ZVS four-switch Buck-Boost converter predictive control strategy based on node current
By adjusting the control timing and inductor current prediction, the control process of the four-switch Buck-Boost converter is simplified, its stability and dynamic performance are improved, the problems of high control complexity and insufficient dynamic performance in the prior art are solved, and fast steady-state response is achieved.
Patent Information
- Application Number
- CN202410601373.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2024-11-08
AI Technical Summary
The existing control strategy of the four-switch Buck-Boost converter does not make full use of the control timing within a single cycle, resulting in high complexity and insufficient dynamic performance, especially in the inability to quickly stabilize when the load or input voltage changes.
A predictive control strategy for a ZVS four-switch Buck-Boost converter based on node current is proposed. By adjusting the control timing and sampling and predicting the inductor current in a single switching cycle, the duty cycle and time of each stage are calculated to achieve steady-state control.
It simplifies the complexity of the control system, improves the efficiency and dynamic performance of the converter, and can quickly respond to changes in load or input voltage, avoiding subharmonic oscillations and current/voltage overshoot.
Smart Images

Figure CN118920863A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of power converter control, and in particular relates to a predictive control strategy of a ZVS four-switch Buck-Boost converter based on node current. Background Art
[0002] In applications where the output voltage is within the input voltage range, a DC-DC converter with boost and buck capabilities is usually used. The basic converters with this capability include Buck-Boost, Cuk, Zeta and SEPIC. The input and output voltage polarities of Buck-Boost and Cuk converters are opposite, and the voltage stress of the switch tube is high; while Zeta and SEPIC converters output positive voltages, but require more passive devices, which is not conducive to improving the power density of the converter, and also have the problem of high voltage stress of the switch tube. By replacing all the diodes of the two-tube Buck-Boost converter with controllable switch tubes, a four-switch Buck-Boost converter is obtained. The output voltage of this converter is positive, the voltage stress is small, and the passive components are few. It has been widely used in distributed power supplies, electric vehicles, photovoltaic power supplies and other fields. The four-switch Buck-Boost converter working in the quadrilateral inductor current working mode can realize the soft switching of the four switch tubes and improve the efficiency of the converter. According to whether there is a freewheeling stage T4, the operation mode of the four-switch Buck-Boost converter with quadrilateral inductor current modulation is divided into pseudo discontinuous current mode (Pseudo Discontinuous Current Mode, PDCM) and pseudo critical current mode (Pseudo Critical Continuous Current Mode, PCRM). At present, for the control strategy of the four-switch Buck-Boost converter with quadrilateral inductor current modulation, the control timing in a single cycle is controlled according to the mode corresponding to T1, T2, T3, and T4. Based on this control timing, in PCRM mode, -I ZVS Only one of the two judgment conditions, comparison and end of the switching cycle, can be used, which cannot be fully utilized. Therefore, the present invention proposes a node current prediction control strategy that adopts a new control timing and has higher dynamic performance and stability. The present invention simplifies the calculation process of each mode duty cycle in a single cycle of a four-switch Buck-Boost circuit by adjusting the control timing in the switching cycle, and proposes a node current-based ZVS four-switch Buck-Boost converter prediction control strategy, which has strong stability, can achieve rapid follow-up of load changes, and improve the dynamic performance of the converter. Summary of the invention
[0003] Based on the problems existing in the prior art, the purpose of the present invention is to provide a simple, stable and highly dynamic performance node current-based ZVS four-switch Buck-Boost converter predictive control strategy. The main idea is to propose a new control timing within a single control switching cycle, sample and predict the inductor current, judge the working state of the converter, calculate the duty cycle and time of each stage within a single switching cycle, control the on or off of the switch tube, and make the converter quickly reach a steady state.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A predictive control strategy for a ZVS four-switch Buck-Boost converter based on node current is proposed. The four-switch Buck-Boost circuit consists of an inductor and four switch tubes, wherein the four switch tubes are Q1, Q2, Q3, and Q4, respectively. Q1 and Q2 form a left bridge arm, and Q3 and Q4 form a right bridge arm. The two bridge arms are connected to a common ground. The two ends of the inductor are connected to the midpoints of the two bridge arms, respectively. The two switch tubes in the same bridge arm are complementary turned on, i.e., Q1 and Q2 are complementary turned on, and Q3 and Q4 are complementary turned on. The two switch tubes on the bridge arm need to set a dead time t d .
[0006] Preferably, the four-switch Buck-Boost circuit operates as follows: in the T1 time period, Q1 and Q4 are turned on, and Q2 and Q3 are turned off; in the T2 time period, Q1 and Q3 are turned on, and Q2 and Q4 are turned off; in the T3 time period, Q2 and Q3 are turned on, and Q1 and Q4 are turned off; in the T4 time period, Q2 and Q4 are turned on, and Q1 and Q3 are turned off. When the four-switch Buck-Boost converter operates in the PDCM mode, the working stages in a single control switch cycle are T3, T4, T1, and T2; when the four-switch Buck-Boost converter operates in the PCRM mode, the working stages in a single switch cycle are T3, T1, and T2. The node where the inductor current transitions from the T1 stage to the T2 stage is point P, and the node where the inductor current transitions from the T2 stage to the T3 stage is point Q.
[0007] Preferably, the control timing of the four-switch Buck-Boost circuit in a single control cycle is T3, T4, T1, and T2. After sampling the initial value of the inductor current switching cycle, i.e., the current value at point Q, the input voltage, and the output voltage, the controller calculates the time of each stage in a single switching cycle of the circuit, and then controls the switching action of the switch tube so that the circuit enters a steady state.
[0008] The specific steps of implementing the control method are as follows:
[0009] Step 1: According to the rated input voltage V in With rated output voltage V o, calculate the minimum soft switching current I ZVS , the specific calculation formula is:
[0010] I ZVS =2C oss ·max{V in ,V o} / t d
[0011] In the formula, C oss is the parasitic capacitance of the switch tube, t d is the dead time;
[0012] Step 2: Sample input voltage v in With output voltage v o , judge the working state of the circuit step-up and step-down, the judgment method is:
[0013] When v in <v o When , the four-switch Buck-Boost converter works in the boost state;
[0014] When v in ≥v o When , the four-switch Buck-Boost converter works in the step-down state;
[0015] Step 3: Use the sampled input voltage v in With output voltage v o , calculate the critical node current value I P_b and I P_Io_max , where I P_b is the corresponding value of the inductor current at point P when the converter operates at the interface between PDCM and PCRM modes, I P_Io_max is the corresponding value of the inductor current at point P at the maximum power point. The specific calculation formula is:
[0016]
[0017]
[0018] Where, T s is the switching period, L is the inductance value;
[0019] Step 4: The sampled output voltage v o With a given output voltage reference value V o_ref By comparison, the error signal is input into the PI compensator to obtain the P node inductor current reference signal I PI , and through the limiting link I PI Limited to 0 and I P_Io_max between;
[0020] Step 5: Set the P node inductor current reference signal I PI and critical current value I P_b Compare and judge the converter working mode. The judgment method is:
[0021] When I PI <I P_b When , the converter works in PDCM mode;
[0022] When I PI ≥I P_b When , the converter works in PCRM mode;
[0023] Step 6: Sample input voltage v in 、Output voltage v o and the initial value of the inductor current during the switching cycle, i.e., the current value at point Q L_Q , according to the working mode of the circuit, calculate the duty ratios d3, d4, d1, and d2 corresponding to the time periods T3, T4, T1, and T2 in a single switching cycle; the specific calculation formulas under various working modes are:
[0024] When the circuit works in PDCM boost mode:
[0025]
[0026] When the circuit works in PDCM buck mode:
[0027]
[0028] When the circuit works in PCRM mode:
[0029]
[0030] Step 7: Calculate the actual time T3, T4, T1, T2 of each stage in a single switching cycle through the duty cycle d3, d4, d1, d2. The specific formula is:
[0031]
[0032]
[0033]
[0034] T2=T s -T1-T3-T4
[0035] Step 8: Control the switching actions of the switch tubes Q3, Q4, Q1, and Q2 according to the actual times T3, T4, T1, and T2 of the four stages in a single switching cycle;
[0036] Step 9: Repeat the above steps 2 to 8 to complete the switching cycle.
[0037] Preferably, by adopting the above strategy, the converter can be stable when working in the boost mode, and the stability condition when the converter works in the buck mode is V o <V in <2V o .
[0038] Preferably, the strategy can be used to calculate the value I corresponding to the maximum power point inductor current P in step 3. P_Io_max The linear fitting formula is:
[0039] I P_Io_max =av in +bv o +c
[0040] Where a, b, and c are constants and can be determined based on the parameters of the converter.
[0041] Compared with the prior art, the present invention has the following beneficial effects:
[0042] 1. The present invention proposes a new control timing for a ZVS four-switch Buck-Boost converter within a control switching cycle, taking the turn-off moment of Q1 as the beginning of a control switching cycle, that is, the switching mode sequence is changed from T1, T2, T3, T4 to T3, T4, T1, T2, which can effectively simplify the calculation process of each mode duty cycle and reduce the complexity of the control system;
[0043] 2. The predictive control strategy proposed in the present invention can better ensure the realization of soft switching, thereby improving the efficiency of the converter;
[0044] 3. The predictive control strategy proposed in the present invention improves the dynamic performance of the system. When the load or input voltage changes suddenly, the system can quickly reach a steady state without generating subharmonic oscillation problems, effectively curbing the current and voltage overshoot problems in the circuit.
[0045] 4. The predictive control strategy proposed in the present invention can adapt to different switching frequencies, inductance and other circuit parameters and has good adaptability. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0047] Figure 1 Figure 2 is a topology and control diagram of a four-switch Buck-Boost converter.
[0048] Figure 2 Schematic diagram of a four-switch Buck-Boost converter operating in boost PDCM mode and PCRM mode based on a node current prediction control strategy.
[0049] Figure 3 Schematic diagram of a four-switch Buck-Boost converter operating in step-down PDCM mode and PCRM mode based on a node current prediction control strategy.
[0050] Figure 4 Output current, inductor current and output voltage waveforms of a four-switch Buck-Boost converter in boost mode when the load changes based on the node current prediction control strategy.
[0051] Figure 5 The output current, inductor current and output voltage waveforms of the four-switch Buck-Boost converter under load jump in equal-voltage mode based on the node current prediction control strategy.
[0052] Figure 6 Output current, inductor current and output voltage waveforms of a four-switch Buck-Boost converter under load jump in step-down mode based on node current prediction control strategy.
[0053] Figure 7 Output current, inductor current and output voltage waveforms of a four-switch Buck-Boost converter when the input voltage changes at full load based on the node current prediction control strategy. DETAILED DESCRIPTION
[0054] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] See also Figures 1 to 7 The present invention provides an implementation example of a predictive control strategy for a ZVS four-switch Buck-Boost converter based on node current:
[0056] like Figure 1The circuit topology and control schematic diagram of the four-switch Buck-Boost circuit, the predictive control strategy of the four-switch Buck-Boost converter based on the node current, the four-switch Buck-Boost circuit consists of an inductor and four switch tubes, the four switch tubes are Q1, Q2, Q3, and Q4, wherein Q1 and Q2 form the left bridge arm, Q3 and Q4 form the right bridge arm, the two bridge arms share a common ground, the two ends of the inductor are respectively connected to the midpoints of the two bridge arms, the two switch tubes in the same bridge arm are complementary turned on, that is, Q1 and Q2 are complementary turned on, Q3 and Q4 are complementary turned on, and the two switch tubes on the bridge arm need to set a dead time t d , the converter also includes an input capacitor C in and output capacitor C o , used to filter out ripples. In the T1 time period, Q1 and Q4 are turned on, and Q2 and Q3 are turned off; in the T2 time period, Q1 and Q3 are turned on, and Q2 and Q4 are turned off; in the T3 time period, Q2 and Q3 are turned on, and Q1 and Q4 are turned off; in the T4 time period, Q2 and Q4 are turned on, and Q1 and Q3 are turned off.
[0057] When the four-switch Buck-Boost converter works in pseudo discontinuous current mode, the working stages in a single control switch cycle are T3, T4, T1, and T2; when the four-switch Buck-Boost converter works in pseudo critical current mode, the working stages in a single switch cycle are T3, T1, and T2. The node where the inductor current transitions from stage T1 to stage T2 is point P, and the node where the inductor current transitions from stage T2 to stage T3 is point Q.
[0058] The control timing of the four-switch Buck-Boost converter in a single control cycle is T3, T4, T1, and T2. After sampling the initial value of the inductor current switching cycle, i.e., the current value at point Q, the input voltage, and the output voltage, the controller calculates the time of each stage in a single switching cycle of the circuit, and then controls the switching action of the switch tube to make the circuit enter a steady state.
[0059] The specific steps of the control method are as follows:
[0060] Step 1: According to the rated input voltage V in With rated output voltage V o , calculate the minimum soft switching current I ZVS , the specific calculation formula is:
[0061] I ZVS =2C oss ·max{V in ,V o} / t d
[0062] In the formula, C oss is the parasitic capacitance of the switch tube, td is the dead time;
[0063] Step 2: Sample input voltage v in With output voltage v o , judge the working state of the circuit step-up and step-down, the judgment method is:
[0064] When v in <v o When , the four-switch Buck-Boost converter works in the boost state;
[0065] When v in ≥v o When , the four-switch Buck-Boost converter works in the step-down state;
[0066] Step 3: Use the sampled input voltage v in With output voltage v o , calculate the critical node current value I P_b and I P_Io_max , where I P_b is the corresponding value of the inductor current at point P when the converter operates at the interface between PDCM and PCRM modes, I P_Io_max is the corresponding value of the inductor current at point P at the maximum power point. The specific calculation formula is:
[0067]
[0068]
[0069] Where, T s is the switching period, L is the inductance value;
[0070] Step 4: The sampled output voltage v o With a given output voltage reference value V o_ref By comparison, the error signal is input into the PI compensator to obtain the P node inductor current reference signal I PI , and through the limiting link I PI Limited to 0 and I P_Io_max between;
[0071] Step 5: Set the P node inductor current reference signal I PI and critical current value I P_b Compare and judge the converter working mode. The judgment method is:
[0072] When I PI <I P_b When , the converter works in PDCM mode;
[0073] When I PI ≥I P_bWhen , the converter works in PCRM mode;
[0074] Step 6: Sample input voltage v in 、Output voltage v o and the initial value of the inductor current during the switching cycle, i.e., the current value at point Q L_Q , according to the working mode of the circuit, calculate the duty ratios d3, d4, d1, and d2 corresponding to the time periods T3, T4, T1, and T2 in a single switching cycle; the specific calculation formulas under various working modes are:
[0075] When the circuit works in PDCM boost mode:
[0076]
[0077] When the circuit works in PDCM buck mode:
[0078]
[0079] When the circuit works in PCRM mode:
[0080]
[0081] Step 7: Calculate the actual time T3, T4, T1, T2 of each stage in a single switching cycle through the duty cycle d3, d4, d1, d2. The specific formula is:
[0082]
[0083]
[0084]
[0085] T2=T s -T1-T3-T4
[0086] Step 8: Control the switching actions of the switch tubes Q1 to Q4 according to the actual times T3, T4, T1, and T2 of the four stages in a single switching cycle;
[0087] Step 9: Repeat the above steps 2 to 8 to complete the switching cycle.
[0088] Through the above control method, the following can be achieved: Figure 2 , Figure 3 The working waveforms in different working modes are shown.
[0089] In order to further illustrate the superiority of this control strategy, a simulation example of the present invention is given below.
[0090] According to the four-switch Buck-Boost circuit parameters given in Table 1, a simulation circuit was built using Simulink simulation software. Figure 4 , Figure 5 and Figure 6 The dynamic waveforms when the load jumps between 30W and 300W when the converter works in boost mode, equal voltage mode and buck mode are given respectively. The input voltage is 100V, 200V and 300V respectively. The left figure is an enlarged view of the waveform when the load switches from 30W to 300W, and the right figure is an enlarged view of the waveform when the load switches from 300W to 30W. Figure 4 , Figure 5 and Figure 6 It can be seen that when the load undergoes a large sudden change, the converter can quickly reach a steady state within the full input voltage range without generating subharmonic oscillation problems, effectively curbing the current and voltage overshoot problems in the circuit, and having good dynamic performance; Figure 7 The waveform diagram of the input voltage changing between 100V and 300V when the converter is fully loaded is given. The left figure is the waveform diagram of the input voltage changing from 100V to 300V, and the right figure is the waveform diagram of the input voltage changing from 300V to 100V. It can be seen that when the input voltage changes significantly, the converter can quickly reach a steady state.
[0091] Table 1 Four-switch Buck-Boost circuit simulation parameters
[0092]
[0093]
[0094] The above-described embodiment only expresses a specific implementation method of the present application, and its description is relatively specific and detailed, but it cannot be understood as limiting the scope of the invention patent. It should be pointed out that for ordinary technicians in this field, several modifications and improvements can be made without departing from the concept of the present application, which all belong to the protection scope of the present application. Therefore, the protection scope of the patent of this application shall be based on the attached claims.
Claims
1. A predictive control strategy for a ZVS four-switch Buck-Boost converter based on node current, characterized in that: The four-switch Buck-Boost circuit is composed of an inductor and four switch tubes, the four switch tubes are Q1, Q2, Q3, and Q4, wherein Q1 and Q2 form the left bridge arm, Q3 and Q4 form the right bridge arm, the two bridge arms share a common ground, the two ends of the inductor are respectively connected to the midpoints of the two bridge arms, the two switch tubes in the same bridge arm are complementary turned on, that is, Q1 and Q2 are complementary turned on, Q3 and Q4 are complementary turned on, and the two switch tubes on the bridge arm need to set a dead time t d ; The four-switch Buck-Boost converter works as follows: in the T1 time period, Q1 and Q4 are turned on, and Q2 and Q3 are turned off; in the T2 time period, Q1 and Q3 are turned on, and Q2 and Q4 are turned off; in the T3 time period, Q2 and Q3 are turned on, and Q1 and Q4 are turned off; in the T4 time period, Q2 and Q4 are turned on, and Q1 and Q3 are turned off; when the four-switch Buck-Boost converter works in the pseudo discontinuous current mode (Pseudo Discontinuous Current Mode, PDCM), the working stages in a single control switch cycle are T3, T4, T1, and T2; when the four-switch Buck-Boost converter works in the pseudo critical current mode (Pseudo Critical Continuous Current Mode, PCRM), the working stages in a single switch cycle are T3, T1, and T2; the node of the inductor current transitioning from the T1 stage to the T2 stage is point P, and the node of the inductor current transitioning from the T2 stage to the T3 stage is point Q; The control timing of the four-switch Buck-Boost converter in a single control cycle is T3, T4, T1, and T2. After sampling the initial value of the inductor current switching cycle, i.e., the current value at point Q, the input voltage, and the output voltage, the controller calculates the time of each stage in a single switching cycle of the circuit, and then controls the switching action of the switch tube so that the circuit enters a steady state. The specific steps are as follows: Step 1: According to the rated input voltage V in With rated output voltage V o , calculate the minimum soft switching current I ZVS , the specific calculation formula is: I ZVS =2C oss ·max{V in ,V o } / t d In the formula, C oss is the parasitic capacitance of the switch tube, t d is the dead time; Step 2: Sample input voltage v in With output voltage v o , judge the working state of the circuit step-up and step-down, the judgment method is: When v in <v o When , the four-switch Buck-Boost converter works in the boost state; When v in ≥v o When , the four-switch Buck-Boost converter works in the step-down state; Step 3: Use the sampled input voltage v in With output voltage v o , calculate the critical node current value I P_b and I P_Io_max ; where I P_b is the corresponding value of the inductor current at point P when the converter operates at the interface between PDCM and PCRM modes, I P_Io_max is the corresponding value of the inductor current at point P at the maximum power point. The specific calculation formula is: Where, T s is the switching period, L is the inductance value; Step 4: The sampled output voltage v o With a given output voltage reference value V o_ref By comparison, the error signal is input into the PI compensator to obtain the P node inductor current reference signal I PI , and through the limiting link I PI Limited to 0 and I P_Io_max between; Step 5: Set the P node inductor current reference signal I PI and critical current value I P_b Compare and judge the converter working mode. The judgment method is: When I PI <I P_b When , the converter works in PDCM mode; When I PI ≥I P_b When , the converter works in PCRM mode; Step 6: Sample input voltage v in , output voltage v o and the initial value of the inductor current during the switching cycle, i.e., the current value at point Q L_Q , according to the working mode of the circuit, calculate the duty ratios d3, d4, d1, and d2 corresponding to the time periods T3, T4, T1, and T2 in a single switching cycle; the specific calculation formulas under various working modes are: When the circuit works in PDCM boost mode: When the circuit works in PDCM buck mode: When the circuit works in PCRM mode: Step 7: Calculate the actual time T3, T4, T1, T2 of each stage in a single switching cycle through the duty cycle d3, d4, d1, d2. The specific formula is: T2=T s -T1-T3-T4 Step 8: Control the switching actions of the switch tubes Q3, Q4, Q1, and Q2 according to the actual times T3, T4, T1, and T2 of the four stages in a single switching cycle; Step 9: Repeat the above steps 2 to 8 to complete the switching cycle.
2. The node current based ZVS four-switch Buck-Boost converter predictive control strategy according to claim 1, characterized in that: The converter is stable when working in boost mode. The stable condition when the converter works in buck mode is V o <V in <2V o .
3. The node current based ZVS four-switch Buck-Boost converter predictive control strategy according to claim 1, characterized in that: The value I corresponding to the maximum power point inductor current P in step 3 can be calculated P_Io_max The linear fitting formula is: IN P_Io_max =off in +bv o +c Where a, b, and c are constants and can be determined based on the parameters of the converter.
Citation Information
Cited By
Four-switch Buck-Boost converter state trajectory control and finite-state machine implementation method
CN119561382A
Three-phase Buck PFC converter control method
CN120691725A
