Coal, gas and heat coordinated mining system
Through the coordinated mining system of coal, gas and heat, the hydraulic coal-breaking and gas lifting reverse circulation technology is used to achieve the synchronous recovery of coal, gas and geothermal resources, solving the problems of waste of resources and high development costs in coal mining, and improving mining efficiency and resource utilization.
Patent Information
- Application Number
- CN202410249162.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-03-05
AI Technical Summary
With the increasing depth of coal mining, problems such as high temperature heat damage underground and coal and gas outbursts are serious. It is difficult for the existing technology to achieve synchronous recycling of coal and its associated resources, and there are problems of waste of resources and high development costs.
A coal, gas and heat coordinated co-machining system is proposed, including a gas mining unit, a coal water geothermal lifting unit and a gas heat utilization unit, which is supplied by the ground fracturing fluid, a directional drill rod, a jet tool string, an air compressor, and a gas faucet. , gas lift reverse circulation double-wall drilling rod and other components to realize hydraulic coal breaking, gas lift reverse circulation coal pumping, and use plate heat exchangers and heat pump units for thermal energy recycling.
The synchronous recycling and utilization of coal, gas and geothermal resources has been achieved, the mining costs have been reduced, the contradiction between high resource development costs and the time and space replacement of gas extraction and coal mining has been solved, the single well output has been increased, and resource waste has been reduced.
Smart Images

Figure CN118309400B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of coal mining, and in particular to a system for coordinated mining of coal, gas and heat. Background Art
[0002] As the depth of coal mining increases, problems such as underground high temperature heat damage, coal and gas outbursts are becoming more and more serious. The geothermal resources in my country's coal-rich areas account for more than 50% of the country's total. The total amount of gas directly emitted into the air during coal mining is about 1.32×10 9 m 3 , there is a serious problem of waste of coal-associated resources. Therefore, there is an urgent need for a new mining technology and system equipment with good adaptability, low cost and the ability to achieve simultaneous recovery of coal and its associated resources. Summary of the invention
[0003] In view of this, the purpose of this application is to propose a coordinated coal, gas and heat mining system to solve or partially solve the above problems.
[0004] The system comprises: a coal gas extraction unit, a coal-water geothermal lifting unit, and a gas-heat utilization unit;
[0005] The coal gas extraction unit comprises a ground fracturing fluid supply assembly, a directional drill rod, and a jet tool string; the ground fracturing fluid supply assembly is connected to the directional drill rod through a high-pressure pipeline, and the jet tool string is arranged on the side of the coal seam into which the directional drill rod penetrates; the ground fracturing fluid supply assembly supplies fracturing fluid to the directional drill rod through the high-pressure pipeline in a coal-breaking working state; the fracturing fluid passes through the directional drill rod and is sprayed by the jet tool string to the coal seam for jet cutting of coal;
[0006] The coal-water geothermal lifting unit comprises an air compressor, an air-water tap, and an air-lift reverse circulation double-wall drill pipe; the air compressor is connected to the air-lift reverse circulation double-wall drill pipe through the air-water tap and a high-pressure pipeline; one end of the air-lift reverse circulation double-wall drill pipe laid in the coal seam is provided with a reverse circulation roller drill bit; the air compressor injects compressed air into the air-lift reverse circulation double-wall drill pipe through the air-water tap, so that the coal slag, waste fracturing fluid and overflow gas obtained after jet cutting of coal are mixed to form a mixture, and the mixture is collected by the reverse circulation roller drill bit and the air-lift reverse circulation double-wall drill pipe into a coal-water-gas separator;
[0007] The gas heat utilization unit includes a coal-water-gas separator, an insulated steel pipe, a steel pipe, a plate heat exchanger, a heat pump unit, a terminal heat facility, and a clean water tank; the coal-water-gas separator is connected to the plate heat exchanger through an insulated steel pipe, the plate heat exchanger is connected to the clean water tank through the steel pipe, and the heat pump unit is connected to the terminal heat facility through the insulated steel pipe; the coal-water-gas separator separates the mixture to obtain a circulating liquid, and the circulating liquid is injected into the plate heat exchanger through the insulated steel pipe to perform a first cycle of energy extraction, and the plate heat exchanger transmits the heat energy obtained from the first cycle of energy extraction to the heat pump unit to perform a second cycle of energy extraction, and the heat pump unit transmits the heat energy obtained from the second cycle of energy extraction to the terminal heat facility to release heat energy.
[0008] Optionally, the surface fracturing fluid supply assembly includes a fracturing truck, a mixing truck, an instrument truck, and a clean water tank;
[0009] The clean water in the clean water tank is processed by the mixing vehicle to obtain the fracturing fluid, and the fracturing fluid is supplied to the fracturing vehicle by the instrument vehicle.
[0010] Optionally, the high-pressure pipeline is connected to the ground fracturing fluid supply assembly by a hook connection, and the high-pressure pipeline is connected to the directional drill rod by a locking connection.
[0011] Optionally, the coal-breaking drill hole of the coal gas extraction unit is divided into a vertical section, a curved section, and a horizontal section. The vertical section is from the ground to the top of the coal seam and is at a preset distance from the top of the coal seam; the horizontal section is set in the coal seam; and the curved section is from the end point of the vertical section to the starting point of the horizontal section.
[0012] Optionally, the air compressor is connected to the gas lift reverse circulation double-wall drill pipe through the air and water tap and the high-pressure pipeline; the connection between the high-pressure pipeline and the air and water tap is a locking connection, and the high-pressure pipeline and the air compressor are connected by a hook.
[0013] Optionally, the coal-water-gas separator, the plate heat exchanger and the insulated steel pipe are connected by hook connection; the plate heat exchanger and the clean water tank are connected by hook connection.
[0014] Optionally, the gas heat utilization unit further comprises a boiler room, and the coal-water-gas separator comprises at least a gas outlet, a water outlet, and a coal outlet;
[0015] The water outlet is connected to the plate heat exchanger;
[0016] The gas outlet is connected to the boiler room via a high-pressure pipeline, and the connection method is a locking connection;
[0017] The coal outlet is used for discharging coal.
[0018] Optionally, the heat pump unit includes a condenser and an evaporator;
[0019] The evaporator is used to absorb heat from the plate heat exchanger;
[0020] The condenser is used to release heat to the heat-using facility cycle.
[0021] Optionally, the gas outlet is connected to the boiler room through the high-pressure pipeline, and the boiler room burns gas to generate electricity and supply the heat pump unit; the heat pump unit performs a second cycle to extract energy, and extracts geothermal energy from the circulating fluid to supply heat facilities; after the first cycle of energy extraction, the circulating fluid is filled with clean water and injected into the gas extraction unit to participate in resource extraction.
[0022] Optionally, after the coal gas resource is mined, the coal-water geothermal lifting unit and the gas-heat utilization unit are retained; the circulating fluid is directly injected into the mining well after the first cycle to extract energy, so as to continue to extract geothermal energy from the formation.
[0023] As can be seen from the above, the present application provides a coordinated coal, gas and heat mining system, including: a coal gas mining unit, a coal-water geothermal lifting unit, and a gas-heat utilization unit; the coal gas mining unit includes a ground fracturing fluid supply assembly, a directional drill pipe, and a jet tool string; the ground fracturing fluid supply assembly is connected to the directional drill pipe through a high-pressure pipeline, and the jet tool string is arranged on the side of the coal seam into which the directional drill pipe penetrates; the ground fracturing fluid supply assembly supplies fracturing fluid to the directional drill pipe through the high-pressure pipeline in the coal-breaking working state; the fracturing fluid passes through the directional drill pipe and is sprayed into the coal seam by the jet tool string for jet cutting of coal; the coal-water geothermal lifting unit includes an air compressor, an air-water tap, and an air-lift reverse circulation double-wall drill pipe; the air compressor is connected to the air-lift reverse circulation double-wall drill pipe through the air-water tap and a high-pressure pipeline; the air-lift reverse circulation double-wall drill pipe is laid on one end of the coal seam and is provided with a reverse circulation roller drill bit; the air compressor injects compressed air into the gas-lift through the air-water tap The reverse circulation double-wall drill pipe is used to mix the coal slag, waste fracturing fluid and overflow gas obtained after jet cutting of coal to form a mixture, and the mixture is collected by the reverse circulation cone drill bit and the gas lift reverse circulation double-wall drill pipe into the coal-water-gas separator; the gas-heat utilization unit includes a coal-water-gas separator, an insulated steel pipe, a steel pipe, a plate heat exchanger, a heat pump unit, a terminal heat facility, and a clean water tank; the coal-water-gas separator is connected to the plate heat exchanger through an insulated steel pipe, and the plate heat exchanger is connected to the clean water tank through a The heat pump unit and the terminal heat facility are connected through the insulated steel pipe; the coal-water-gas separator separates the mixture to obtain a circulating liquid, and the circulating liquid is injected into the plate heat exchanger through the insulated steel pipe to perform a first cycle of energy extraction. The plate heat exchanger transfers the heat energy obtained from the first cycle of energy extraction to the heat pump unit to perform a second cycle of energy extraction. The heat pump unit transfers the heat energy obtained from the second cycle of energy extraction to the terminal heat facility to release heat energy. This application realizes the recycling of drilling fluid through hydraulic coal breaking and gas lift reverse circulation coal extraction, reduces mining costs, and can effectively recycle geothermal resources, coalbed methane resources and coal simultaneously, solving the high investment cost of single targeted development of conventional coal-related associated resources, the difficulty of coordinated development technology, and the prominent contradiction between gas extraction and coal mining in time and space. Combined with the endowment characteristics of coal gas thermal resources, through innovative mining technology models and design, development and configuration of system equipment, the coal gas geothermal resources are packaged and integrated for development, reducing resource development costs, realizing a new model of integrated development and utilization of traditional energy and non-fossil energy, and promoting the innovation of mining technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only for the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0025] Figure 1 A schematic diagram of the combined application of a coal gas extraction unit and a coal-water geothermal lifting unit provided in an embodiment of the present application;
[0026] Figure 2 A schematic diagram of the combined application of a coal gas extraction unit and a gas heat utilization unit provided in an embodiment of the present application;
[0027] Figure 3 A schematic diagram of the structure of a coordinated coal, gas and heat mining system provided in an embodiment of the present application.
[0028] In the figure: fracturing truck 1, mixing truck 2, liquid tank truck 3, instrument truck, clean water tank 5, coal-water-gas separator 17, high-pressure pipeline 7, directional drill pipe 8, directional short joint 9, jet tool string 10, air compressor 11, gas-water tap 12, reverse circulation double-wall drill pipe 13, gas-liquid mixer 14, single-wall drill pipe 15, reverse circulation roller drill bit 16, coal-water-gas separator 17, plate heat exchanger 18, heat pump unit 19, and insulated steel pipe 20. DETAILED DESCRIPTION
[0029] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.
[0030] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The "first", "second" and similar words used in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0031] As described in the background technology section, the related technology includes excavating a fluidized coal transport tunnel in the rock layer below the coal seam, using a high-pressure jet to perform hydraulic fluidization mining operations on the coal seam, and using a pumping method to transport the coal body to the ground through the fluidized transport tunnel for coal-water separation. However, in this technical solution, the system needs to excavate a fluidized transport tunnel specifically, which is costly, and the coal cutting direction is longitudinal, which is difficult to apply in thin coal seams and structural coal conditions. In addition, the installation of equipment and tunnel excavation all require underground operations, which are less safe. The related technology also uses air ducts to compress air into the coal conveying pipe to form a three-phase flow of gas, liquid, and solid, and uses the density difference and speed difference between air and liquid coal-water mixture and the hydrophilic effect of bubbles to lift the coal-water mixture to the surface. However, the above method has a low lifting efficiency, a large amount of coal lost at the working face, and a low single well output. In addition, it is necessary to design and construct a coal outlet pipe, which is labor-intensive and economically poor. There is also the problem that the coal cutting direction is longitudinal and it is difficult to apply in thin coal seams and structural coal.
[0032] In the process of realizing this application, the applicant found that the existing hydraulic coal mining technology generally has problems such as the need for underground operations, complex equipment and processes, and high construction costs. In particular, the existing methods are difficult to match thin coal seams and structural coal.
[0033] The technical solution of the present application is further described in detail below through specific embodiments.
[0034] refer to Figure 1 , which is a schematic diagram of the combined application of a coal gas extraction unit and a coal-water geothermal lifting unit provided in an embodiment of the present application.
[0035] The coal gas extraction unit includes a ground fracturing fluid supply assembly, a directional drill rod 8, and a jet tool string 10; the ground fracturing fluid supply assembly is connected to the directional drill rod 8 through a high-pressure pipeline 7, and the jet tool string 10 is arranged on the side of the coal seam into which the directional drill rod 8 penetrates; the ground fracturing fluid supply assembly supplies fracturing fluid to the directional drill rod 8 through the high-pressure pipeline 7 in the coal breaking working state; the fracturing fluid passes through the directional drill rod 8 and is sprayed into the coal seam by the jet tool string 10 to perform jet cutting of coal.
[0036] As an optional embodiment, the ground fracturing fluid supply assembly includes a fracturing truck 1, a mixing truck 2, an instrument truck 4, and a clean water tank 5. During operation, clean water in the clean water tank 5 is processed by the mixing truck 2 to obtain fracturing fluid, and the fracturing fluid is supplied to the fracturing truck 1 by the instrument truck 4.
[0037] Coal gas extraction is a complex process that involves the synergy of multiple components and technologies. The surface fracturing fluid supply component is primarily responsible for generating and delivering fracturing fluid, a special liquid used to increase the permeability of coal seams during coal gas extraction. The surface fracturing fluid supply component mixes and prepares the fracturing fluid using specific equipment and technology. These components are carefully selected and formulated to ensure that the fracturing fluid can produce an effective fracturing effect in the coal seams.
[0038] Directional drill pipe 8 is one of the key equipment in coal gas mining. It is responsible for introducing fracturing fluid and other necessary tools into the coal seam. Directional drill pipe 8 has a high degree of directionality and accuracy and can accurately penetrate into the predetermined coal seam position. At the front end of the drill pipe, special cutting and coal breaking tools are usually equipped to form the required channels or cracks in the coal seam.
[0039] The jet tool string 10 is a set of tools installed at the front end of the directional drill pipe 8, which is mainly responsible for releasing the fracturing fluid into the coal seam in the form of high-pressure jets, thereby achieving the effect of jet cutting coal. The jet tool string 10 uses the impact force of high-pressure liquid to efficiently cut and crush the coal seam. When the fracturing fluid passes through the jet tool string 10, its speed and pressure are greatly improved, thereby achieving fast and accurate cutting of the coal seam.
[0040] During the coal gas extraction process, these components work together. The fracturing fluid generated by the ground fracturing fluid supply component is transported to the directional drill pipe 8 through the high-pressure pipeline 7. Under the guidance of the directional drill pipe 8, the fracturing fluid accurately flows into the coal seam. When the fracturing fluid reaches the jet tool string 10, it is released into the coal seam in the form of high-pressure injection to cut and crush the coal seam. In this way, the coal gas extraction unit can effectively fracture and cut the coal seam, improving the extraction efficiency and output of coal gas. At the same time, this extraction method is also highly flexible and accurate, and can be adjusted and optimized according to specific geological conditions and extraction needs.
[0041] As an optional embodiment, the high-pressure pipeline 7 is connected to the ground fracturing fluid supply assembly by a hook connection, and the high-pressure pipeline 7 is connected to the directional drill rod 8 by a locking connection.
[0042] In the coal gas extraction unit, the connection method of the high-pressure pipeline 7 with other components is crucial to ensure the safety and efficiency of the extraction process. The hook connection is a fast and reliable connection method for tightly connecting the high-pressure pipeline 7 with the ground fracturing fluid supply assembly. The hook connection usually uses a special hook joint and a matching locking device. A special hook-shaped structure is designed on the joint, which can be matched with the corresponding interface on the ground fracturing fluid supply assembly. When the high-pressure pipeline 7 is docked with the ground fracturing fluid supply assembly, the hook joint and the interface are tightly locked by the locking device to ensure that the connection will not leak or fall off. The hook connection has the characteristics of simple structure, easy operation, and firm connection. It can complete the connection in a short time, and can maintain stable performance under high-pressure and high-flow working conditions, ensuring that the fracturing fluid can be smoothly transported to the directional drill pipe 8. The locking connection is a more stable connection method, which is used to tightly connect the high-pressure pipeline 7 with the directional drill pipe 8 to withstand greater pressure and torque. The locking connection usually uses threaded connection or flange connection. In the threaded connection, the end of the high-pressure pipeline 7 is designed with an internal thread, and the directional drill rod 8 is equipped with a corresponding external thread. When the two are butted, the threads are tightly combined by rotation to form a firm connection. In the flange connection, both the high-pressure pipeline 7 and the directional drill rod 8 are equipped with flanges, and the two flanges are tightly fixed together by bolts. The locking connection has the characteristics of high connection strength, good sealing, and strong vibration resistance. It can maintain stable connection performance in harsh working environments, ensuring that the connection between the high-pressure pipeline 7 and the directional drill rod 8 will not loosen or leak due to factors such as vibration and pressure changes.
[0043] The hook connection and the locking connection each play an important role in the coal gas extraction unit. The hook connection ensures a fast and reliable connection between the high-pressure pipeline 7 and the ground fracturing fluid supply assembly, while the locking connection ensures a high-strength and high-tightness connection between the high-pressure pipeline 7 and the directional drill pipe 8. The combined use of these two connection methods ensures the safe and efficient operation of the coal gas extraction process.
[0044] In specific implementation, during drilling and cementing:
[0045] As an optional embodiment, the mining process can be divided into two stages, namely, first opening, second opening and third opening, wherein:
[0046] First opening (vertical drilling section): Use a Ф444.5mm drill bit to drill 1 to 10 meters below the bedrock and stop drilling. Put in a Ф339.7mm steel pipe for cementing. It should be noted that the first opening depth depends on the degree of formation fragmentation. The more fragmented the formation, the deeper the drilling.
[0047] Second opening (inclined section): Use a Φ311.1mm drill bit to drill to the top of the coal seam and insert a Φ244.5mm steel pipe for cementing.
[0048] Three openings (horizontal drilling section): Use a Φ215.9mm drill bit to drill to the end hole position of the coal seam section. Depending on the strength of the coal seam, you can choose to complete the well with an open hole or run a Φ139.7mm fiberglass casing.
[0049] As an optional embodiment, the coal-breaking drill hole of the coal gas extraction unit is divided into a vertical section, a curved section, and a horizontal section. The vertical section is from the ground to the top of the coal seam, and is at a preset distance from the top of the coal seam; the horizontal section is set in the coal seam; and the curved section is from the end point of the vertical section to the starting point of the horizontal section.
[0050] In the coal gas mining unit, the design of the coal breaking borehole is crucial, which directly affects the mining efficiency and the output of coal gas. The coal breaking borehole is usually divided into vertical section, curved section and horizontal section, each of which has its specific function and position. The straight section starts from the ground and extends all the way to the top of the coal seam, maintaining a certain preset distance from the top of the coal seam. The main function of the vertical section is to penetrate the rock layer covering the coal seam and provide a channel for the subsequent curved section and horizontal section. This section of the borehole needs to pass through different geological layers, so the drill bit and drilling rig need to have sufficient strength and precision to cope with the challenges under different geological conditions. During the drilling process of the vertical section, various geological obstacles may be encountered, such as hard rock formations, groundwater, etc. Therefore, it is necessary to select the appropriate drill bit and drilling technology to ensure the smooth progress of the drilling. The curved section is located between the end of the vertical section and the start of the horizontal section, and it is responsible for turning the direction of the borehole from vertical to horizontal. The curved section is designed to adapt to the changes in the strata and the mining needs. By changing the direction of the borehole, the best position of the borehole in the coal seam can be ensured, thereby achieving maximum coal gas mining efficiency. The drilling technology of the curved section is more complicated and requires precise guidance and control. The drill bit and drilling rig need to have high flexibility and stability to ensure that the borehole can smoothly transition to the horizontal section. The horizontal section is located in the coal seam and is the main part of the coal-breaking drilling hole. The main function of the horizontal section is to mine in the coal seam. Since the coal seam is usually horizontal or nearly horizontal, the drilling of the horizontal section can cover the coal seam to the greatest extent and improve the efficiency of coal gas extraction. During the drilling process of the horizontal section, special attention should be paid to maintaining the stability and continuity of the borehole. In addition, since the geological characteristics of the coal seam may be more complex, such as the presence of faults, folds, etc., it is necessary to select appropriate drilling technology and equipment to meet these challenges.
[0051] In the specific implementation, after the well is completed, the jet tool is used to break the coal in blocks (every 5 meters). The mechanism of jet breaking coal and rock is:
[0052] First, the impact pressure produces initial cracks in the coal seam, and further cracks are formed in the coal seam under the combined action of tensile stress and shear stress. Unloading causes tensile damage to the coal rock. The synergistic effect of the water jet causes the cracks to converge and penetrate to form fragments. The propagation of stress waves increases the damage range of the coal rock. Finally, the jet moves to form a macroscopic cut.
[0053] In this application, the coal mining path can be summarized as follows: coal exists in the coal seam, the jet tool string 10 breaks the coal body, the coal is mixed with the drilling fluid to form a mixed liquid, the coal-water geothermal lifting unit provides power to move to the ground, the ground coal-water-gas separator 17 separates the coal, and coal-using facilities are used.
[0054] refer to Figure 2 , which is a schematic diagram of the application of the coal-water geothermal lifting unit provided in an embodiment of the present application.
[0055] The coal-water geothermal lifting unit includes an air compressor 11, an air-water tap 12, and an air-lift reverse circulation double-wall drill pipe 13; the air compressor 11 is connected to the air-lift reverse circulation double-wall drill pipe 13 through the air-water tap 12 and the high-pressure pipeline 7; the air-lift reverse circulation double-wall drill pipe 13 is laid on one end of the coal seam and is provided with a reverse circulation roller drill bit 16; the air compressor 11 injects compressed air into the air-lift reverse circulation double-wall drill pipe 13 through the air-water tap 12, so that the coal slag obtained after jet cutting of coal, the waste fracturing fluid and the overflow gas are mixed to form a mixture, and the mixture is collected into the coal-water-gas separator 17 through the reverse circulation roller drill bit 16 and the air-lift reverse circulation double-wall drill pipe 13.
[0056] The coal-water geothermal lifting unit is an important component in coal gas mining, mainly used to treat coal slag, waste fracturing fluid and spilled gas generated during the mining process. The key components of this unit include air compressor 11, air-water tap 12 and air lift reverse circulation double-wall drill pipe 13, which work together to achieve effective treatment of the mining products.
[0057] In the specific implementation, the air compressor 11 is the power source of the coal-water geothermal lifting unit and is responsible for providing compressed air. The air compressor 11 compresses the air in the atmosphere into high-pressure gas through an internal mechanism, providing power for the subsequent lifting of coal slag, waste fracturing fluid and spilled gas. The gas-water tap 12 is a key component connecting the air compressor 11 and the gas-lift reverse circulation double-wall drill pipe 13, and plays the role of transferring and regulating compressed air. The gas-water tap 12 receives compressed air from the air compressor 11 and transports it to the gas-lift reverse circulation double-wall drill pipe 13 through the high-pressure pipeline 7. At the same time, the gas-water tap 12 also has the function of regulating and controlling the flow of compressed air to ensure the stable operation of the system. The gas-lift reverse circulation double-wall drill pipe 13 is the core component of the coal-water geothermal lifting unit, responsible for lifting the mixture of coal slag, waste fracturing fluid and spilled gas from the coal seam to the ground. The gas-lift reverse circulation double-wall drill pipe 13 is designed with a special channel inside, so that the compressed air can flow along the inner wall of the drill pipe, and the mixture is carried to the ground through the annular space between the outer wall and the inner wall of the drill pipe. This reverse circulation design can effectively prevent the mixture from clogging and accumulation during the lifting process.
[0058] As an optional embodiment, the high-pressure pipeline 7 is connected to the gas and water tap 12 by a locking connection, and the high-pressure pipeline 7 is connected to the air compressor 11 by a hook connection.
[0059] As an optional embodiment, the connection mode of the coal-water-gas separator 17, the plate heat exchanger 18 and the insulated steel pipe 20 is a hook connection; the connection mode of the plate heat exchanger 18 and the clean water tank 5 is a hook connection.
[0060] When in operation, the air compressor 11 injects compressed air into the gas lift reverse circulation double-wall drill pipe 13 through the air-water tap 12, so that the coal slag, waste fracturing fluid and overflow gas obtained after jet cutting in the coal seam are mixed to form a mixture, and the mixture is collected into the coal-water-gas separator 17 through the reverse circulation roller drill bit 16 and the gas lift reverse circulation double-wall drill pipe 13.
[0061] Specifically, during the gas lift reverse circulation lifting process, compressed air is passed through the air compressor 11 through the air-water tap 12 or the air box, through the gas lift reverse circulation double-wall drill pipe 13, and the annular gap between the inner tube and the outer tube of the gas lift reverse circulation double-wall drill pipe 13 is sprayed into the inner tube from the gas-liquid mixer 14, forming countless small bubbles, which rise rapidly along the inner tube while expanding at the same time. As the compressed air continuously enters the well fluid, a low-specific-gravity gas-water mixture is formed on the upper part of the gas-liquid mixer 14, while the liquid in the well has a high specific gravity. According to the communicating vessel principle, the gas-water mixture in the inner tube flows upward under the action of the pressure difference, and the coal and gas at the bottom of the hole are continuously brought to the surface through the reverse circulation roller drill bit 16 and the gas lift reverse circulation double-wall drill pipe 13.
[0062] In this application, the coalbed methane extraction path can be summarized as follows: coalbed methane exists in the pores of the coal seam, the coal gas extraction unit breaks the coal body, the coalbed methane stored in the coal seam escapes to the working face, the coalbed methane mixes with the drilling fluid to form a mixed liquid, the coal-water geothermal lifting unit provides power to move to the ground, the ground coal-water-gas separator 17 separates the coal, and the coal-using facilities.
[0063] refer to Figure 3 , which is a schematic diagram of the structure of the coordinated coal, gas and heat mining system provided in an embodiment of the present application.
[0064] The gas heat utilization unit includes a coal-water-gas separator 17, an insulated steel pipe 20, a steel pipe, a plate heat exchanger 18, a heat pump unit 19, a terminal heat facility, and a clean water tank 5; the coal-water-gas separator 17 is connected to the plate heat exchanger 18 through the insulated steel pipe 20, the plate heat exchanger 18 is connected to the clean water tank 5 through the steel pipe, and the heat pump unit 19 is connected to the terminal heat facility through the insulated steel pipe 20; the coal-water-gas separator 17 separates the mixture to obtain a circulating liquid, and the circulating liquid is injected into the plate heat exchanger 18 through the insulated steel pipe 20 to perform a first cycle of energy extraction, the plate heat exchanger 18 transmits the heat energy obtained from the first cycle of energy extraction to the heat pump unit 19 to perform a second cycle of energy extraction, and the heat pump unit 19 transmits the heat energy obtained from the second cycle of energy extraction to the terminal heat facility to release heat energy.
[0065] In the specific implementation, the gas heat utilization unit is an important link in the process of coal gas mining and processing. It is responsible for extracting and utilizing the heat energy in the circulating liquid separated in the coal-water-gas separator 17. This unit is connected through a series of equipment and pipelines to realize the transfer and utilization of heat energy, and provide the required heat energy for the terminal heat facilities. The coal-water-gas separator 17 is the starting point of the gas heat utilization unit, which is responsible for separating the mixture collected in the coal-water geothermal lifting unit to obtain the circulating liquid. The coal-water-gas separator 17 uses physical or chemical methods to effectively separate the coal slag, waste fracturing fluid and overflow gas in the mixture to extract clean circulating liquid. The insulated steel pipe 20 and the steel pipe are used to connect the coal-water-gas separator 17 with the plate heat exchanger 18 and the clean water tank 5 to form a channel for heat energy transmission. The inside of the insulated steel pipe 20 is filled with insulation material to reduce the loss of heat energy during the transmission process. The steel pipe is used to connect the plate heat exchanger 18 and the clean water tank 5 to realize the flow of the circulating liquid. The plate heat exchanger 18 is one of the key equipment in the gas heat utilization unit, responsible for the first cycle energy extraction and transferring the heat energy in the circulating fluid to the heat pump unit 19. The plate heat exchanger 18 exchanges heat between the plates to allow the circulating fluid to exchange heat with the working medium in the heat pump unit 19, thereby transferring the heat energy in the circulating fluid to the working medium. The heat pump unit 19 is another key equipment in the gas heat utilization unit, responsible for the second cycle energy extraction and transferring the heat energy to the terminal heat facility. The heat pump unit 19 uses the reverse Carnot cycle principle to absorb heat energy from a low-temperature heat source (such as a circulating fluid), and then raises the heat energy to a higher temperature through the action of components such as a compressor and a condenser, and transfers it to the terminal heat facility. The terminal heat facility is the end point of the gas heat utilization unit, responsible for receiving the heat energy transferred by the heat pump unit 19 and releasing the heat energy to meet the needs of production or life. The terminal heat facility can be a heating system, a hot water system or other equipment that requires heat energy. When the heat pump unit 19 transmits heat energy to the terminal heat facilities, these facilities will convert it into the required form, such as hot air in the heating system or hot water in the hot water system. The clean water tank 5 is used to store clean water treated by the plate heat exchanger 18 for subsequent use. The clean water tank 5 is connected to the plate heat exchanger 18 through a steel pipe, receives clean water after heat exchange, and maintains a certain water level and pressure to meet the needs of the system. The gas heat utilization unit realizes the entire process of separating the circulating liquid from the mixture, extracting and utilizing the heat energy in the circulating liquid, transferring the heat energy to the terminal heat facilities and releasing the heat energy through the coordinated work of equipment and components such as the coal-water gas separator 17, the insulated steel pipe 20, the steel pipe, the plate heat exchanger 18, the heat pump unit 19, the terminal heat facilities and the clean water tank 5. This not only improves the efficiency of energy utilization, but also helps to reduce environmental pollution and save energy costs.
[0066] As an optional embodiment, the water outlet is connected to the gas heat utilization unit; the gas outlet is connected to the high-pressure pipeline 7 in a locking connection; and the coal outlet is used for discharging coal.
[0067] As an optional embodiment, the evaporator is used to absorb the heat from the plate heat exchanger 18; and the condenser is used to release the heat to the heat-using facility cycle.
[0068] As an optional embodiment, the gas outlet is connected to the boiler room through the high-pressure pipeline 7, and the boiler room burns the gas to generate electricity and supply the heat pump unit 19; the gas heat utilization unit extracts energy through the second cycle, extracts the geothermal energy in the circulating fluid and supplies it to the heat facilities; after the circulating fluid extracts energy through the first cycle, it is filled with clean water and injected into the gas extraction unit to participate in the extraction of resources.
[0069] As an optional embodiment, after the gas resource is mined, the coal-water geothermal lifting unit and the gas-heat utilization unit are retained; the circulating fluid is directly injected into the mining well after the first cycle to extract energy, so as to continue to extract geothermal energy from the formation.
[0070] In the specific implementation, the coal-water-gas mixture overflowing from the wellhead and the coal-water-gas mixture extracted by gas lift reverse circulation are separated into coal, water and gas by the first coal-water-gas separator 17 built on the ground. A portion of heat is extracted through the insulated steel pipe 20, the plate heat exchanger 18 and the heat pump unit 19, and the water after heat extraction can be sent to the clean water tank 5 for recycling.
[0071] In specific implementation, the hot water flowing out of the heat pump unit 19 can be dissipated and utilized in places such as dormitory areas and office buildings. The water temperature is reduced, and the cold water returns to the heat pump unit 19. The temperature of the geothermal water is extracted to heat this part of the cold water. The heated hot water is returned to the office building and dormitory area again to achieve circulating heating.
[0072] In this application, the thermal energy extraction path can be summarized as follows: thermal energy is stored in coal seams and surrounding rocks, jet coal breaking devices break up coal bodies, surrounding rocks and coal bodies transfer thermal energy to drilling fluids, gas lift reverse circulation devices provide power to move to the ground, ground heat pump units 19 extract heat, and heat facilities are used.
[0073] Furthermore, heat absorption and release includes 4 cycles:
[0074] Geothermal heat extraction cycle: thermal energy is stored in coal seams and surrounding rocks, jet coal breaking device breaks coal bodies, surrounding rocks and coal bodies transfer thermal energy to drilling fluid, gas lift reverse circulation device provides power to move to the ground, plate heat exchanger 18 geothermal medium inlet, plate heat exchanger 18 extracts heat, plate heat exchanger 18 geothermal medium outlet, clean water tank 5.
[0075] The internal circulation of the plate heat exchanger 18: cold medium, plate heat exchanger 18 takes heat (from geothermal heat), hot medium, plate heat exchanger 18 releases heat (transferred to the heat pump unit 19), cold medium.
[0076] The internal circulation of the heat pump unit 19 includes: cold medium, evaporator heat extraction (from the plate heat exchanger 18), hot medium, condenser heat release (transferred to the terminal circulation), and cold medium.
[0077] Terminal cycle: cold medium, absorbed heat (from condenser), hot medium, heat-using facilities, cold medium.
[0078] From the above description, it can be seen that the present application provides a coal, gas, and heat coordinated mining system, including: a coal gas mining unit, a coal-water geothermal lifting unit, and a gas-heat utilization unit; the coal gas mining unit includes a ground fracturing fluid supply assembly, a directional drill rod 8, and a jet tool string 10; the ground fracturing fluid supply assembly is connected to the directional drill rod 8 through a high-pressure pipeline 7, and the other end of the high-pressure pipeline 7 is connected to the directional drill rod 8, and the jet tool string 10 is arranged on the side of the coal seam into which the directional drill rod 8 is probed; the ground fracturing fluid supply assembly is connected to the directional drill rod 8 through a high-pressure pipeline 7 in the coal breaking working state. The high-pressure pipeline 7 supplies fracturing fluid to the directional drill pipe 8; the fracturing fluid passes through the directional drill pipe 8 and is sprayed to the coal seam by the jet tool string 10 to perform jet cutting of coal; the coal-water geothermal lifting unit includes an air compressor 11, an air-water tap 12, and an air-lift reverse circulation double-wall drill pipe 13; the air compressor 11 is connected to the air-lift reverse circulation double-wall drill pipe 13 through the air-water tap 12 and the high-pressure pipeline 7; the air-lift reverse circulation double-wall drill pipe 13 is laid at one end of the coal seam and is provided with a reverse circulation roller drill bit 16; the air compressor 11 presses the compressed gas through the air-water tap 12 Air is injected into the gas lift reverse circulation double-wall drill pipe 13 to mix the coal slag, waste fracturing fluid and overflow gas obtained after jet cutting of coal to form a mixture, and the mixture is collected into the coal-water-gas separator 17 through the reverse circulation cone drill bit 16 and the gas lift reverse circulation double-wall drill pipe 13; the gas heat utilization unit includes the coal-water-gas separator 17, the insulated steel pipe 20, the steel pipe, the plate heat exchanger 18, the heat pump unit 19, the terminal heat facility, and the clean water tank 5; the coal-water-gas separator 17 is connected to the plate heat exchanger 18 through the insulated steel pipe 20 , the plate heat exchanger 18 is connected to the clean water tank 5 through a steel pipe, and the heat pump unit 19 is connected to the terminal heat facility through an insulated steel pipe 20; the coal-water-gas separator 17 separates the mixture to obtain a circulating liquid, and the circulating liquid is injected into the plate heat exchanger 18 through the insulated steel pipe 20 to perform the first cycle of energy extraction, and the plate heat exchanger 18 transmits the heat energy obtained by the first cycle of energy extraction to the heat pump unit 19 for the second cycle of energy extraction, and the heat pump unit 19 transmits the heat energy obtained by the second cycle of energy extraction to the terminal heat facility for heat energy release. This application realizes the simultaneous mining of ground coal, gas and heat resources through the coordinated mining of coal, gas and heat, and solves the technical problems of poor positive cycle lifting efficiency and low coal content in conventional drilling hydraulic extraction. This application uses directional drilling technology to carry out layer mining, which is used for thin coal seam mining and structural coal (easy to break) mining. It can not only effectively increase the production of a single well and reduce the amount of coal lost at the working face, but also utilize geothermal resources, greatly reducing the waste of resources.
[0079] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present application (including the claims) is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of one or more embodiments of the present specification as described above, which are not provided in detail for the sake of simplicity.
[0080] In addition, to simplify the description and discussion, and in order not to obscure one or more embodiments of the present specification, known power / ground connections to integrated circuit (IC) chips and other components may or may not be shown in the provided figures. In addition, the device may be shown in the form of a block diagram so as to avoid obscuring one or more embodiments of the present specification, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform on which one or more embodiments of the present specification are to be implemented (i.e., these details should be fully within the scope of understanding of those skilled in the art). Where specific details (e.g., circuits) are set forth to describe exemplary embodiments of the present application, it is apparent to those skilled in the art that one or more embodiments of the present specification may be implemented without these specific details or with variations in these specific details. Therefore, these descriptions should be considered illustrative rather than restrictive.
[0081] Although the present application has been described in conjunction with specific embodiments thereof, many alternatives, modifications and variations of these embodiments will be apparent to those skilled in the art in light of the foregoing description.
[0082] One or more embodiments of this specification are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of one or more embodiments of this specification should be included in the scope of protection of this application.
Claims
1. A system for coordinated mining of coal, gas and heat, characterized in that: include: Gas extraction unit, coal-water geothermal lifting unit, gas-heat utilization unit; The coal gas extraction unit comprises a surface fracturing fluid supply assembly, a directional drill rod, and a jet tool string; the surface fracturing fluid supply assembly is connected to the directional drill rod through a high-pressure pipeline, and the jet tool string is arranged on the side of the coal seam into which the directional drill rod penetrates; the surface fracturing fluid supply assembly supplies fracturing fluid to the directional drill rod through the high-pressure pipeline in a coal breaking working state; The fracturing fluid passes through the directional drill pipe and is sprayed by the jet tool string to the coal seam to perform jet cutting of coal; The coal-water geothermal lifting unit comprises an air compressor, an air-water tap, and an air-lift reverse circulation double-wall drill pipe; the air compressor is connected to the air-lift reverse circulation double-wall drill pipe through the air-water tap and a high-pressure pipeline; one end of the air-lift reverse circulation double-wall drill pipe laid in the coal seam is provided with a reverse circulation roller drill bit; the air compressor injects compressed air into the air-lift reverse circulation double-wall drill pipe through the air-water tap, so that the coal slag, waste fracturing fluid and overflow gas obtained after jet cutting of coal are mixed to form a mixture, and the mixture is collected by the reverse circulation roller drill bit and the air-lift reverse circulation double-wall drill pipe into a coal-water-gas separator; The gas heat utilization unit includes a coal-water-gas separator, an insulated steel pipe, a steel pipe, a plate heat exchanger, a heat pump unit, a terminal heat facility, and a clean water tank; the coal-water-gas separator is connected to the plate heat exchanger through an insulated steel pipe, the plate heat exchanger is connected to the clean water tank through the steel pipe, and the heat pump unit is connected to the terminal heat facility through the insulated steel pipe; the coal-water-gas separator separates the mixture to obtain a circulating liquid, and the circulating liquid is injected into the plate heat exchanger through the insulated steel pipe to perform a first cycle of energy extraction, the plate heat exchanger transmits the heat energy obtained from the first cycle of energy extraction to the heat pump unit to perform a second cycle of energy extraction, and the heat pump unit transmits the heat energy obtained from the second cycle of energy extraction to the terminal heat facility to release heat energy; The gas heat utilization unit also includes a boiler room, and the coal-water-gas separator includes at least a gas outlet, a water outlet, and a coal outlet; the water outlet is connected to the plate heat exchanger; the gas outlet is connected to the boiler room through a high-pressure pipeline, and the connection method is a locking connection; the coal outlet is used to discharge coal; The heat pump unit includes a condenser and an evaporator; the evaporator is used to absorb heat from the plate heat exchanger; the condenser is used to release heat to the terminal heat facility in a cycle; The gas outlet is connected to the boiler room through the high-pressure pipeline, and the boiler room burns gas to generate electricity and supply the heat pump unit; the heat pump unit performs a second cycle to extract energy, extracting geothermal energy from the circulating fluid to supply the terminal heat facilities; After the circulating fluid has been through the first cycle to extract energy, it is filled with clean water and injected into the gas extraction unit to participate in the extraction of resources.
2. The system according to claim 1, characterized in that The ground fracturing fluid supply assembly includes a fracturing truck, a mixing truck, an instrument truck, and a clean water tank; The clean water in the clean water tank is processed by the mixing vehicle to obtain the fracturing fluid, and the fracturing fluid is supplied to the fracturing vehicle by the instrument vehicle.
3. The system according to claim 1, characterized in that The connection mode between the high-pressure pipeline and the ground fracturing fluid supply assembly is a hook connection, and the connection mode between the high-pressure pipeline and the directional drill rod is a locking connection.
4. The system according to claim 1, characterized in that The coal-breaking drill hole of the coal gas extraction unit is divided into a vertical section, a curved section, and a horizontal section. The vertical section is from the ground to the top of the coal seam and is at a preset distance from the top of the coal seam; the horizontal section is set in the coal seam; the curved section is from the end point of the vertical section to the starting point of the horizontal section.
5. The system according to claim 1, characterized in that The air compressor is connected to the gas lift reverse circulation double-wall drill pipe through the air-water tap and the high-pressure pipeline; the connection mode between the high-pressure pipeline and the air-water tap is a locking connection, and the high-pressure pipeline and the air compressor are connected by a hook head.
6. The system according to claim 1, characterized in that The connection mode of the coal-water-gas separator, the plate heat exchanger and the insulated steel pipe is a hook connection; the connection mode of the plate heat exchanger and the clean water tank is a hook connection.
7. The system according to claim 1, characterized in that After the coal gas resource exploitation is completed, the coal-water geothermal lifting unit and the gas heat utilization unit are retained; the circulating fluid is directly injected into the exploitation well after the first cycle of energy extraction to continue to extract geothermal energy in the formation.
Citation Information
Patent Citations
Method for extracting coalbed methane and coal together
CN103670338A
Deep coal seam roof drilling coal and hot gas co-mining method
CN111911224A
Coal underground in-situ gasification and heat energy co-mining integrated method
CN113863910A