Nitrogen pressure balance system testing method

By proofreading and status checking the components of the nitrogen pressure balance system, the measurement inaccurate and control logic errors caused by failure to proofread the components in the prior art are solved, the operating reliability and test efficiency of the system are improved, and the Cost and improve product quality.

CN118912389APending Publication Date: 2024-11-08JIANGNAN SHIPYARD (GRP) CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410948465.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing nitrogen pressure balance system has not been used to perform component calibration, resulting in inaccurate measurement and error in control logic, which may lead to excessive nitrogen pressure or negative pressure, damage to the main shield and secondary shield.

Method used

Provide a nitrogen pressure balance system testing method, including proofreading components, checking the setting status, manually controlling ventilation and converting it to automatic control, checking leakage conditions and confirming the timeliness of filling and deflation operations, ensuring the range calibration and opening of sensors and valves Correction.

Benefits of technology

Through component proofreading and status inspection, the operating reliability of the nitrogen pressure balance system is improved, the mooring test cycle is reduced, the test autonomy and controllability are enhanced, the cost is reduced, and the product quality is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912389A_ABST
    Figure CN118912389A_ABST
Patent Text Reader

Abstract

The invention provides a method for testing a nitrogen pressure balance system. The method comprises the following steps: calibrating components in the nitrogen pressure balance system; checking setting states of components in the nitrogen pressure balance system; nitrogen is introduced into the nitrogen pressure balance system in a manual control mode, and when the pressure in the nitrogen pressure balance system rises to a preset value, manual control ventilation is set to be automatic control ventilation; after the nitrogen pressure balance system is stopped being ventilated, the leakage condition of the pipeline is checked; and when the pressure in the nitrogen pressure balance system is abnormal, whether the inflation and deflation actions of the nitrogen pressure balance system are timely or not is confirmed. The test method can shorten the ship construction period and improve the operation reliability of the nitrogen pressure balance system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of ship testing and adjustment, and in particular to a nitrogen pressure balance system testing method. Background Art

[0002] As the International Convention for the Prevention of Pollution from Ships places increasingly stringent requirements on ship emissions, dual-fuel ships using LNG as clean power have come into being; primary shielding and secondary shielding, as important components of the LNG fuel tank containment system, play a vital role in shielding and monitoring the subsequent storage and transfer of LNG in the fuel tank.

[0003] The nitrogen injected into the primary and secondary shields of the fuel tank is replenished through a ship-specific nitrogen system; when the temperature of the fuel tank changes, the nitrogen pressure of the primary and secondary shields will change accordingly. In order to maintain the stability of the nitrogen pressure and prevent the deformation of the primary and secondary shields, the nitrogen pressure in the primary and secondary shields is maintained within a reasonable control range under the regulation of the nitrogen pressure balance system. In order to ensure the reliability of the operation of the nitrogen pressure balance system, it is necessary to test the nitrogen pressure balance system before it is put into use. Summary of the invention

[0004] The object of the present invention is to provide a nitrogen pressure balance system testing method for testing the nitrogen pressure balance system to improve the reliability of the operation of the nitrogen pressure balance system.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a nitrogen pressure balance system testing method, the steps of the nitrogen pressure balance system testing method comprising: calibrating components in the nitrogen pressure balance system; checking the setting status of components in the nitrogen pressure balance system; introducing nitrogen into the nitrogen pressure balance system in a manually controlled manner, and when the pressure in the nitrogen pressure balance system rises to a predetermined value, setting the manual control ventilation to automatic control ventilation; after stopping ventilation to the nitrogen pressure balance system, checking the leakage of the pipeline; when the pressure in the nitrogen pressure balance system is abnormal, confirming whether the charging and discharging actions of the nitrogen pressure balance system are timely.

[0006] Optionally, the components of the nitrogen pressure balance system include a main shielding inlet pressure sensor, a main shielding outlet pressure sensor, a secondary shielding inlet pressure sensor and a secondary shielding outlet pressure sensor, the main shielding inlet pressure sensor and the secondary shielding inlet pressure sensor are respectively used to monitor the pressure in the main shielding air inlet pipeline and the pressure in the secondary shielding air inlet pipeline, the secondary shielding inlet pressure sensor and the secondary shielding outlet pressure sensor are respectively used to monitor the pressure in the main shielding air outlet pipeline and the pressure in the secondary shielding air outlet pipeline, and the step of calibrating the components in the nitrogen pressure balance system includes: range calibration of the main shielding inlet pressure sensor, inputting the minimum current value for controlling the action of the main shielding inlet pressure sensor into the main shielding inlet pressure sensor, and checking whether the main shielding inlet pressure sensor displays the minimum value of the range, then inputting the maximum current value for controlling the action of the main shielding inlet pressure sensor, and checking whether the main shielding inlet pressure sensor displays the maximum value of the range, and correcting the range of the main shielding inlet pressure sensor based on the result; repeating the above actions to calibrate the range of the main shielding outlet pressure sensor, the secondary shielding inlet pressure sensor and the secondary shielding outlet pressure sensor.

[0007] Optionally, the components of the nitrogen pressure balance system include a main shielding inlet valve, a secondary shielding inlet valve, a main shielding outlet valve and a secondary shielding outlet valve, the main shielding inlet valve and the secondary shielding inlet valve are respectively used to control the on-off of the main shielding air inlet pipeline and the on-off of the secondary shielding air inlet pipeline, the main shielding outlet valve and the secondary shielding outlet valve are respectively used to control the on-off of the main shielding air outlet pipeline and the on-off of the secondary shielding air outlet pipeline, and the step of calibrating the components in the nitrogen pressure balance system also includes: introducing air into the main shielding inlet valve to test whether it opens smoothly; inputting the minimum current value for controlling the action of the main shielding inlet valve into the main shielding inlet valve, and checking whether the actual opening of the main shielding inlet valve is the minimum; inputting the maximum current value for controlling the action of the main shielding inlet valve into the main shielding inlet valve, and checking whether the actual opening of the main shielding inlet valve is the maximum; calibrating the main shielding inlet valve based on the result; repeating the above actions to test the secondary shielding inlet valve, the main shielding outlet valve and the secondary shielding outlet valve.

[0008] Optionally, the components of the nitrogen pressure balance system include a main shielding safety valve and a secondary shielding safety valve, the main shielding safety valve is used to control the on-off of the pipeline connected in parallel with the main shielding air outlet pipeline, and the secondary shielding safety valve is used to control the on-off of the pipeline connected in parallel with the secondary shielding air outlet pipeline. The step of calibrating the components in the nitrogen pressure balance system also includes: immersing the main shielding safety valve in water, ventilating the main shielding safety valve, and manually adjusting the inlet pressure of the main shielding safety valve so that the pressure reaches the starting pressure value of the main shielding safety valve, and observing the bubbles in the water; repeating the above actions to test the secondary shielding safety valve.

[0009] Optionally, the step of checking the setting status of components in the nitrogen pressure balance system is: checking the setting status of the main shielding inlet valve and the secondary shielding inlet valve and adjusting the main shielding inlet valve and the secondary shielding inlet valve to the closed state in manual mode; checking the setting status of the main shielding outlet valve and the secondary shielding outlet valve and adjusting the main shielding outlet valve and the secondary shielding outlet valve to the closed state in automatic mode.

[0010] Optionally, the step of manually controlling the introduction of nitrogen into the nitrogen pressure balance system and setting the manually controlled ventilation to automatically controlled ventilation when the pressure in the nitrogen pressure balance system rises to a predetermined value is as follows: manually opening the main shielding inlet valve and the secondary shielding inlet valve to a preset opening, and respectively passing nitrogen to the main shielding and the secondary shielding through the main shielding inlet valve and the secondary shielding inlet valve; when the pressure in the main shielding and the secondary shielding reaches a predetermined value, adjusting the main shielding inlet valve and the secondary shielding inlet valve to the automatic mode and continuing the ventilation action.

[0011] Optionally, the nitrogen pressure balance system includes a main pipe flow valve, which is used to monitor the flow of nitrogen input into the main shield air inlet pipeline and the secondary shield air inlet pipeline. After stopping ventilation to the nitrogen pressure balance system, the step of checking the pipeline for leakage is: when the pressure in the main shield and the secondary shield reaches the working pressure value, the main shield inlet valve and the secondary shield inlet valve are automatically closed, and the condition of the main pipe flow valve is observed.

[0012] Optionally, when the pressure in the nitrogen pressure balance system is abnormal, the step of confirming whether the charging and discharging actions of the nitrogen pressure balance system are timely is: when low pressure appears in the nitrogen pressure balance system, based on the difference between the actual pressure value and the working pressure value in the nitrogen pressure balance system, the switching rates of the main shielding inlet valve and the secondary shielding inlet valve are controlled; when a high pressure alarm appears in the nitrogen pressure balance system, based on the difference between the actual pressure value and the working pressure value in the nitrogen pressure balance system, the switching rates of the main shielding outlet valve and the secondary shielding outlet valve are controlled.

[0013] As described above, the nitrogen pressure balance system test method of the present invention has the following beneficial effects: the entire debugging cycle can be moved forward to the platform test stage through this method, shortening the mooring test cycle. The autonomy, controllability and maneuverability of the test are enhanced; the cost is reduced and the product quality is improved; there will be no large amount of waste of materials, and the one-time inspection pass rate is greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 Shown is a schematic diagram of a nitrogen pressure balance system in an embodiment of the present invention.

[0015] Component number description

[0016] 10 Nitrogen system

[0017] 20 Main Shield

[0018] 30 shields

[0019] 40 Breathable mast

[0020] 50 Main flow valve

[0021] 60 Main shield inlet valve

[0022] 61 times shield inlet valve

[0023] 62 Main Shield Inlet Pressure Sensor

[0024] 63 times shielded inlet pressure sensor

[0025] 70 Main Shield Outlet Pressure Sensor

[0026] 71 times Shield outlet pressure sensor

[0027] 72 Main shield outlet valve

[0028] 73 times shield outlet valve

[0029] 80 Main shielding safety valve

[0030] 81 times shielding safety valve

[0031] 90 Differential Pressure Valve DETAILED DESCRIPTION

[0032] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0033] For example, when describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0034] For ease of description, spatial relational terms such as "under", "below", "below", "below", "above", "on", etc. may be used herein to describe the relationship of one element or feature shown in the drawings to other elements or features. It will be understood that these spatial relational terms are intended to include other directions of the device in use or operation in addition to the directions depicted in the drawings. In addition, when a layer is referred to as being "between" two layers, it can be the only layer between the two layers, or there can be one or more intervening layers. As used herein, "between..." means including the end point values.

[0035] In the context of the present application, a structure in which a first feature is described as being "above" a second feature may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features are formed between the first and second features, such that the first and second features may not be in direct contact.

[0036] It should be noted that the illustrations provided in this embodiment are only used to illustrate the basic concept of the present invention in a schematic manner, and therefore the illustrations only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout may also be more complicated.

[0037] like Figure 1As shown, this embodiment provides a nitrogen pressure balance system, which includes a nitrogen system 10, a primary shield 20, a secondary shield 30, a vent mast 40 and components, and the components include a main pipe flow valve 50, a primary shield inlet valve 60, a secondary shield inlet valve 61, a primary shield inlet pressure sensor 62, a secondary shield inlet pressure sensor 63, a primary shield outlet pressure sensor 70, a secondary shield outlet pressure sensor 71, a primary shield outlet valve 72, a secondary shield outlet valve 73, a primary shield safety valve 80, a secondary shield safety valve 81 and a differential pressure valve 90. The main pipe flow valve 50 is installed on the main pipe of the nitrogen system 10 outlet, and the main pipe of the nitrogen system 10 outlet is divided into two pipelines for respectively inletting air to the primary shield 20 and the secondary shield 30, the main shield inlet valve 60 and the main shield inlet pressure sensor 62 are installed on the air inlet pipeline of the primary shield 20, and the secondary shield inlet valve 61 and the secondary shield inlet pressure sensor 63 are installed on the air inlet pipeline of the secondary shield 30. The main shield 20 air outlet pipeline and the secondary shield 30 air outlet pipeline are both connected to the ventilation mast 40, the main shield outlet pressure sensor 70 and the main shield outlet valve 72 are installed on the main shield 20 air outlet pipeline, the secondary shield outlet pressure sensor 71 and the secondary shield outlet valve 73 are installed on the secondary shield 30 air outlet pipeline, the main shield safety valve 80 is installed on the pipeline parallel to the main shield 20 air outlet pipeline, and the pipeline is connected to the ventilation mast 40, the secondary shield safety valve 81 is installed on the pipeline parallel to the secondary shield 30 air outlet pipeline, and the pipeline is connected to the ventilation mast 40. The differential pressure valve 90 is used to detect the pressure difference between the main shield 20 air outlet pipeline and the secondary shield 30 air outlet pipeline. It should be noted that the actions of the above components can be controlled by the PLC system.

[0038] In order to ensure the reliability of the operation of the nitrogen pressure balance system, the nitrogen pressure balance system needs to be tested before it is put into use. In the current testing method, the components are usually not calibrated and used directly, which leads to inaccurate measurement of the components during use, and then there are problems such as control logic errors or unreasonable adjustment methods of the nitrogen pressure balance system, resulting in excessive nitrogen pressure or negative pressure, which damages the main shield 20 and the secondary shield 30. Through the study of the principle of the nitrogen pressure balance system, this embodiment provides a nitrogen pressure balance system testing method, and the steps of the nitrogen pressure balance system testing method include:

[0039] Calibrate the components in the nitrogen pressure balance system;

[0040] Check the setting status of components in the nitrogen pressure balance system;

[0041] nitrogen is introduced into the nitrogen pressure balance system in a manually controlled manner, and when the pressure in the nitrogen pressure balance system rises to a predetermined value, the manual control ventilation is set to automatic control ventilation;

[0042] After stopping ventilation to the nitrogen pressure balance system, check for leaks in the pipeline;

[0043] When the pressure in the nitrogen pressure balance system is abnormal, confirm whether the charging and discharging actions of the nitrogen pressure balance system are timely.

[0044] Specifically, the components are calibrated before testing the nitrogen pressure balance system, for example, to ensure that the actual ranges of various sensors and valves are accurately consistent with the calibrated ranges to ensure the measurement accuracy of the above components, thereby avoiding the problem of untimely action of the nitrogen pressure balance system due to inaccurate measurement accuracy. When the nitrogen pressure balance system does not act in time, it will cause excessive nitrogen pressure in the main shield 20 and the secondary shield 30 or negative pressure.

[0045] When the component calibration is completed, check the setting status of the components, and then set the components to the correct status so that the nitrogen pressure balance system can operate smoothly.

[0046] When the operation of the nitrogen pressure balance system is tested, ventilation is first performed in a manual control mode, and then the pressure in the nitrogen pressure balance system is switched to automatic control after reaching a certain value. By doing so, it can be ensured that the primary shield 20 and the secondary shield 30 will not be inflated at an excessively fast ventilation speed during the ventilation process, which is beneficial to avoid excessive pressure in the primary shield 20 and the secondary shield 30 due to excessive inflation.

[0047] During the test of the nitrogen pressure balance system, if the pressure is too high, the nitrogen pressure balance system needs to be vented to reduce the pressure. If the components move slowly during venting, the pressure of the main shield 20 and the secondary shield 30 in the nitrogen pressure balance system cannot be reduced in time, resulting in damage to the main shield 20 and the secondary shield 30. Similarly, if the pressure is too low and the inflation speed of the components is slow, the pressure in the main shield 20 and the secondary shield 30 cannot be increased in time and damaged. The above problems can be solved by testing and adjusting the rate of inflation and deflation.

[0048] The steps for calibrating the components in the nitrogen pressure balance system include:

[0049] Range calibration of the main shielding inlet pressure sensor 62: input the minimum current value for controlling the operation of the main shielding inlet pressure sensor 62 to the main shielding inlet pressure sensor 62, and check whether the main shielding inlet pressure sensor 62 displays the minimum value of the range; then input the maximum current value for controlling the operation of the main shielding inlet pressure sensor 62, and check whether the main shielding inlet pressure sensor 62 displays the maximum value of the range; based on the result, calibrate the range of the main shielding inlet pressure sensor 62;

[0050] Repeat the above steps to calibrate the measuring ranges of the primary shield outlet pressure sensor 70 , the secondary shield inlet pressure sensor 63 and the secondary shield outlet pressure sensor 71 .

[0051] Specifically, in this embodiment, the current range for controlling the operation of the above-mentioned sensor is 4mA-20mA. When calibrating the range of the main shielding inlet pressure sensor 62, first find the range corresponding to the main shielding inlet pressure sensor 62 in the signal simulator, select and confirm it, and then input a 4mA current value to the main shielding inlet pressure sensor 62 through the signal simulator. At this time, the value of the main shielding inlet pressure sensor 62 should be displayed as 0mbar. Then input a 20mA current value to the main shielding inlet pressure sensor 62. At this time, the value of the main shielding inlet pressure sensor 62 should be displayed as the maximum range. If the test range of the main shielding inlet pressure sensor 62 is correct, the calibration is completed. Otherwise, the main shielding inlet pressure sensor 62 is recalibrated. Similarly, the same operation is used to calibrate the ranges of the main shielding outlet pressure sensor 70, the secondary shielding inlet pressure sensor 63 and the secondary shielding outlet pressure sensor 71. In this way, the accuracy of the above-mentioned sensors can be guaranteed through the above-mentioned operations.

[0052] The steps for calibrating the components in the nitrogen pressure balance system also include:

[0053] Pass air into the main shield inlet valve 60 to test whether it opens smoothly;

[0054] Inputting a minimum current value for controlling the operation of the main shielding inlet valve 60 to the main shielding inlet valve 60, and checking whether the actual opening of the main shielding inlet valve 60 is the minimum;

[0055] Inputting a maximum current value for controlling the operation of the main shielding inlet valve 60 to the main shielding inlet valve 60, and checking whether the actual opening of the main shielding inlet valve 60 is at a maximum;

[0056] Correct the main shield inlet valve 60 based on the results;

[0057] Repeat the above actions to test the secondary shielding inlet valve 61, the main shielding outlet valve 72 and the secondary shielding outlet valve 73.

[0058] Specifically, the main shielding inlet valve 60, the secondary shielding inlet valve 61, the main shielding outlet valve 72 and the secondary shielding outlet valve 73 of the present embodiment are all pneumatic valves. In order to protect the valves from being damaged, the main shielding inlet valve 60, the secondary shielding inlet valve 61, the main shielding outlet valve 72 and the secondary shielding outlet valve 73 are all provided with pressure regulators. The pressure regulators adjust the ventilation pressure to a range that meets the requirements of the above-mentioned valves.

[0059] For example, when testing the main shielding inlet valve 60, first adjust the main shielding inlet valve 60 to the test state, then input a 4mA current value to the main shielding inlet valve 60, at which time the opening of the main shielding inlet valve 60 should be 0, then input a 20mA current value to the main shielding inlet valve 60, at which time the opening of the main shielding inlet valve 60 should be 100%, if the actual opening of the test does not meet the above situation, calibrate the main shielding inlet valve 60. Similarly, test the secondary shielding inlet valve 61, the main shielding outlet valve 72 and the secondary shielding outlet valve 73.

[0060] The steps for calibrating the components in the nitrogen pressure balance system also include:

[0061] Immerse the main shielding safety valve 80 in water, ventilate the main shielding safety valve 80, and manually adjust the inlet pressure of the main shielding safety valve 80 to make the pressure reach the tripping pressure value of the main shielding safety valve 80, and observe the bubbles in the water;

[0062] Repeat the above steps to test the secondary shielding safety valve 81 .

[0063] Specifically, the starting value of the main shielding safety valve 80 is 30 bar, and the starting value of the secondary shielding safety valve 81 is 35 bar. During the test, the main shielding safety valve 80 and the secondary shielding safety valve 81 are connected to the safety valve tester respectively, and then the pressure is adjusted to test whether the starting values ​​of the main shielding safety valve 80 and the secondary shielding safety valve 81 are consistent with the calibration value. After the test is completed, the reset operation is performed.

[0064] By calibrating the measuring range of the above-mentioned sensors and valves, the accuracy of using the above-mentioned sensors and valves can be improved, thereby ensuring that the nitrogen pressure balance system adjusts the pressure of the internal main shield 20 and the secondary shield 30 in time.

[0065] After the calibration of components is completed, the nitrogen pressure balance system is tested under dynamic conditions. The steps for checking the setting status of components in the nitrogen pressure balance system are: checking the setting status of the main shielding inlet valve 60 and the secondary shielding inlet valve 61 and adjusting the main shielding inlet valve 60 and the secondary shielding inlet valve 61 to the closed state in the manual mode; checking the setting status of the main shielding outlet valve 72 and the secondary shielding outlet valve 73 and adjusting the main shielding outlet valve 72 and the secondary shielding outlet valve 73 to the closed state in the automatic mode.

[0066] Nitrogen is introduced into the nitrogen pressure balance system in a manually controlled manner, and when the pressure in the nitrogen pressure balance system rises to a predetermined value, the steps of setting the manually controlled ventilation to automatically controlled ventilation are as follows: manually open the main shielding inlet valve 60 and the secondary shielding inlet valve 61 to a preset opening, and pass nitrogen to the main shield 20 and the secondary shield 30 through the main shielding inlet valve 60 and the secondary shielding inlet valve 61 respectively; when the pressure in the main shield 20 and the secondary shield 30 reaches a predetermined value, adjust the main shielding inlet valve 60 and the secondary shielding inlet valve 61 to the automatic mode and continue the ventilation action.

[0067] Specifically, in this embodiment, the opening of the main shield inlet valve 60 and the secondary shield inlet valve 61 is manually opened to 20%, so that nitrogen slowly enters the main shield 20 and the secondary shield 30, wherein the nitrogen pressure range of the main shield 20 is: 5mbar-10mbar; the nitrogen pressure range of the secondary shield 30 is: 2mbar-7mbar. When the nitrogen pressure of the main shield 20 reaches 5mbar and the nitrogen pressure of the secondary shield 30 reaches 2mbar, the main shield inlet valve 60 and the secondary shield inlet valve 61 are set to automatic mode, and when the pressure in the main shield 20 and the secondary shield 30 reaches the working pressure value, the main shield inlet valve 60 and the secondary shield inlet valve 61 are automatically closed.

[0068] At the beginning of the inflation stage, since the main shielding inlet valve 60 and the secondary shielding inlet valve 61 are not fully opened, nitrogen can enter the main shielding 20 and the secondary shielding 30 at a slower speed, avoiding too fast inflation; if the main shielding inlet valve 60 and the secondary shielding inlet valve 61 are directly set to automatic mode, when the inflation starts, the main shielding inlet valve 60 and the secondary shielding inlet valve 61 will automatically open the opening to 100%, so the inflation speed is too fast. Since the action of the main shielding inlet valve 60 and the secondary shielding inlet valve 61 has a hysteresis, when the pressure in the main shielding 20 and the secondary shielding 30 reaches the working pressure value, there will be a situation where the main shielding 20 and the secondary shielding 30 continue to be inflated, so it is easy to make the pressure in the main shielding 20 and the secondary shielding 30 too high, thereby causing damage to the main shielding 20 and the secondary shielding 30.

[0069] After stopping ventilation to the nitrogen pressure balance system, the steps for checking the leakage of the pipeline are as follows: when the pressure in the main shield 20 and the secondary shield 30 reaches the working pressure value, the main shield inlet valve 60 and the secondary shield inlet valve 61 are automatically closed, and the condition of the main pipe flow valve 50 is observed.

[0070] Specifically, observe whether the value of the main pipe flow valve 50 is 0. If it is not 0, it is necessary to check whether there is leakage in the pipeline.

[0071] When the pressure in the nitrogen pressure balance system is abnormal, the steps to confirm whether the charging and discharging actions of the nitrogen pressure balance system are timely are as follows:

[0072] When low pressure occurs in the nitrogen pressure balance system, the switching rates of the main shielding inlet valve 60 and the secondary shielding inlet valve 61 are controlled based on the difference between the actual pressure value and the working pressure value in the nitrogen pressure balance system;

[0073] When a high pressure alarm occurs in the nitrogen pressure balance system, the switching rates of the main shielding outlet valve 72 and the secondary shielding outlet valve 73 are controlled based on the difference between the actual pressure value and the working pressure value in the nitrogen pressure balance system.

[0074] Specifically, when the main shield inlet pressure sensor 62 and the main shield outlet pressure sensor 70 in the nitrogen pressure balance system detect that the pressure in the main shield 20 is too low, and the secondary shield inlet pressure sensor 63 and the secondary shield outlet pressure sensor 71 detect that the pressure in the secondary shield 30 is too low, if the difference between the actual pressure value in the main shield 20 and its working pressure value is too large, the main shield inlet valve 60 needs to be opened quickly to quickly replenish nitrogen to the main shield 20; if the difference between the actual pressure value in the main shield 20 and its working pressure value is not large, the main shield inlet valve 60 can be slowly opened to replenish gas. The working process of the secondary shield inlet valve 61 is the same as the above process.

[0075] When the main shield inlet pressure sensor 62 and the main shield outlet pressure sensor 70 in the nitrogen pressure balance system detect that the pressure in the main shield 20 is too high, and the secondary shield inlet pressure sensor 63 and the secondary shield outlet pressure sensor 71 detect that the pressure in the secondary shield 30 is too high, if the difference between the actual pressure value in the main shield 20 and its working pressure value is too large, it is necessary to quickly open the main shield outlet valve 72 to quickly discharge the nitrogen to the ventilation mast 40; if the difference between the actual pressure value in the main shield 20 and its working pressure value is not large, the main shield inlet valve 60 can be slowly opened to discharge the nitrogen to the ventilation mast 40. The working process of the secondary shield outlet valve 73 is the same as the above process. Among them, whether the difference between the actual pressure value in the main shield 20 and its working pressure value is too large can be set according to the actual situation, and whether the difference between the actual pressure value in the secondary shield 30 and its working pressure value is too large can be set according to the actual situation.

[0076] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A nitrogen pressure balance system testing method, characterized in that: The steps of the nitrogen pressure balance system testing method include: Calibrate the components in the nitrogen pressure balance system; Check the setting status of components in the nitrogen pressure balance system; nitrogen is introduced into the nitrogen pressure balance system in a manually controlled manner, and when the pressure in the nitrogen pressure balance system rises to a predetermined value, the manual control ventilation is set to automatic control ventilation; After stopping ventilation to the nitrogen pressure balance system, check for leaks in the pipeline; When the pressure in the nitrogen pressure balance system is abnormal, confirm whether the charging and discharging actions of the nitrogen pressure balance system are timely.

2. The nitrogen pressure balance system testing method according to claim 1, characterized in that: The components of the nitrogen pressure balance system include a main shield inlet pressure sensor, a main shield outlet pressure sensor, a secondary shield inlet pressure sensor and a secondary shield outlet pressure sensor. The main shield inlet pressure sensor and the secondary shield inlet pressure sensor are used to monitor the pressure in the main shield inlet pipeline and the pressure in the secondary shield inlet pipeline respectively. The secondary shield inlet pressure sensor and the secondary shield outlet pressure sensor are used to monitor the pressure in the main shield outlet pipeline and the pressure in the secondary shield outlet pipeline respectively. The step of calibrating the components in the nitrogen pressure balance system includes: Range calibration of the main shielding inlet pressure sensor: input the minimum current value for controlling the action of the main shielding inlet pressure sensor into the main shielding inlet pressure sensor, and check whether the main shielding inlet pressure sensor displays the minimum value of the range; then input the maximum current value for controlling the action of the main shielding inlet pressure sensor, and check whether the main shielding inlet pressure sensor displays the maximum value of the range; based on the results, calibrate the range of the main shielding inlet pressure sensor; Repeat the above steps to calibrate the ranges of the primary shield outlet pressure sensor, the secondary shield inlet pressure sensor, and the secondary shield outlet pressure sensor.

3. The nitrogen pressure balance system testing method according to claim 1, characterized in that: The components of the nitrogen pressure balance system include a main shielding inlet valve, a secondary shielding inlet valve, a main shielding outlet valve and a secondary shielding outlet valve, the main shielding inlet valve and the secondary shielding inlet valve are respectively used to control the on-off of the main shielding inlet pipeline and the on-off of the secondary shielding inlet pipeline, the main shielding outlet valve and the secondary shielding outlet valve are respectively used to control the on-off of the main shielding outlet pipeline and the on-off of the secondary shielding outlet pipeline, and the step of calibrating the components in the nitrogen pressure balance system also includes: Pass air into the main shield inlet valve to test whether it opens smoothly; Input the minimum current value for controlling the operation of the main shield inlet valve to the main shield inlet valve, and check whether the actual opening of the main shield inlet valve is the minimum; Input the maximum current value for controlling the action of the main shield inlet valve to the main shield inlet valve, and check whether the actual opening of the main shield inlet valve is at the maximum; calibrate the main shield inlet valve based on the results; Repeat the above steps to test the secondary shield inlet valve, primary shield outlet valve and secondary shield outlet valve.

4. The nitrogen pressure balance system testing method according to claim 1, characterized in that: The components of the nitrogen pressure balance system include a main shielding safety valve and a secondary shielding safety valve, the main shielding safety valve is used to control the on-off of the pipeline connected in parallel with the main shielding outlet pipeline, and the secondary shielding safety valve is used to control the on-off of the pipeline connected in parallel with the secondary shielding outlet pipeline. The step of calibrating the components in the nitrogen pressure balance system also includes: Immerse the main shielding safety valve in water, ventilate the main shielding safety valve, and manually adjust the inlet pressure of the main shielding safety valve to make the pressure reach the tripping pressure value of the main shielding safety valve, and observe the bubbles in the water; Repeat the above steps to test the secondary shielding safety valve.

5. The nitrogen pressure balance system testing method according to claim 3, characterized in that: The steps of checking the setting status of components in the nitrogen pressure balance system are: checking the setting status of the main shielding inlet valve and the secondary shielding inlet valve and adjusting the main shielding inlet valve and the secondary shielding inlet valve to the closed state in the manual mode; checking the setting status of the main shielding outlet valve and the secondary shielding outlet valve and adjusting the main shielding outlet valve and the secondary shielding outlet valve to the closed state in the automatic mode.

6. The nitrogen pressure balance system testing method according to claim 5, characterized in that: The steps of manually introducing nitrogen into the nitrogen pressure balance system and setting the manual control ventilation to automatic control ventilation when the pressure in the nitrogen pressure balance system rises to a predetermined value are as follows: manually opening the main shielding inlet valve and the secondary shielding inlet valve to a preset opening, and passing nitrogen to the main shielding and the secondary shielding through the main shielding inlet valve and the secondary shielding inlet valve respectively, and when the pressure in the main shielding and the secondary shielding reaches a predetermined value, adjusting the main shielding inlet valve and the secondary shielding inlet valve to the automatic mode and continuing the ventilation action.

7. The nitrogen pressure balance system testing method according to claim 1, characterized in that: The nitrogen pressure balance system includes a main pipe flow valve, which is used to monitor the flow of nitrogen input into the main shield air inlet pipeline and the secondary shield air inlet pipeline. After stopping ventilation to the nitrogen pressure balance system, the step of checking the leakage of the pipeline is as follows: when the pressure in the main shield and the secondary shield reaches the working pressure value, the main shield inlet valve and the secondary shield inlet valve are automatically closed, and the condition of the main pipe flow valve is observed.

8. The nitrogen pressure balance system testing method according to claim 3, characterized in that: When the pressure in the nitrogen pressure balance system is abnormal, the steps for confirming whether the charging and discharging actions of the nitrogen pressure balance system are timely are: When low pressure appears in the nitrogen pressure balance system, the switching rate of the main shielding inlet valve and the secondary shielding inlet valve is controlled based on the difference between the actual pressure value and the working pressure value in the nitrogen pressure balance system; When a high pressure alarm occurs in the nitrogen pressure balance system, the switching rates of the main shield outlet valve and the secondary shield outlet valve are controlled based on the difference between the actual pressure value and the working pressure value in the nitrogen pressure balance system.

Citation Information

Patent Citations

  • LNG ship and film type enclosure system thereof

    CN112498582A

  • Valve control method and device for nuclear power station, equipment and storage medium

    CN113220039A

  • Measurement, display and calibration method for internal pressure of battery

    CN116558712A

  • Safety valve take-off detection device

    CN209802649U

  • Secondary shielding pressure control system of LNG transport ship

    CN211040465U