Portal machine moving method using axis vehicle
Through the combination of equipment such as axle truck and hoisting beam, the problem of long downtime during door seat moving is solved, more efficient shifting and stability is achieved, and working efficiency is improved.
Patent Information
- Application Number
- CN202411255832.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-08
AI Technical Summary
The prior art has a long downtime and low efficiency during the portable machine movement, which affects the working progress.
The door seat is moved by axial vehicle. The lifting beam is used as a lifting device, combined with the shoulder beam and hand-pulled hoist to ensure the stability of the door seat during transportation, and becomes rigid through flexible connections to prevent the wheels from being connected. Deformation, reduce downtime.
It improves the efficiency of the portal moving machine, reduces downtime, enhances transportation stability, avoids wheel deformation, and improves working efficiency.
Smart Images

Figure CN118908052A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of large equipment hoisting, in particular to a portal machine moving method using an axis vehicle. Background Art
[0002] In the past, when moving a gantry crane, it was first necessary to build a track on the ground and then move the horizontal trolley over. During this process, turning was also involved. The overall moving time was long, the process was complicated, the overall operation time was long, and the downtime was also long, which did not meet the owner's downtime requirements.
[0003] In the document CN202221583247, an omnidirectionally movable gantry crane device is disclosed, including a gantry crane assembly, wherein mobile platform vehicles are fixed to both sides of the bottom end of the gantry crane assembly by bolts, Mecanum wheels are provided around the bottom end of the mobile platform vehicle, and a remote control is fixed to one side of the top of the mobile platform vehicle on the left side. This form of transportation of the machine causes a long downtime of the machine, which affects the overall work and reduces work efficiency.
[0004] Therefore, a new technical solution is needed to solve the above technical problems. Summary of the invention
[0005] In order to solve the above problems, the present invention discloses a method for moving a gantry machine using an axis vehicle. Under the premise of ensuring the overall stability of the gantry machine, the machine is moved by the axis vehicle, thereby reducing the downtime of the gantry machine and improving the moving efficiency of the gantry machine.
[0006] The technical solution of the present invention is: a method for moving a portal machine using an axis vehicle, comprising the following steps: Step 1: Drive the single-arm gantry crane MQ5070 to the northernmost side of the dock, stop it at the 60m position of the main hook, and clear the obstacles on the moving route; Step 2: Use the lifting beam to lift the small balance beam and remove the driven trolley group, and keep the shoulder beam in its original position; By adopting the above technical solution, the jacking beam is used as a temporary lifting device, which can effectively improve the work efficiency; Step 3: All eight driven trolleys on the four outriggers of the single-arm gantry crane are removed and secured with a shoulder pole beam; Step 4: Use the forklift and hand chain hoist to insert the joist horizontally into the bottom of the large balance beam; By adopting the above technical solution, it is convenient to drive the axis car under the large flat beam for later operation; Step 5: Drive the axis car to the bottom of the joist, and slowly lift the door seat 50mm off the ground with eight points of force at the same time. Use a card plate on the outside to fix the position of the joist and the axis car, and check the axis pressure at each point to ensure that the force at each point is basically consistent; By adopting the above technical solution, the center position is ensured to remain in the center position, preventing lateral shift, and ensuring continuous stability and strong stability during transportation; Step 6: After adjustment, rotate the anchor and lock it, cut off the main power supply, check and ensure that the main structure is well grounded, and remove the upper machine cable and fix it on the door base machine; Step 7: Slowly lift it up 100mm from the ground, move the MQ5070 gantry crane to the side track, and then use the shoulder pole beam to install the driven trolley group on the track; Step 8: Move the MQ50100 gantry crane to the northernmost side of the dock and stop the boom at the 55m position of the main hook; Step 9: Use the lifting beam to lift up the small balance beam and remove the driven trolley group at four locations, and weld the small balance beam and the middle balance beam with connecting angle steel, and keep the shoulder pole beam in its original position; By adopting the above technical solution, the small balance beam and the middle balance beam are changed from a flexible connection to a rigid connection, so that the wheels can be prevented from being deformed during transportation.
[0007] Step 10: Use the forklift and hand chain hoist to insert the joist horizontally into the bottom of the large balance beam, rotate it 90 degrees after it is in place, and use the hoist to press the joist against the bottom of the large balance beam; Step 11: Drive the axis car to the bottom of the joist, and slowly lift the door seat 50mm off the ground with eight points of force at the same time. Use a card plate on the outside to fix the position of the joist and the axis car, and check the axis pressure at each point to ensure that the force at each point is basically consistent; Step 12: After adjustment, rotate the anchor and lock it, cut off the main power supply, check and ensure that the main structure is well grounded, and remove the upper machine cable and fix it on the door base machine; Step 13: Drive the axis car to the bottom of the joist, and fix the joist and the axis car with a clamp on the outside; Step 14: Follow the original operation process to move MQ5070 back to the original track; Step 15: Touch up the paint and the machine relocation project is completed.
[0008] Preferably, the working condition in step 1 is to pay attention to the weather conditions before moving the machine. It is strictly forbidden to carry out the moving operation when the wind force is greater than or equal to level 6, and choose to work in rainless weather.
[0009] Preferably, during the dismantling process in step 3, the small balance beam and the middle balance beam are fixed by spot welding with angle steels.
[0010] Preferably, in step 4, the joist is rotated 90 degrees after it is in place, and a 5t hoist is used to hold the joist close to the bottom of the large balance beam.
[0011] Preferably, when the deviation is large in step 5, it is necessary to put the gantry crane back on track and adjust the amplitude change to make the center of gravity as close to the rotation center as possible, so that the forces on the axis vehicles are basically the same.
[0012] Preferably, when the deviation is large in step 11, it is necessary to put the portal frame machine back on track, adjust the amplitude change range to make the center of gravity position as close to the rotation center as possible, and the forces on the axis vehicles are basically the same.
[0013] Preferably, in step 13, ensure that four points are synchronously stressed to slowly lift the portal machine 100 mm off the ground, move the MQ50100 portal machine to the east side of the 600t rigid leg, then drop the rails, connect the upper machine cable and stop it at the anchoring position.
[0014] Advantages of the present invention: 1. The present invention can accurately find the center position of the portal crane, adjust the portal crane arm to a suitable amplitude, and ensure that the stability of the portal crane during transportation meets the requirements through reasonable means and measures.
[0015] 2. During transportation, the present invention fixes the flexibly connected middle balance beam and the small balance beam by angle steel, so that the flexible connection is changed into a rigid connection, which can enhance its stability and avoid shaking during transportation, thereby effectively preventing the wheel from being deformed.
[0016] 3. The present invention adopts an axis machine to move the portal base machine, which can effectively improve the moving efficiency of the portal base machine, reduce downtime, and improve work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure in which the small balance beam and the middle balance beam of the present invention are fixed by angle steel; Figure 2 This is a schematic diagram of the structure of the lifting beam of the present invention lifting up the small balance beam; Figure 3 It is a structural schematic diagram of the bottom of the axis parking door seat machine of the present invention; Figure 4 For the present invention Figure 3 A schematic diagram of the structure in side view; Figure 5 It is a structural schematic diagram of the door seat machine of the present invention.
[0018] Among them: 1. Shoulder pole beam, 2. Axis car, 3. Support beam, 4. Large balance beam, 5. Lifting beam, 6. Main hook, 7. Middle balance beam, 8. Small balance beam. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0020] like Figure 1-5 As shown, a method for moving a portal machine using an axis vehicle comprises the following steps: Step 1: Before moving the machine, pay attention to the weather conditions. It is strictly forbidden to carry out the moving operation when the wind force is greater than or equal to level 6. Choose rainless weather to work, drive the single-arm gantry crane MQ5070 to the northernmost side of the dock, change the amplitude and stop it at the 60m position of the main hook 6, and clear the obstacles on the moving route; Step 2: Use the lifting beam 5 to lift the small balance beam to remove the driven trolley group, and keep the shoulder beam 1 in the original position. The lifting beam is used as a temporary lifting device to effectively improve work efficiency; Step 3: All eight driven trolleys of the four outriggers of the single-arm gantry crane are removed and secured with a shoulder pole beam 1. During the removal process, the small balance beam 8 and the middle balance beam 7 are fixed with angle steel spot welding; Step 4: Use the forklift and hand chain hoist to put the joist 3 horizontally into the bottom of the large balance beam 4. After the joist 3 is in place, rotate it 90 degrees and use the 5t hoist to put the joist 3 close to the bottom of the large balance beam 4, so that the axis car can be driven under the large flat beam for later operation. Step 5: Drive the axis car 2 into the bottom of the joist 3, and slowly lift the portal machine 50mm off the ground with eight points of force at the same time. Use a card plate to fix the position of the joist 3 and the axis car 2 on the outside, and check the axis pressure at each point to ensure that the force at each point is basically consistent. When the deviation is large, it is necessary to re-drop the portal machine, adjust the amplitude of the change to make the center of gravity position as much as possible, and place it at the rotation center. The axis car 2 is basically subjected to the same force, ensuring that the center position remains at the center position to prevent lateral displacement, and ensure continuous stability and strong stability during transportation; Step 6: After adjustment, rotate the anchor and lock it, cut off the main power supply, check and ensure that the main structure is well grounded, and remove the upper machine cable and fix it on the door base machine; Step 7: Slowly lift it up 100mm from the ground, move the MQ5070 gantry crane to the side track, and then use the shoulder beam 1 to install the driven trolley group on the track; Step 8: Move the MQ50100 gantry crane to the northernmost side of the dock and stop the boom at the 55m position of the main hook 6; Step 9: Use the lifting beam 5 to lift up the small balance beam 8 to remove the four driven trolley groups, and use the connecting angle steel to weld and fix the small balance beam 8 and the middle balance beam 7. The shoulder pole beam 1 remains in the original position, and the small balance beam and the middle balance beam are changed from a flexible connection to a rigid connection, so that the wheels can be prevented from being deformed during transportation; Step 10: Use a forklift and hand chain hoist to insert the joist 3 horizontally into the bottom of the large balance beam 4, rotate it 90 degrees after it is in place, and use the hoist to press the joist against the bottom of the large balance beam 4; Step 11: Drive the axis car 2 into the bottom of the joist 3, and slowly lift the portal machine 50mm off the ground under the force of eight points at the same time. Fix the position of the joist 3 and the axis car 2 with a card plate on the outside, and check the axis pressure at each point to ensure that the force at each point is basically consistent. When the deviation is large, it is necessary to re-drop the portal machine and adjust the amplitude to make the center of gravity position as much as possible, and place it at the rotation center, so that the force of the axis car is basically consistent; Step 12: After adjustment, rotate the anchor and lock it, cut off the main power supply, check and ensure that the main structure is well grounded, and remove the upper machine cable and fix it on the door base machine; Step 13: Drive the axis car 2 to the bottom of the joist 3, fix the joist 3 and the axis car 2 with a card plate on the outside, ensure that the four points are synchronously stressed, slowly lift the portal machine 100mm off the ground, move the MQ50100 portal machine to the east side of the 600t rigid leg, drop the rails, connect the upper machine cable and stop it at the anchor position; Step 14: Follow the original operation process to move MQ5070 back to the original track; Step 15: Touch up the paint and the machine relocation project is completed.
[0021] It should be understood by those skilled in the art that the embodiments of the present invention described above and shown in the accompanying drawings are only examples and do not limit the present invention, and the purpose of the present invention has been fully and effectively achieved. The functional and structural principles of the present invention have been demonstrated and explained in the embodiments, and the embodiments of the present invention may be deformed or modified in any way without departing from the principles.
Claims
1. A method for moving a portal machine using an axis vehicle, characterized in that: The following steps are involved: Step 1: Drive the single-arm gantry crane MQ5070 to the northernmost side of the dock, stop it at the 60m position of the main hook, and clear the obstacles on the moving route; Step 2: Use the lifting beam to lift the small balance beam and remove the driven trolley group, and keep the shoulder beam in its original position; Step 3: All eight driven trolleys on the four outriggers of the single-arm gantry crane are removed and secured with a shoulder pole beam; Step 4: Use the forklift and hand chain hoist to insert the joist horizontally into the bottom of the large balance beam; Step 5: Drive the axis car to the bottom of the joist, and slowly lift the door seat 50mm off the ground with eight points of force at the same time. Use a card plate on the outside to fix the position of the joist and the axis car, and check the axis pressure at each point to ensure that the force at each point is basically consistent; Step 6: After adjustment, rotate the anchor and lock it, cut off the main power supply, check and ensure that the main structure is well grounded, and remove the upper machine cable and fix it on the door base machine; Step 7: Slowly lift it up 100mm from the ground, move the MQ5070 gantry crane to the side track, and then use the shoulder pole beam to install the driven trolley group on the track; Step 8: Move the MQ50100 gantry crane to the northernmost side of the dock and stop the boom at the 55m position of the main hook; Step 9: Use the lifting beam to lift up the small balance beam and remove the driven trolley group at four locations, and weld the small balance beam and the middle balance beam with connecting angle steel, and keep the shoulder pole beam in its original position; Step 10: Use the forklift and hand chain hoist to insert the joist horizontally into the bottom of the large balance beam, rotate it 90 degrees after it is in place, and use the hoist to press the joist against the bottom of the large balance beam; Step 11: Drive the axis car to the bottom of the joist, and slowly lift the door seat 50mm off the ground with eight points of force at the same time. Use a card plate on the outside to fix the position of the joist and the axis car, and check the axis pressure at each point to ensure that the force at each point is basically consistent; Step 12: After adjustment, rotate the anchor and lock it, cut off the main power supply, check and ensure that the main structure is well grounded, and remove the upper machine cable and fix it on the door base machine; Step 13: Drive the axis car to the bottom of the joist, and fix the joist and the axis car with a clamp on the outside; Step 14: Follow the original operation process to move MQ5070 back to the original track; Step 15: Touch up the paint and the machine relocation project is completed.
2. A method for moving a portal machine using an axis vehicle according to claim 1, characterized in that: The working condition in step 1 is to pay attention to the weather conditions before moving the machine. It is strictly forbidden to carry out the moving work when the wind force is greater than or equal to level 6, and choose to work in rainless weather.
3. A method for moving a portal machine using an axis vehicle according to claim 1, characterized in that: During the dismantling process in step 3, the small balance beam and the middle balance beam are fixed by spot welding with angle steel.
4. A method for moving a portal machine using an axis vehicle according to claim 1, characterized in that: In step 4, the joist is rotated 90 degrees after it is in place, and a 5t hoist is used to hold the joist close to the bottom of the large balance beam.
5. The method for moving a portal machine using an axis vehicle according to claim 1, characterized in that: When the deviation is large in step 5, it is necessary to put the portal crane back on track and adjust the amplitude change to make the center of gravity as close to the rotation center as possible, so that the forces on the axis vehicles are basically the same.
6. The method for moving a portal machine using an axis vehicle according to claim 1, characterized in that: When the deviation is large in step 11, it is necessary to put the gantry crane back on track and adjust the amplitude change to make the center of gravity as close to the rotation center as possible, so that the forces on the axis vehicles are basically the same.
7. The method for moving a portal machine using an axis vehicle according to claim 1, characterized in that: In step 13, ensure that four points are synchronously stressed to slowly lift the gantry crane 100 mm off the ground, move the MQ50100 gantry crane to the east side of the 600t rigid leg, then lower the rails, connect the upper machine cable and stop it at the anchoring position.