Testing device and method for simulating tunnel seepage grouting reinforcement under different water pressures
By simulating the test device of different water pressure and ground stress environments, the problem that existing technology cannot accurately evaluate the grouting reinforcement effect is solved, the grouting path planning and effect evaluation under different ground stress and water pressure are realized, and the grouting efficiency is improved. Efficiency and accuracy of slurry reinforcement.
Patent Information
- Application Number
- CN202411001756.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology cannot effectively simulate the grouting reinforcement effect of layered rock mass under different geostress and water pressure, and the existing evaluation methods are complex and inaccurate, making it difficult to evaluate the optimal grouting reinforcement under different geostress and water pressure environments. optimal paths and effects.
Provides a test device for simulating tunnel seepage grouting reinforcement under different water pressures, including a ground stress loading device, a grouting model device, a water injection device, a monitoring device and a grouting reinforcement effect device. By simulating the underground water pressure and ground stress environment at the construction site , monitor grouting parameters in real time, evaluate grouting effects, and guide on-site construction.
This device can accurately evaluate the grouting reinforcement effect, obtain the optimal grouting path, improve the grouting reinforcement effect in complex underground environments, save the grouting amount, avoid over-grouting, and provide a fast and effective evaluation method.
Smart Images

Figure CN118730743A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of underground engineering disaster prevention and control, and in particular to a tunnel seepage grouting reinforcement testing device and method simulating different water pressures. Background Art
[0002] Crossing the interface of poor geological bodies and stratum structures usually becomes a controlling project in the construction of submarine tunnels, which directly affects the construction safety. If it is not handled properly, it will induce disasters and lead to project failure. In order to achieve stability control of the surrounding rock mass in poor geological sections, grouting reinforcement technology has been widely used around the world, playing an important role in project safety and quality assurance, and has also strongly promoted the continuous progress and rapid development of underwater tunnel and water-stratum tunnel construction technology.
[0003] Grouting is an effective means of dealing with adverse geology and improving surrounding rock conditions. It has been widely used in railways, highways, water conservancy, mining and other fields. However, most of the current model tests use homogeneous rock and soil for testing, which cannot consider the influence of rock mass on slurry diffusion and slurry reinforcement effect under different water pressure environments. Another method is to reinforce the layered rock mass with different grouting materials, conduct uniaxial and conventional triaxial tests after the specimens are cured, obtain the physical and mechanical parameters of the specimens, and quantitatively evaluate the grouting reinforcement effect. This method focuses on the mechanical property analysis of the reinforced body and cannot intuitively show the diffusion and sealing process of the slurry in the cracks. In addition, this method does not consider the influence of initial ground stress and water pressure, and is difficult to apply to the grouting reinforcement effect of layered rock mass under different ground stresses and different water pressures.
[0004] On the other hand, there are four main methods for evaluating the effect of grouting reinforcement in China, namely analytical evaluation method, borehole inspection method, excavation sampling method and geophysical exploration method. The analytical evaluation method is mainly the PQt curve method, which is complicated and the analysis of the reinforcement effect is only qualitative. The borehole inspection method includes the borehole TV method, the coring rate method and the permeability coefficient method. The borehole TV method judges the grouting effect by observing the integrity of the surrounding rock of the hole wall and the filling of the cracks; the extraction rate method makes a qualitative evaluation of the reinforcement effect by measuring the extraction rate, fragmentation and water content of the rock core sample; the permeability coefficient method is to inject water into the borehole and evaluate the grouting effect by testing whether the permeability coefficient decreases. The excavation sampling method includes the mechanical parameter comparison method and the reinforcement effect observation method. The mechanical parameter comparison method reflects whether the surrounding rock strength is improved by testing and comparing the changes in mechanical parameters such as stratum moisture content, compression modulus, and compressive strength before and after grouting, thereby evaluating the grouting reinforcement effect; the reinforcement effect observation method qualitatively evaluates the reinforcement effect by observing whether there are mud gushing, water gushing, and hole collapse in the test hole. Both the drilling inspection method and the excavation sampling method require drilling holes in the structure. If too few holes are drilled, it is difficult to evaluate the overall situation, and too many holes will cause damage to the structure. The geophysical method mainly evaluates the grouting effect by measuring the changes in wave velocity and resistivity of the stratum before and after grouting. The geophysical method has a large survey depth, and the measurement results are seriously affected by the environment. It is particularly important to develop an evaluation method for reinforcement devices that is easy to operate and can accurately evaluate the grouting effect.
[0005] Therefore, there is an urgent need for a test device and test method for simulating underwater tunnel seepage grouting reinforcement under different water pressures, which can simulate the grouting reinforcement effect of layered rock mass under different ground stresses and different water pressures, obtain the optimal grouting path, and accurately evaluate the grouting reinforcement effect. Summary of the invention
[0006] The purpose of the present invention is to provide a tunnel seepage grouting reinforcement testing device and method simulating different water pressures, which can simulate the grouting path planning and reinforcement of layered rock mass under different ground stresses and different water pressures, and can accurately evaluate the grouting reinforcement effect, in view of the defects and shortcomings of the prior art.
[0007] In order to achieve the above-mentioned purpose, the present invention provides a tunnel seepage grouting reinforcement test device simulating different water pressures, including a ground stress loading device, a grouting model device, a water injection device, a grouting device, a monitoring device, and a grouting reinforcement effect device; the grouting model device includes a box body with at least one side movable, and the box body is provided with a transparent grouting observation plate, a grouting hole, a water outlet hole and a rock mass; the ground stress loading device includes a press machine that applies pressure to the movable side of the box body; the water injection device includes a water tank with adjustable height, and the water tank is connected to the rock body through a water injection pipe. The box forms different underground water pressures on the rock mass; the grouting device includes a grouting steel pipe drilled into the rock mass, and the grouting steel pipe is radially provided with grouting ports arranged along the axial direction; the monitoring device monitors the grouting parameters in real time through the induction line connected to the sensor, and the grouting parameters at least include grouting pressure and flow rate; the grouting reinforcement effect device includes a grouting effect observation tube with zero grouting pressure, the grouting effect observation tube is embedded in the rock mass, and the porosity of the embedded rock mass is limited to the grouting slurry, and the grouting effect is judged in real time according to the concentration of the grouting slurry flowing out of the grouting effect observation tube. The tunnel seepage grouting reinforcement test device simulating different water pressures of the present invention adopts a ground stress loading device and a water injection device to simulate the stress environment of the underground rock mass, truly restores the construction site environment, simulates the on-site grouting situation through a grouting model device and a grouting device, obtains a grouting effect close to the real one according to the grouting reinforcement effect device, and the data obtained by the monitoring device is used to guide the on-site construction, which greatly improves the seepage grouting reinforcement effect of the underground complex environment rock mass during the tunnel excavation process, saves the grouting amount, and avoids excessive grouting.
[0008] The box body is composed of steel plates that are tightly connected to each other. A movable steel plate is provided on the top of the box body, and a water injection port is provided on the movable steel plate. The steel plate on the side of the box body is provided with grouting holes and water outlet holes arranged up and down. A transparent grouting observation plate is provided between the grouting holes and the water outlet holes to facilitate observation of the grouting effect of the grouting slurry.
[0009] The press is connected to a pressure plate via a hydraulic jack, and the pressure plate applies pressure to the movable steel plate to simulate the ground stress on the rock mass.
[0010] The water tank is connected to a chain hoist, and the chain hoist drives the water tank to move up and down, so as to simulate an underground water system environment with different water pressures.
[0011] The grouting steel pipe is connected to the air pump and the first grouting pump in the first grouting bucket through the first grouting pipe, the first grouting pipe is connected to the second grouting pipe, and the second grouting pipe is connected to the air pump and the second grouting pump in the second grouting bucket.
[0012] The first grouting bucket is provided with a first mixer for uniformly mixing the grouting slurry. The second grouting bucket is provided with a second mixer for uniformly mixing the grouting slurry.
[0013] The monitoring device includes sensors, including stress gauges, strain gauges, flow meters and pressure monitors; the stress gauge is placed in the grouting model device, the strain gauge is attached to the inner wall of the box, the flow meter is placed on the pipes connected to the water injection pipe, the grouting steel pipe and the water outlet, and the pressure monitor is placed in the first grouting pipe. The monitoring device realizes the stress and stress change of the rock mass in the grouting model device, and has the changes in pressure, water injection and grouting flow, and realizes the restoration of the water vapor content and ground stress changes of the rock mass in the underground environment, providing accurate data support for the actual on-site grouting work.
[0014] The water injection port and the water injection pipe are sealed by epoxy resin AB glue, and the grouting hole and the grouting steel pipe are sealed by epoxy resin AB glue to prevent water and grouting slurry from leaking out.
[0015] A tunnel seepage grouting reinforcement test method simulating different water pressures comprises the following steps: (1) Prepare a grouting model device. The four side plates and the bottom plate of the grouting model device box are connected by high-strength bolts, and rubber gaskets are used to seal the joints to ensure the watertightness of the box; (2) Place the rock mass into an open box, and then connect the movable steel plate to the box in a sealed manner; (3) The water injection device injects water into the grouting model device through the water injection pipe, adjusts the height of the water tank, forms different groundwater pressures on the rock mass, and simulates the groundwater pressure environment at the construction site; (4) Turn on the geostress loading device and apply pressure to the movable steel plate through the pressure plate of the geostress loading device to simulate the geostress of the rock mass underground at the construction site; (5) Prepare the grouting device, drill the grouting steel pipe into the rock mass, connect the grouting steel pipe to the first grouting pipe, and transport the grouting slurry to the grouting model device through the grouting holes of the grouting steel pipe; when slurry flows out of the grouting effect observation pipe and the flow meters installed in the grouting effect observation pipe and the grouting steel pipe show that the flow rates of the grouting effect observation pipe and the grouting steel pipe are similar, stop the grouting; (6) The monitoring device monitors the grouting parameters in real time and records the grouting parameters of the final grouting reinforcement to guide the tunnel seepage grouting reinforcement under different water pressures at the construction site.
[0016] In the steps, different underground water pressures are formed on the rock mass, and an artificial water head is artificially set. The artificial water head is used to guide the grouting slurry to flow in a desired direction, and the concentration of the slurry flowing out of the grouting effect observation pipe is observed to judge the grouting reinforcement effect in real time. The artificial water head is the artificially set underground water pressure. The different water pressures are used to guide the grouting slurry to flow in a desired direction to improve the grouting effect.
[0017] In the steps, there are two or more grouting steel pipes, which are evenly distributed up and down, and the grouting pressure is greater than the existing environmental water pressure to avoid rock collapse.
[0018] By adopting the above-mentioned technical scheme, a test device and method for simulating tunnel seepage grouting reinforcement under different water pressures is provided. The grouting model device is used to simulate the water content and water head of the rock mass under different water pressures at the construction site by a ground stress loading device and a water injection device, and the construction rock mass environment is restored. Grouting is injected into the rock mass through a grouting steel pipe through a grouting device, and the grouting effect is evaluated by a grouting reinforcement effect device. At the same time, the optimal grouting parameters are obtained by a monitoring device.
[0019] The grouting reinforcement testing device of the present invention provides a rapid and effective means of judging the grouting effect for reinforcing waterstopping in practical projects, and can simulate the grouting reinforcement effect of different grouting pressures under the combined action of different ground stresses and water pressures. The overall operation is convenient, the structure is simple, and the test is accurate. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0021] FIG1 is a schematic structural diagram of a tunnel seepage grouting reinforcement testing device for simulating different water pressures according to the present invention; FIG2 is a schematic diagram of the grouting steel pipe installation structure in the present invention; FIG3 is a schematic diagram of the structure of the grouting model device in the invention. DETAILED DESCRIPTION
[0022] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the present invention.
[0023] like Figure 1-3 A tunnel seepage grouting reinforcement test device and method for simulating different water pressures, including a ground stress loading device, a grouting model device, a water injection device, a grouting device, a monitoring device, and a grouting reinforcement effect device. The grouting model device includes a box 10 with at least one side movable, and the box 10 is provided with a transparent grouting observation plate 5, a grouting hole 26, a water outlet 25 and a rock mass. The water outlet 25 is connected to a water storage bucket 8 through a first pipe 9.
[0024] As a preferred structure, the stress loading device includes a press 11 for applying pressure to the movable side of the box 10. The press 11 is connected to a pressure plate 12 via a hydraulic jack, and the pressure plate 12 applies pressure to the movable steel plate 30 to simulate the real ground stress of the rock mass in the underground.
[0025] As a preferred structure, the water injection device 14 includes a water tank 16 with adjustable height, which is connected to the box body 10 through the water injection pipe 13 to form different underground water pressures on the rock mass. As a way to adjust the water pressure, the water tank 16 is connected to the chain hoist 15, and the chain hoist 15 drives the water tank 16 to move up and down to achieve changes in water pressure.
[0026] As a preferred structure, the grouting device includes a grouting steel pipe 22 drilled into the rock mass, and the grouting steel pipe 22 is radially provided with grouting ports 52 arranged along the axial direction, which are used for grouting into the rock mass voids. The specific grouting process is as follows: the grouting steel pipe 22 is connected to the air pump 1 and the first grouting pump 2 in the first grouting bucket 3 through the first grouting pipe 21, and the grouting slurry in the first grouting bucket 3 is injected into the rock mass. In order to further improve the effect of grouting reinforcement, the first grouting pipe 21 is connected to the second grouting pipe 20, and the second grouting pipe 20 is connected to the air pump 1 and the second grouting pump 17 in the second grouting bucket 18 to increase the grouting flow rate. Different grouting steel pipes can also be connected to achieve multi-point grouting performance. In order to increase the uniformity of the grouting slurry, a first mixer 4 is provided in the first grouting bucket 3, and a second mixer 19 is provided in the second grouting bucket 18.
[0027] As a preferred structure, the monitoring device 7 includes sensors, including stress gauges, strain gauges, flow meters and pressure monitors; the stress gauge is placed in the grouting model device, the strain gauge is attached to the inner wall of the box 10, the flow meter is placed on the pipeline connected to the water injection pipe, the grouting steel pipe 22 and the water outlet 25, and the pressure monitor is placed in the first grouting pipe 21. The monitoring device 7 monitors the grouting parameters in real time through the induction line 6 connected to the sensor, and the grouting parameters at least include the grouting pressure and flow rate.
[0028] The grouting reinforcement effect device includes a grouting effect observation tube with zero grouting pressure, the grouting effect observation tube is embedded in the rock mass, the porosity of the embedded rock mass is limited to the grouting slurry, and the grouting effect is judged in real time according to the concentration of the grouting slurry flowing out of the grouting effect observation tube. In order to facilitate the observation of the experimental process, the box 10 is composed of steel plates connected to each other in a closed manner, a movable steel plate 30 is provided on the top of the box, and a water injection port 24 is provided on the movable steel plate, and a grouting hole 26 and a water outlet 25 are arranged in the steel plate on the side of the box, and a transparent grouting observation plate 5 is arranged between the grouting hole and the water outlet.
[0029] In order to improve the airtightness of the box body 10, the water injection port 24 and the water injection pipe 13 are sealed by epoxy resin AB glue, and the grouting hole 26 and the grouting steel pipe 22 are sealed by epoxy resin AB glue.
[0030] A test device and method for simulating tunnel seepage grouting reinforcement under different water pressures. The method comprises the following steps: (1) Prepare a grouting model device. The four side plates and the bottom plate of the grouting model device are connected by high-strength bolts. The joints are sealed with 2 mm thick rubber gaskets. The joints of the steel plates inside the grouting model are sealed with epoxy resin AB glue to form a box body 10 to ensure the watertightness of the box body. (2) placing the rock mass into the open box 10, and then sealingly connecting the movable steel plate 30 to the box; (3) The water injection device 14 injects water into the grouting model device through the water injection pipe 13, adjusts the height of the water tank 16, forms different groundwater pressures on the rock mass, and simulates the groundwater pressure environment at the construction site; (4) Turning on the geostress loading device, applying pressure to the movable steel plate 30 through the pressure plate 12 of the geostress loading device to simulate the geostress of the rock mass underground at the construction site; (5) Prepare the grouting device, drill the grouting steel pipe 22 into the rock mass, connect the grouting steel pipe 22 to the first grouting pipe 21, and deliver the grouting slurry to the grouting model device through the grouting port 52 of the grouting steel pipe 22; when slurry flows out of the grouting effect observation pipe and the flow meters installed in the grouting effect observation pipe and the grouting steel pipe 22 show that the flow rates of the grouting effect observation pipe and the grouting steel pipe 22 are similar, stop the grouting; (6) The monitoring device 7 monitors the grouting parameters in real time, and records the grouting parameters of the final grouting reinforcement to guide the tunnel seepage grouting reinforcement under different water pressures at the construction site.
[0031] As a preferred method, in step (3), different underground water pressures are formed on the rock mass, and an artificial water head is artificially set. The artificial water head is used to guide the grouting slurry to flow in a desired direction, and the concentration of the slurry flowing out of the grouting effect observation pipe is observed to judge the grouting reinforcement effect in real time. In step (5), there are two or more grouting steel pipes 22, which are evenly distributed up and down, and the grouting pressure is greater than the existing environmental water pressure.
[0032] As a specific implementation scheme, the platform size of the box 10 is 1000mm*1000mm*1000mm. The box 10 is made of 10mm thick steel plate, which can meet the requirement of maximum grouting pressure of 10Mpa. The sides and bottom are connected with high-strength bolts. To ensure the airtightness of the model box, the joints are sealed with 2mm thick rubber gaskets and sealants. Transparent grouting observation panels of different heights are set on the sides. High-strength organic glass is used. The organic glass is 225mm*100mm. The bottom of the organic glass is 225mm, 450mm, 675mm, and 900mm away from the bottom of the box 10. A water injection port with a radius of 20mm is reserved at the top of the box 10, and a water outlet with a radius of 5mm is reserved at the bottom. After the rock mass sample is placed in the box, the movable steel plate 30 is embedded in the open part of the box for sealing, and the joints are sealed with thick rubber pads and sealants.
[0033] The specific grouting steps in the grouting device are as follows: ① First, two upper and lower parallel grouting steel pipes and a grouting effect observation pipe with zero grouting pressure are drilled into the rock mass. The two upper and lower parallel grouting steel pipes are the grouting steel pipe 22 and the first grouting steel pipe 23. The first grouting steel pipe 23 is provided with first grouting holes 44 at equal intervals, and the grouting steel pipe 22 is provided with grouting ports 52 at equal intervals.
[0034] ② Each grouting steel pipe is symmetrically distributed up and down, and the spacing between adjacent holes is adjusted in time according to the situation; ③ The grouting pressure of the grouting steel pipe is greater than the existing environmental water pressure; the grouting effect observation tube with zero grouting pressure is embedded in the rock mass, and the porosity of the embedded rock mass is only limited to the entry of grouting slurry. The concentration of the grouting slurry flowing out of the grouting effect observation tube is used to judge the grouting effect in real time.
[0035] Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. Those skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and purpose of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tunnel seepage grouting reinforcement test device simulating different water pressures, characterized in that: The invention comprises a ground stress loading device, a grouting model device, a water injection device, a grouting device, a monitoring device, and a grouting reinforcement effect device; the grouting model device comprises a box body (10) with at least one side being movable, the box body (10) being provided with a transparent grouting observation plate (5), a grouting hole (26), a water outlet hole (25), and a rock mass; the ground stress loading device comprises a press (11) for applying pressure to the movable side of the box body (10); the water injection device (14) comprises a water tank (16) with adjustable height, the water tank (16) being connected to the box body (10) via a water injection pipe (13) The rock mass forms different underground water pressures; the grouting device comprises a grouting steel pipe (22) drilled into the rock mass, the grouting steel pipe (22) radially opening grouting ports (52) arranged along the axial direction; the monitoring device (7) monitors the grouting parameters in real time via a sensing line (6) connected to the sensor, the grouting parameters at least including the grouting pressure and flow rate; the grouting reinforcement effect device comprises a grouting effect observation tube with a zero grouting pressure, the grouting effect observation tube is embedded in the rock mass, the porosity of the embedded rock mass is limited to the entry of grouting slurry, and the grouting effect is judged in real time according to the concentration of the grouting slurry flowing out of the grouting effect observation tube.
2. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 1, characterized in that: The box body (10) is formed by steel plates that are tightly connected to each other. A movable steel plate (30) is provided on the top of the box body. The movable steel plate is provided with a water injection port (24). The steel plate on the side of the box body is provided with grouting holes (26) and water outlet holes (25) arranged vertically. A transparent grouting observation plate (5) is provided between the grouting holes and the water outlet holes.
3. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 1, characterized in that: The press (11) is connected to a pressure plate (12) via a hydraulic push rod, and the pressure plate (12) applies pressure to the movable steel plate (30).
4. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 1, characterized in that: The water tank (16) is connected to the chain hoist (15), and the chain hoist (15) drives the water tank (16) to move up and down.
5. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 1, characterized in that: The grouting steel pipe (22) is connected to the air pump (1) and the first grouting pump (2) in the first grouting bucket (3) via a first grouting pipe (21); the first grouting pipe (21) is connected to a second grouting pipe (20); the second grouting pipe (20) is connected to the air pump (1) and the second grouting pump (17) in the second grouting bucket (18).
6. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 5, characterized in that: A first mixer (4) is provided in the first grouting bucket (3), and a second mixer (19) is provided in the second grouting bucket (18).
7. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 1, characterized in that: The monitoring device (7) comprises a sensor, which comprises a stress gauge, a strain gauge, a flow meter and a pressure monitoring gauge; the stress gauge is placed in the grouting model device, the strain gauge is adhered to the inner wall of the box (10), the flow meter is placed in the pipeline connecting the water injection pipe, the grouting steel pipe (22) and the water outlet (25), and the pressure monitoring gauge is placed in the first grouting pipe (21).
8. The tunnel seepage grouting reinforcement testing device for simulating different water pressures according to claim 2, characterized in that: The water injection port (24) and the water injection pipe (13) are sealed by epoxy resin AB glue, and the grouting hole (26) and the grouting steel pipe (22) are sealed by epoxy resin AB glue.
9. The method for testing tunnel seepage grouting reinforcement under simulated different water pressures according to claim 1, characterized in that: The following steps are involved: (1) preparing a grouting model device, wherein the four side plates and the bottom plate of the grouting model device box (10) are connected by high-strength bolts, and the joints are sealed with rubber gaskets to ensure the watertightness of the box; (2) placing the rock mass into an open box (10), and then sealingly connecting the movable steel plate (30) to the box; (3) The water injection device (14) injects water into the grouting model device through the water injection pipe (13), adjusts the height of the water tank (16), forms different groundwater pressures on the rock mass, and simulates the groundwater pressure environment at the construction site; (4) turning on the geostress loading device, applying pressure to the movable steel plate (30) through the pressure plate (12) of the geostress loading device to simulate the geostress of the rock mass underground at the construction site; (5) preparing a grouting device, drilling a grouting steel pipe (22) into the rock mass, connecting the grouting steel pipe (22) to the first grouting pipe (21), and delivering the grouting slurry to the grouting model device through the grouting port (52) of the grouting steel pipe (22); when slurry flows out of the grouting effect observation pipe and the flow meters installed in the grouting effect observation pipe and the grouting steel pipe (22) show that the flow rates of the grouting effect observation pipe and the grouting steel pipe (22) are similar, stopping the grouting; (6) The monitoring device (7) monitors the grouting parameters in real time and records the grouting parameters of the final grouting reinforcement to guide the tunnel seepage grouting reinforcement under different water pressures at the construction site.
10. A tunnel seepage grouting reinforcement test method simulating different water pressures according to claim 9, characterized in that: In step (3), different underground water pressures are formed on the rock mass, and an artificial water head is artificially set. The artificial water head is used to guide the grouting slurry to flow in a desired direction. The concentration of the slurry flowing out of the grouting effect observation pipe is observed to judge the grouting reinforcement effect in real time. In the step (5), there are two or more grouting steel pipes (22), which are evenly distributed up and down, and the grouting pressure is greater than the existing environmental water pressure.
Citation Information
Patent Citations
Grouting effect evaluation device for geotechnical engineering
CN104458425A
Coal mine fault fracture zone grouting reinforcement method based on tracer technology
CN110529150A
Construction method for stratum reinforcement before chamber opening of shield cutter head
CN111502672A
Model test device and test method for water-rich fractured rock stratum flowing water grouting reinforcement
CN114152510A
Visual grouting model test system and test method for unfavorable geology
CN115436601A
Cited By
Classified and segmented grouting device capable of monitoring crustal stress and use method of classified and segmented grouting device
CN118958999A