invention is applicable;

[0024] Figure 2 It is a cross-sectional view of a traffic gate support portion of a cast-in-place beam support of a tied arch bridge across a highway to which the present invention is applicable;

[0025] Figure 3 It is a plan layout diagram of the longitudinal beams in the cast-in-place beam support of the tied arch bridge across the highway to which the present invention is applicable;

[0026] Figure 4 A schematic structural diagram of a sand bucket support in a cast-in-place beam support of a tied arch bridge across a highway to which the present invention is applicable;

[0027] Figure 5 It is a structural schematic diagram of the method for integrally dismounting a cast-in-place beam support of a tied arch bridge across a highway of the present invention after the sand bucket support is lowered during step 1;

[0028] Figure 6 It is a schematic diagram of the structure of the suspension system adopted by the present invention;

[0029] Figure 7 It is a structural schematic diagram of installing the suspension system and four upper crossbeam anchoring mechanisms in the step 2 of the integral dismounting method of the cast-in-place beam support of the tied arch bridge across the highway of the present invention;

[0030] Figure 8 yes Figure 7 A top view of

[0031] Fig. 9 It is a longitudinal elevation view of the integral dismounting method of the cast-in-place beam support of the tied arch bridge across the highway of the present invention when performing step three;

[0032] Fig.10 It is a longitudinal elevation view of the integral dismounting method of the cast-in-place beam support of the tied arch bridge across the highway of the present invention when performing step 4;

[0033] Fig.11 It is a longitudinal elevation view of the integral dismounting method of the cast-in-place beam support of the tied arch bridge across the expressway of the present invention when performing step eight. DETAILED DESCRIPTION

[0034] The present invention will be further described below in conjunction with the accompanying drawings.

[0035] See also Figures 1 to 4The present invention provides an integral dismounting method for a cast-in-place beam support of a tied arch bridge across a highway. The applicable cast-in-place beam support is arranged between a large-mileage bridge pier 100 and a small-mileage bridge pier 200 and includes a large-mileage Bailey support located on one side of the highway, a traffic gate support located on the highway, and a small-mileage Bailey support located on the other side of the highway.

[0036] The long-distance Bailey support includes three rows of steel pipe supports with pile numbers N12, N11, and N10 and a long-distance beam bottom mold. Each row of steel pipe supports consists of four steel pipe columns 10. The bottoms of the four steel pipe columns with pile number N12 are all fixed on the pedestal 100 of the long-distance bridge pier. The bottoms of the four steel pipe columns with pile number N11 are all fixed on a first expanded foundation 101 located outside the shoulder of one side of the expressway. The bottoms of the four steel pipe columns with pile number N10 are all fixed on the first expanded foundation 101 located outside the shoulder of one side of the expressway. The bottom is fixed on a second expanded foundation 102 located on the shoulder of one side of the expressway; a sand bucket support 11 is arranged on the top of each steel pipe column, and a pile top distribution beam 12 is respectively set on the sand bucket supports 11 supported by three rows of steel pipes, and the large mileage beam bottom formwork is set on the three pile top distribution beams 12, and the large mileage beam bottom formwork includes a plurality of large mileage Bailey longitudinal beams 131, transverse distribution beams 14, longitudinal square timbers 15 and bottom formwork bamboo plywood 16 arranged from bottom to top.

[0037] The traffic gate support includes a lower support, a bottom formwork of a half-width gate beam on the long-mileage side, and a bottom formwork of a half-width gate beam on the short-mileage side; wherein the lower support includes a row of long-mileage side steel pipe supports with a pile number of N9, a row of mid-span steel pipe supports with a pile number of N8, and a row of short-mileage side steel pipe supports with a pile number of N7, and each row of steel pipe supports is composed of four steel pipe columns 10; the bottoms of the four steel pipe columns of the long-mileage side steel pipe supports are also fixed on the second expanded foundation 102, and the bottoms of the four steel pipe columns of the mid-span steel pipe supports are all fixed on a central portion of the expressway. On the third expanded foundation 103 of the dividing strip, the bottoms of the four steel pipe columns of the steel pipe support on the short-distance side are fixed one by one to four pile foundations 201 located outside the shoulder on the other side of the expressway through a cushion beam 104; a sand bucket support 11 is arranged on the top of each steel pipe column 10, and a long-distance side pile top distribution beam 121, a mid-span pile top distribution beam 121 and a short-distance side pile top distribution beam 123 are erected one by one on the sand bucket supports 11 of the steel pipe support on the long-distance side, the mid-span steel pipe support and the steel pipe support on the short-distance side; The bottom formwork of the half-width portal beam on the large mileage side is set between the large mileage side pile top distribution beam 121 and the mid-span pile top distribution beam 122. The bottom formwork of the half-width portal beam on the large mileage side includes a plurality of large mileage H-shaped steel longitudinal beams, a transverse distribution beam 14, a longitudinal square wood 15 and a bottom formwork bamboo plywood 16 arranged from bottom to top; the bottom formwork of the half-width portal beam on the small mileage side is set between the mid-span pile top distribution beam 122 and the small mileage side pile top distribution beam 123. The bottom formwork of the half-width portal beam on the small mileage side includes a plurality of small mileage H-shaped steel longitudinal beams, a transverse distribution beam 14, a longitudinal square wood 15 and a bottom formwork bamboo plywood 16 arranged from bottom to top. Square wood 15 and bottom form bamboo plywood 16; multiple long-mileage section H-shaped steel longitudinal beams and multiple short-mileage section H-shaped steel longitudinal beams are staggered, with a staggered length of 0.5m, and the upper wing plates at the ends of the multiple long-mileage section H-shaped steel longitudinal beams and the upper wing plates in the middle of the span are respectively welded and connected by transverse channel steels 130 to form a long-mileage side half-width door opening longitudinal beam system 13A; the upper wing plates at the ends of the multiple short-mileage section H-shaped steel longitudinal beams and the upper wing plates in the middle of the span are also respectively welded and connected by transverse channel steels 130 to form a short-mileage side half-width door opening longitudinal beam system 13B;

[0038] The small mileage Bailey support includes six rows of steel pipe supports with pile numbers N6, N5, N4, N3, N2, and N1 and a small mileage beam bottom formwork. Each row of steel pipe supports is composed of four steel pipe columns 10, wherein the four steel pipe columns with pile number N6 are also fixed on four cushion beams 104 one by one, the bottoms of the four steel pipe columns with pile numbers N5, N4, N3, and N2 are fixed on four second pile foundations 202, four third pile foundations 203, four fourth pile foundations 204, and four fifth pile foundations 205 one by one, and the bottoms of the four steel pipe columns with pile number N1 are all fixed on the cap 200 of the small mileage bridge pier; A longitudinal connection system 110 is connected between the upper parts of the steel tube columns of NI and N2, between the upper parts of the steel tube columns of pile numbers N3 and N4, and between the upper parts of the steel tube columns of pile numbers N5 and N6; a sand bucket support 11 is arranged on the top of each steel tube column, and a pile top distribution beam 12 is respectively set on the sand bucket support 11 on the six rows of steel tube supports; the small mileage beam bottom formwork is set on the six pile top distribution beams 12, and the small mileage beam bottom formwork includes a plurality of small mileage Bailey longitudinal beams 132, a transverse distribution beam 14, a longitudinal square wood 15 and a bottom formwork bamboo plywood 16 arranged from bottom to top.

[0039] The sand bucket support 11 comprises a lower sand bucket 111 and an upper support 112 arranged on the lower sand bucket 11; the lower sand bucket 111 is filled with sand, and a plurality of sand outlet holes are evenly distributed on the lower bucket wall of the lower sand bucket 111, and a plugging bolt 113 is installed in each sand outlet hole.

[0040] See also Figures 5 to 11 The integral dismantling method of the cast-in-place beam support of the tied arch bridge across the expressway of the present invention is used to dismantle the traffic doorway support and includes the process of dismantling the half-width doorway support on the large mileage side and the process of dismantling the half-width doorway support on the small mileage side:

[0041] The process of removing the large mileage side half-width door opening bracket includes the following steps:

[0042] Step 1: First, close the highway of the half-width portal opening on the long-mileage side corresponding to the bottom formwork of the half-width portal opening beam on the long-mileage side, then simultaneously lower the sand bucket supports 11 located on the top of the two middle steel pipe columns of the steel pipe support on the long-mileage side and the sand bucket supports 11 located on the top of the two middle steel pipe columns of the steel pipe support in the middle of the span, and then simultaneously lower the sand bucket supports 11 located on the top of the two steel pipe columns on the left and right sides of the steel pipe support on the long-mileage side and the sand bucket supports 11 located on the top of the two steel pipe columns on the left and right sides of the steel pipe support in the middle of the span 1; When the sand bucket support 11 is lowered, the plugging bolt 113 of the sand outlet hole of the lower sand bucket 111 is first removed, and the sand in the lower sand bucket 111 is washed away by a high-pressure water gun, so that the upper support 112 sinks, and the bottom mold of the half-width doorway beam on the large mileage side is demoulded; immediately after demoulding, the lower sand bucket 111 and the upper support 112 of each sand bucket support 11 are welded into a whole with two channel steels 114, and the tops of the two channel steels 114 are higher than the top surface of the large mileage side pile top distribution beam 121 and the top surface of the mid-span pile top distribution beam 122 (see Figure 5 ), to prevent the large mileage side pile top distribution beam 121 and the mid-span pile top distribution beam 122 from overturning when the longitudinal beam is subsequently moved; then, the bottom mold bamboo plywood 16, longitudinal square wood 15 and transverse distribution beam 14 of the bottom mold of the large mileage side half-width portal beam are dragged out of the large mileage side half-width portal in the closed area of ​​the expressway in turn by using a truck crane, and then transferred to a safe area;

[0043] Step 2, install the suspension system 3 and four upper crossbeam anchoring mechanisms 4, the suspension system 3 includes two upper crossbeams 31, two lower crossbeams 32, four suspension rod mechanisms and four hydraulic jacks 30; the two upper crossbeams 31 are both arranged on the bridge deck and are located one-to-one at the pile positions of the steel pipe support on the large mileage side and the pile positions close to the mid-span steel pipe support; the two lower crossbeams 32 and the two upper crossbeams 31 are arranged one-to-one on the bottom surface of the half-width portal longitudinal beam system 13A on the large mileage side, and one of the lower crossbeams 32 uses the large mileage side pile top distribution beam 121; each suspension rod mechanism includes a finely rolled threaded steel bar 33, an upper cushion beam 34, an upper gasket 35, an upper nut 36, a lower cushion beam 37, a lower gasket 38 and a lower nut 39, and the φ32 finely rolled threaded steel bars 33 of the four suspension rod mechanisms are passed through the two ends of the two upper crossbeams 31 and the two lower crossbeams in a one-to-one correspondence. 32, the upper part of each fine-rolled threaded steel bar 33 is fastened by an upper pad beam 34, an upper gasket 35 and an upper nut 36, and the lower part of each fine-rolled threaded steel bar 33 is fastened by a lower pad beam 37, a lower gasket 38 and a lower nut 39; four hydraulic jacks 30 are installed one-to-one on the upper parts of the four fine-rolled threaded steel bars 33 and are located between the upper pad beam 34 and the upper gasket 35; four upper crossbeam anchoring mechanisms are arranged one-to-one between the middle parts of the two upper crossbeams 31 and the bridge deck, and each upper crossbeam anchoring mechanism 4 includes an upper pressure beam 41 arranged on the top surface of the upper crossbeam 31, a lower pressure beam 42 arranged on the bottom surface of the bridge deck, an anchor rod 43 passing through the upper pressure beam 41, the upper crossbeam, the bridge deck and the lower pressure beam 42, an upper anchor nut 44 fastened to the top of the anchor rod 43 and a lower anchor nut 45 fastened to the bottom of the anchor rod 43 (see Figure 6 and Figure 7 );

[0044] The upper crossbeam 31 and the lower crossbeam 32 are both made of double-jointed I-beams;

[0045] Since the working areas of the four fine-rolled threaded steel bars 33 and the four hydraulic jacks 30 are all outside the bridge deck, in order to ensure construction safety, a working platform 300 is set up at each of the positions where the four fine-rolled threaded steel bars 33 are installed on the two upper cross beams 31. The working platform 300 is built with a platform frame 301 using No. 10 channel steel, and bamboo plywood 302 is laid on the platform frame. Safety railings 303 are also set up on the periphery of the platform frame 301 (see Figure 8 );

[0046] First, two upper cross beams 31 and one lower cross beam 32 are hoisted to the corresponding positions by a crane, and then assembled on site. Then, a total of four long-mileage H-shaped steel longitudinal beams on the left and right sides of the long-mileage side half-width portal longitudinal beam system 13A are removed by a crane, and then an upper cushion beam 34 is respectively arranged on the top surface of the left and right side ends of the two upper cross beams 31, and a lower cushion beam 37 is respectively arranged on the bottom surface of the left and right side ends of the two lower cross beams 32, and a φ32 fine-rolled threaded steel bar 33 is inserted between each upper cushion beam 34, upper cross beam 31, lower cross beam 32 and corresponding lower cushion beam 37, and then the four fine-rolled threaded steel bars 33 are connected and fastened by upper gaskets 35, upper nuts 36, lower gaskets 38, and lower nuts 39, and finally four upper cross beam anchoring mechanisms are installed, so that the long-mileage side half-width portal longitudinal beam system is hung on the bridge deck of the long-mileage side half-width portal;

[0047] Step 3: First, use the four hydraulic jacks 30 in the suspension system 3 to lift the long-distance side half-width portal longitudinal beam system 13A by 15cm-25cm, then use gas cutting to cut off the transverse channel steel 130 on the long-distance side half-width portal longitudinal beam system 13A, and then use the chain hoist connected to the long-distance bridge pier 100 to pull out multiple long-distance section H-shaped steel longitudinal beams in groups of two by 1m in the long-distance direction at the same time, that is, pull out multiple long-distance section H-shaped steel longitudinal beams in groups of two from the mid-span pile top distribution beam 122, so that multiple long-distance section H-shaped steel longitudinal beams are separated from the short-distance side half-width portal longitudinal beam system 13B (see Fig. 9 ), forming a separate hanging system, and then re-welding and connecting the transverse channel steel 130 between the upper wing plates of the multiple long-mileage H-shaped steel longitudinal beams to form a long-mileage side half-width portal longitudinal beam system 13A; preventing overturning when the multiple long-mileage H-shaped steel longitudinal beams are lowered as a whole; before lowering the long-mileage side half-width portal longitudinal beam system 13A, a set of safety suspension rod mechanisms are respectively arranged on the outer sides of the four φ32 fine-rolled threaded steels 33 of the suspension system, and each set of safety suspension rod mechanisms includes a φ32 fine-rolled threaded steel 330, an upper cushion beam 340, an upper gasket 350, an upper nut 360, a lower cushion beam 370, a lower gasket 380 and a lower nut 390, so as to reinforce and connect the two upper cross beams 31 with the two lower cross beams 32;

[0048] Step 4: First, remove the large mileage side pile top distribution beam 121 fixed on the second expanded foundation 102 and the four steel pipe columns 10 supported by the large mileage side steel pipes in turn, and set a temporary steel support 50 on the road surface of the expressway near the third expanded foundation 103, and then use the four hydraulic jacks 30 of the suspension system 3 to lift and return the oil to slowly and steadily lower the lower cross beam 32 and the large mileage side half-width portal longitudinal beam system 13A above it in stages, and the maximum descent amount of each stage is controlled at about 18 cm, and the large mileage side half-width portal longitudinal beam system 13A is lowered to the temporary steel support 50 and the second expanded foundation 102 in the order of first high and then low in the longitudinal bridge direction (see Fig.10), and finally, the longitudinal beam system 13A of the half-width portal opening on the long-mileage side is hoisted to a safe area beside the expressway by a crane, and the expressway traffic of the half-width portal opening on the long-mileage side is restored;

[0049] The process of removing the large mileage side half-width door opening bracket includes the following steps:

[0050] Step 1: First, the highway of the small mileage side half-width portal opening corresponding to the small mileage side half-width portal opening beam bottom formwork is closed by borrowing, and then the sand bucket support 11 located on the top of the two steel pipe columns in the middle of the small mileage side steel pipe support is lowered at the same time, and then the sand bucket support 11 located on the top of the two steel pipe columns on the left and right sides of the small mileage side steel pipe support is lowered at the same time, so that the small mileage side half-width portal opening beam bottom formwork is demoulded; immediately after demoulding, the lower sand bucket 111 and the upper support 112 of each sand bucket support 11 are welded into a whole with two channel steels 114, and the top surfaces of the two channel steels 114 are higher than the top surfaces of the small mileage side pile top distribution beams 123; then, the bottom formwork bamboo plywood 16, the longitudinal square wood 15 and the transverse distribution beam 14 of the bottom formwork of the small mileage side half-width portal opening beam are dragged out of the small mileage side half-width portal opening in the closed area of ​​the highway in turn in the direction of the small mileage by using a car crane, and then transferred to a safe area;

[0051] Step 2: Install the suspension system 3 and four upper crossbeam anchoring mechanisms 4. The two upper crossbeams 31 of the suspension system 3 are both arranged on the bridge deck and correspond one-to-one to the piles of the steel pipe support in the middle of the span and the piles of the steel pipe support on the small mileage side. The two lower crossbeams 32 of the suspension system 3 and the two upper crossbeams 31 are arranged one-to-one to the bottom surface of the half-width portal longitudinal beam system 13B on the small mileage side. The half-width portal longitudinal beam system 13B on the small mileage side is suspended on the bridge deck of the half-width portal on the small mileage side.

[0052] Step 3: First, use the four hydraulic jacks 30 in the suspension system 3 to lift the half-width portal longitudinal beam system 13B on the small mileage side by 15cm to 25cm, then use gas cutting to cut off the transverse channel steel 130 on the half-width portal longitudinal beam system 13B on the small mileage side, and then use the chain hoist connected to the large mileage bridge pier to pull out multiple small mileage H-shaped steel longitudinal beams in groups of two at the same time in the large mileage direction, that is, pull out multiple small mileage H-shaped steel longitudinal beams in groups of two from the small mileage side pile top distribution beam 1 23, forming a separate hanging system, and then re-welding and connecting the transverse channel steel 130 between the upper wing plates of the multiple H-shaped steel longitudinal beams of the small mileage section to form a small mileage side half-width portal longitudinal beam system 13B; preventing the multiple H-shaped steel longitudinal beams of the small mileage section from overturning when being lowered as a whole; before lowering the small mileage side half-width portal longitudinal beam system 13B, a set of safety suspension rod mechanisms are respectively arranged on the outer sides of the four finely rolled threaded steel bars 33 of the suspension system, and the two upper cross beams 31 and the two lower cross beams 32 are connected as safety reinforcement;

[0053] Since the working areas of the four fine-rolled threaded steel bars 33 and the four hydraulic jacks 30 are all outside the bridge deck, in order to ensure construction safety, a working platform 300 is set up at each of the positions where the four fine-rolled threaded steel bars 33 are installed on the two upper cross beams 31. The working platform 300 is built with a platform frame 301 using No. 10 channel steel, and bamboo plywood 302 is laid on the platform frame. Safety railings 303 are also set up on the periphery of the platform frame 301 (see Figure 8 );

[0054] Step 4: First, dismantle the mid-span pile top crossbeam 122 fixed on the third expanded foundation 103 and the four steel pipe columns 10 supported by the mid-span steel pipe in turn, and set the temporary steel support 50 on the shoulder of the other side of the expressway, and then use the four hydraulic jacks 30 of the suspension system 3 to lift the oil back to slowly and steadily lower the lower crossbeam 32 and the small mileage side half-width portal longitudinal beam system 13B above it in stages, and the maximum descent amount of each stage is controlled at about 18 cm, and the small mileage side half-width portal longitudinal beam system 13B is lowered to the third expanded foundation 103 and the temporary steel support 50 in the order of first high and then low in the longitudinal bridge direction (see Fig.11 ), and finally use a crane to lift the small mileage side half-width portal longitudinal beam system 13B to a safe area beside the highway;

[0055] Step 5: Use blasting to break the third expansion foundation 103 and the second expansion foundation 102 to restore the two-way traffic on the expressway.

[0056] The above embodiments are only used to illustrate the present invention, rather than to limit the present invention. Those skilled in the relevant technical field may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.

Claims

1. A method for integrally dropping a cast-in-place beam support of a tied arch bridge across a highway, wherein the applicable cast-in-place beam support is arranged between a large-mileage bridge pier and a small-mileage bridge pier and comprises a large-mileage Bailey support located on one side of the highway, a traffic door support located on the highway, and a small-mileage Bailey support located on the other side of the highway; The traffic door opening support comprises a lower support, a bottom mold of a half-width door opening beam on the large mileage side, and a bottom mold of a half-width door opening beam on the small mileage side; wherein, The lower support comprises a row of large mileage side steel pipe supports, a row of mid-span steel pipe supports and a row of small mileage side steel pipe supports, each row of steel pipe supports is composed of four steel pipe columns; the bottoms of the four steel pipe columns of the large mileage side steel pipe supports are fixed on an expanded foundation located on one shoulder of the expressway, the bottoms of the four steel pipe columns of the mid-span steel pipe supports are fixed on an expanded foundation located on the central dividing strip of the expressway, and the bottoms of the four steel pipe columns of the small mileage side steel pipe supports are each fixed one by one through a cushion beam on four pile foundations located outside the shoulder on the other side of the expressway; a sand bucket support is provided on the top of each steel pipe column, and a large mileage side pile top distribution beam, a mid-span pile top distribution beam and a small mileage side pile top distribution beam are erected one by one on the sand bucket supports of the large mileage side steel pipe supports, the mid-span steel pipe supports and the small mileage side steel pipe supports; the bottom formwork of the half-width portal beam on the large mileage side is erected on the same level as the large mileage side Between the pile top distribution beam and the mid-span pile top distribution beam, the bottom formwork of the half-width portal beam on the large mileage side includes multiple H-shaped steel longitudinal beams of large mileage sections, transverse distribution beams, longitudinal square timbers and bottom formwork bamboo plywood arranged from bottom to top; the bottom formwork of the half-width portal beam on the small mileage side is set between the mid-span pile top distribution beam and the small mileage side pile top distribution beam, and the bottom formwork of the half-width portal beam on the small mileage side includes multiple H-shaped steel longitudinal beams of small mileage sections, transverse distribution beams, longitudinal square timbers and bottom formwork bamboo plywood arranged from bottom to top; multiple The H-shaped steel longitudinal beams of the long-distance section and the multiple H-shaped steel longitudinal beams of the short-distance section are arranged in a staggered manner, with a staggered length of 0.5m. The upper wing plates at the ends of the multiple H-shaped steel longitudinal beams of the long-distance section and the upper wing plates in the middle of the span are respectively welded and connected by transverse channel steels to form a half-width portal longitudinal beam system on the long-distance side; the upper wing plates at the ends of the multiple H-shaped steel longitudinal beams of the short-distance section and the upper wing plates in the middle of the span are respectively welded and connected by transverse channel steels to form a half-width portal longitudinal beam system on the short-distance side; The sand bucket support comprises a lower sand bucket and an upper support arranged on the lower sand bucket; the lower sand bucket is filled with sand, and a plurality of sand outlet holes are evenly distributed on the lower bucket wall of the lower sand bucket, and a plugging bolt is installed in each sand outlet hole; The overall dismounting method is used to dismantle the traffic door opening bracket and includes a process of dismantling the half-width door opening bracket on the large mileage side and a process of dismantling the half-width door opening bracket on the small mileage side: it is characterized in that: The process of removing the large mileage side half-width door opening bracket includes the following steps: Step 1: First, close the highway of the half-width portal opening on the long-mileage side corresponding to the bottom formwork of the half-width portal opening beam on the long-mileage side, then simultaneously lower the sand bucket supports on the top of the two middle steel pipe columns of the steel pipe support on the long-mileage side and the sand bucket supports on the top of the two middle steel pipe columns of the steel pipe support in the middle of the span, and then simultaneously lower the sand bucket supports on the top of the two steel pipe columns on the left and right sides of the steel pipe support on the long-mileage side and the sand bucket supports on the top of the two steel pipe columns on the left and right sides of the steel pipe support in the middle of the span; when lowering the sand bucket supports, first remove the blockage of the sand outlet hole of the lower sand bucket Bolts, use a high-pressure water gun to flush away the sand in the lower sand bucket, so that the upper support sinks and the bottom mold of the large mileage side half-width portal beam is demoulded; immediately after demoulding, the lower sand bucket and the upper support of each sand bucket support are welded into a whole with two channel steels, and the top surfaces of the two channel steels are higher than the top surfaces of the large mileage side pile top distribution beam and the top surfaces of the mid-span pile top distribution beam; then use a car crane in the closed area of ​​the highway to drag the bottom mold bamboo plywood, longitudinal square wood and transverse distribution beam of the bottom mold of the large mileage side half-width portal beam in the direction of the large mileage in turn out of the large mileage side half-width portal, and then transfer and hoist to a safe area; Step 2: Install the suspension system and four upper crossbeam anchoring mechanisms, the suspension system includes two upper crossbeams, two lower crossbeams, four hanger mechanisms and four hydraulic jacks; the two upper crossbeams are both arranged on the bridge deck and are located one-to-one at the pile positions of the steel pipe support on the large mileage side and the pile positions close to the mid-span steel pipe support; the two lower crossbeams and the two upper crossbeams are arranged one-to-one on the bottom surface of the half-width portal longitudinal beam system on the large mileage side, and the lower crossbeam located on the steel pipe support on the large mileage side utilizes the large mileage side pile top distribution beam; each hanger mechanism includes a precision-rolled threaded steel bar, an upper pad beam, an upper gasket, an upper nut, a lower pad beam, a lower gasket and a lower nut The fine-rolled threaded steel bars of the four suspension rod mechanisms are correspondingly arranged between the two ends of the two upper cross beams and the two ends of the two lower cross beams. The upper part of each fine-rolled threaded steel bar is fastened by an upper cushion beam, an upper gasket and an upper nut, and the lower part of each fine-rolled threaded steel bar is fastened by a lower cushion beam, a lower gasket and a lower nut; four hydraulic jacks are correspondingly installed on the upper part of the four fine-rolled threaded steel bars and are located between the upper cushion beam and the upper gasket; four upper cross beam anchoring mechanisms are correspondingly arranged between the middle part of the two upper cross beams and the bridge deck, and each upper cross beam anchoring mechanism includes an upper pressure beam, a lower pressure beam, an anchor rod, an upper anchor nut and a lower anchor nut; First install the suspension system, then install the four upper crossbeam anchoring mechanisms, so that the longitudinal beam system of the large mileage side half-width portal opening is suspended on the bridge deck of the large mileage side half-width portal opening; Step 3: First, use the four hydraulic jacks in the suspension system to lift the half-width portal longitudinal beam system on the long-mileage side by 20 cm, then use gas cutting to cut off the transverse channel steel on the half-width portal longitudinal beam system on the long-mileage side, and then use the chain hoist connected to the long-mileage bridge pier to pull out multiple long-mileage H-shaped steel longitudinal beams in groups of two in the long-mileage direction at the same time from the mid-span pile top distribution beam, so that the multiple long-mileage H-shaped steel longitudinal beams are separated from the half-width portal longitudinal beam system on the short-mileage side, and then re-weld the transverse channel steels between the upper wing plates of the multiple long-mileage H-shaped steel longitudinal beams to form the long-mileage side half-width portal longitudinal beam system; Step 4: first dismantle the four steel pipe columns supported by the large mileage side pile top distribution beam and the large mileage side steel pipe in turn, and set up a temporary steel support on the road surface of the expressway near the central dividing strip, and then use the four hydraulic jacks of the suspension system to slowly lower the lower crossbeam and the large mileage side half-width portal longitudinal beam system above it in stages, and lower the large mileage side half-width portal longitudinal beam system to the temporary steel support and the expanded foundation on one side of the expressway shoulder in the order of first high and then low in the longitudinal bridge direction, and finally use a crane to lift the large mileage side half-width portal longitudinal beam system to a safe area next to the expressway, and restore the expressway traffic of the large mileage side half-width portal; The process of removing the small mileage side half-width door opening bracket includes the following steps: Step 1: First, close the expressway of the small mileage side half-width portal opening corresponding to the small mileage side half-width portal opening beam bottom formwork, then simultaneously lower the sand bucket supports on the top of the two steel pipe columns in the middle of the small mileage side steel pipe support, and then simultaneously lower the sand bucket supports on the top of the two steel pipe columns on the left and right sides of the small mileage side steel pipe support, so that the small mileage side half-width portal opening beam bottom formwork is demoulded; immediately after demoulding, the lower sand bucket and the upper support of each sand bucket support are welded into a whole with two channel steels, and the top surfaces of the two channel steels are higher than the top surfaces of the small mileage side pile top distribution beams; then, use a car crane in the closed area of ​​the expressway to drag the bottom formwork bamboo plywood, longitudinal square wood and transverse distribution beam of the small mileage side half-width portal opening beam bottom formwork in the small mileage direction out of the small mileage side half-width portal opening, and then transfer and hoist it to a safe area; Step 2: Install the suspension system and four upper crossbeam anchoring mechanisms. The two upper crossbeams of the suspension system are both arranged on the bridge deck and are one-to-one close to the piles of the mid-span steel pipe support and the piles of the steel pipe support on the small mileage side. The two lower crossbeams and the two upper crossbeams of the suspension system are one-to-one correspondingly arranged on the bottom surface of the longitudinal beam system of the small mileage side half-width portal opening, so that the longitudinal beam system of the small mileage side half-width portal opening is suspended on the bridge deck of the small mileage side half-width portal opening. Step 3: First, use the four hydraulic jacks in the suspension system to lift the half-width portal longitudinal beam system on the short-mileage side by 20 cm, then use gas cutting to cut off the transverse channel steel on the half-width portal longitudinal beam system on the short-mileage side, and then use the chain hoist connected to the long-mileage bridge pier to pull out multiple H-shaped steel longitudinal beams of the short-mileage section in groups of two at the same time in the long-mileage direction from the top distribution beam of the pile on the short-mileage side, and then re-weld the transverse channel steels between the upper wing plates of multiple H-shaped steel longitudinal beams of the short-mileage section to form the half-width portal longitudinal beam system on the short-mileage side; Step 4: First, dismantle the mid-span pile top distribution beam and the four steel pipe columns supported by the mid-span steel pipe in sequence, and set up a temporary steel support on the shoulder on the other side of the expressway. Then, use the four hydraulic jacks of the suspension system to slowly lower the lower crossbeam and the half-width portal longitudinal beam system on the small mileage side above it in stages, and lower the half-width portal longitudinal beam system on the small mileage side in the order of first high and then low in the longitudinal direction of the bridge to the expanded foundation and temporary steel support located on the central dividing strip. Finally, use a crane to lift the half-width portal longitudinal beam system on the small mileage side to a safe area beside the expressway. Step five is to remove the expanded foundation located on the central dividing strip of the expressway and the expanded foundation located on one side shoulder of the expressway to restore two-way traffic on the expressway.

2. The method for integrally dropping a cast-in-place beam support of a tied arch bridge across a highway according to claim 1, characterized in that: When carrying out step two of the process of dismantling the half-width door opening bracket on the long mileage side and step two of the process of dismantling the half-width door opening bracket on the short mileage side, a working platform is set up at the position where the fine-rolled threaded steel bars are installed on the two upper cross beams. The platform frame of the working platform is built with channel steel, and bamboo plywood is laid on the platform frame. Safety railings are also set up on the outside of the platform frame.

3. The method for integrally dropping a cast-in-place beam support of a tied arch bridge across a highway according to claim 1, characterized in that: When performing step three of the process of removing the half-width door opening bracket on the long mileage side and step three of the process of removing the half-width door opening bracket on the short mileage side, a set of safety hanger mechanisms are respectively arranged on the outside of the four fine-rolled threaded steel bars of the suspension system to reinforce the connection between the two upper beams and the two lower beams.