Fast-assembly type telescopic temporary cross brace for soft rock large-deformation section
By designing a telescopic temporary cross brace and using a combined structure of support steel and telescopic screw, the problems of structural disturbance and high cost during the removal of existing temporary cross braces are solved, and the surrounding rock deformation control and construction efficiency are improved. Increased utilization.
Patent Information
- Application Number
- CN202411102421.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-22
AI Technical Summary
In the large deformation area of soft rock, the existing temporary cross braces lead to disturbances in the structural steel frame during demolition, difficulty in controlling length, high cost, and inability to recycle, and unable to effectively resist the release of surrounding rock stress.
Design a quick-load telescopic temporary cross brace, adopting an adjustable structure composed of support steel and telescopic screw, which can be telescopic through bolted coupling and hinged members, increase the stress panel and stiffener plate to enhance stiffness, and center The limit plate constrains the screw offset.
It realizes effective control of surrounding rock deformation convergence, improves construction speed, saves material costs, and allows the recycling of temporary cross braces, reducing construction costs.
Smart Images

Figure CN118997138A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building equipment design, and relates to the design of construction equipment for poor geology and soft rock with large deformation, and specifically to a quick-installed retractable temporary cross brace for soft rock with large deformation. Background Art
[0002] With the rapid development of my country's economic system, the number of railway projects crossing complex geological and high-stress soft rock formations has gradually increased, and the control of surrounding rock deformation during construction is particularly important. In the soft rock large deformation section, before the lower step frame is erected, the upper step steel arch frame has undergone varying degrees of convergence deformation, resulting in the lower step steel arch frame and the upper step steel arch frame often not being close together, and the support system structure is not enough to resist the release of surrounding rock stress.
[0003] In order to control the deformation convergence rate of the surrounding rock from being too fast, the step method + temporary cross brace method is often used. In this method, the upper step steel arch frame and the temporary cross brace are installed together to form a closed ring, which supports the lateral convergence and has a good effect on controlling the convergence and deformation of the surrounding rock. However, in this method, the temporary cross brace is generally welded to the arch foot of the upper step steel arch frame. The removal process is likely to cause disturbances to the structural steel frame, and the length of the temporary cross brace must be strictly controlled to ensure that it can be effectively connected to the upper step arch foot steel frame, which places high requirements on the installation accuracy of the steel arch frame and the processing length of the temporary cross brace. At the same time, the temporary cross brace is basically scrapped after removal and cannot be recycled. The one-time cost investment is large, which makes it necessary to further improve it. Summary of the invention
[0004] In view of the shortcomings of the prior art, the purpose of this application is to provide a quick-installed retractable temporary cross brace for soft rock with large deformation areas, so as to control the deformation and convergence of the surrounding rock, increase the construction speed and save materials.
[0005] The technical solution is as follows:
[0006] A quick-installed retractable temporary cross brace for soft rock with large deformation, characterized in that: it is composed of two identical support structures relatively connected and fixed, each support structure comprising support steel and a retractable screw rod;
[0007] The supporting steel is an I-beam structure, with a T-shaped fixed support and a U-shaped fixed support welded to the single-side web at one end, and a connecting steel plate of the end plate structure welded to the other end, with a connecting hole provided on the connecting steel plate; the U-shaped fixed support is a double-ear connecting seat, with a connecting hole provided in the middle of the double ears;
[0008] The telescopic screw rod is composed of a support rod of fixed length, a telescopic screw rod threadedly mounted on the support rod, and a hinged component at the end of the support rod to form a telescopic adjustment structure; the hinged component is hingedly connected to the double-ear connection seat of the U-shaped fixed support;
[0009] The connecting steel plates of the two sections of supporting steel are relatively fixed by bolt connection.
[0010] Furthermore, one end of the support rod is a hollow sleeve with an internal thread, which matches the external thread of the telescopic screw, and the extension and shortening of the rod body is achieved by rotating the telescopic screw; the other end of the support rod is welded to the hinged component to form an integrated structure; the middle part of the hinged component is provided with a connecting hole for hinged connection with the double-ear connecting seat of the U-shaped fixed support.
[0011] Furthermore, a stiffening steel plate is welded at the connection between the fixed support steel and the connecting steel plate. The stiffening steel plate is a triangular structure and is respectively welded and fixed to the surface of the fixed support steel and the connecting steel plate.
[0012] Furthermore, a stress-bearing panel is welded to the end of the telescopic screw rod to increase the contact area with the supporting structure.
[0013] Furthermore, a centering limit plate is welded at the end of the fixed support steel, a through hole matching the diameter of the support rod is opened in the middle of the centering limit plate, and the support rod passes through the through hole of the centering limit plate to constrain the deviation of the retractable screw rod.
[0014] The fixed support steel of the quick-installed retractable temporary cross brace in the soft rock large deformation area of the present invention is respectively welded with a T-shaped fixed support and a U-shaped fixed support at both ends. The T-shaped fixed support is welded to the web of the fixed support steel, and the U-shaped support is welded to the T-shaped fixed support. The ends of the retractable screw rods at both ends are fixed in the U-shaped support, and the ends of the screw rods are provided with stress-bearing steel plates to increase the contact area with the upper step steel arch frame to form a whole and ensure that it has a certain rigidity. In order to prevent the retractable screw rod from axially offset during the process of force extrusion, a centering limit plate is provided to constrain the deviation of the screw rod.
[0015] The quick-installed retractable temporary cross brace of the present invention can adjust the length of the retractable screw rod according to the clearance distance between the arch feet of the upper step steel arch frame to ensure that it can be effectively connected with the upper step arch foot steel frame. At the same time, for the parts with a large deformation rate of the initial support section, the device can replace the conventional fixed-length cross brace as a temporary support, which has higher construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of a temporary cross brace of the present invention;
[0017] Figure 2 It is a schematic diagram of the structure of the retractable screw rod of the present invention;
[0018] Figure 3 This is a schematic diagram of the fixed support steel structure of the present invention;
[0019] Figure 4 This is a detailed structural diagram of the temporary cross brace of the present invention;
[0020] Explanation of the accompanying drawings: 1 is the supporting steel, 2 is the telescopic screw rod, 3 is the centering limit plate, 4 is the T-shaped fixed support, 5 is the U-shaped fixed support, 6 is the load-bearing panel, 7 is the stiffening steel plate, 8 is the connecting steel plate, 9 is the bolts and nuts; 2.1 is the telescopic screw rod, 2.2 is the support rod, and 2.3 is the hinged component. DETAILED DESCRIPTION
[0021] The present invention is further described below in conjunction with specific implementation methods. The specific implementation methods are further descriptions of the principles of the present invention and do not limit the present invention in any way. Technologies that are the same or similar to the present invention do not exceed the scope of protection of the present invention.
[0022] Combined with the attached pictures.
[0023] like Figure 1 As shown, the present invention is composed of a fixed support steel 1, a telescopic screw rod 2, a centering limit plate 3, a T-shaped fixed support 4, a U-shaped fixed support 5, a load-bearing panel 6, a stiffening steel plate 7, a connecting steel plate 8, bolts and nuts 9, etc.
[0024] like Figure 2 As shown, the telescopic screw rod 2 is composed of a fixed-length support rod 2.2, a telescopic screw rod 2.1 and a hinged member 2.3 to form a telescopic adjustment structure, wherein one end of the support rod 2.2 is hollow with an internal threaded structure, which matches the external threaded structure of the telescopic screw rod 2.1, and the extension and shortening of the rod body are achieved by rotating the telescopic screw rod 2.1. The other end of the support rod 2.2 is a solid rod, which is welded to the hinged member 2.3 to form a whole. A connecting hole is opened in the middle of the hinged member 2.3.
[0025] like Figure 3 As shown, the fixed support steel 1 is an I-beam structure, with a T-shaped fixed support 4 and a U-shaped fixed support 5 welded on the web at one end, and a connecting steel plate 8 welded on the other end, and a connecting hole is provided. The T-shaped fixed support 4 is mainly used to prevent slippage and reinforce, and a connecting hole is provided in the middle of the U-shaped fixed support 5. In order to ensure structural strength and force stability, a stiffening steel plate 7 is welded at the connection between the fixed support steel 1 and the connecting steel plate 8. The stiffening steel plate 7 is a triangular structure, which is respectively pressed against the surface of the fixed support steel 1 and the connecting steel plate 8 and fully welded.
[0026] like Figure 4 As shown, the hinged member 2.3 in the telescopic screw rod 2 and the U-shaped fixed support 5 in the fixed support steel 1 are connected to form a whole by bolts and nuts 9.
[0027] like Figure 1As shown, the end of the telescopic screw rod 2.1 is welded with a stress panel 6, which can increase the contact area with the upper step steel arch frame and ensure its stress stability. Taking into account the situation that the tunnel section is large and the fixed support steel 1 structure is heavy, the temporary cross brace of the present invention is composed of two sections, which are mechanically connected into one by bolts and nuts 9 through the connecting steel plate 8 in the fixed support steel 1. In order to prevent the telescopic screw rod 2 from axial displacement during the process of surrounding rock convergence deformation and extrusion, a centering limit plate 3 is welded to the end of the fixed support steel 1, and a hole is opened in the middle of the centering limit plate 3. The support rod 2.2 can be inserted into the hole of the centering limit plate 3 to restrain the telescopic screw rod 2 from deflecting.
[0028] The quick-installed retractable temporary cross brace of the device can be adjusted according to the clearance between the arch feet of the upper step steel arch frame by adjusting the length of the retractable screw rod 2.1 to ensure that it can be close to the upper step arch foot steel arch frame. At the same time, for the parts of the initial support section of the tunnel with a large deformation rate, the device can be used instead of the conventional fixed-length cross brace as a temporary support, and the construction efficiency is high.
[0029] Before excavating the lower step, the retractable screw rod 2.1 is manually shortened in length, the device is removed and transported to the next cycle for use.
Claims
1. A quick-install retractable temporary cross brace for soft rock with large deformation, characterized by: It is composed of two identical supporting structures that are relatively connected and fixed, and each supporting structure includes supporting steel and a telescopic screw rod; The supporting steel is an I-beam structure, with a T-shaped fixed support and a U-shaped fixed support welded to the single-side web at one end, and a connecting steel plate of the end plate structure welded to the other end, with a connecting hole provided on the connecting steel plate; the U-shaped fixed support is a double-ear connecting seat, with a connecting hole provided in the middle of the double ears; The telescopic screw rod is composed of a support rod of fixed length, a telescopic screw rod threadedly mounted on the support rod, and a hinged component at the end of the support rod to form a telescopic adjustment structure; the hinged component is hingedly connected to the double-ear connection seat of the U-shaped fixed support; The connecting steel plates of the two sections of supporting steel are relatively fixed by bolt connection.
2. The quick-install retractable temporary cross brace for soft rock with large deformation according to claim 1 is characterized by: One end of the support rod is a hollow sleeve with an internal thread, which matches the external thread of the telescopic screw, and the extension and shortening of the rod body is achieved by rotating the telescopic screw; the other end of the support rod is welded to the hinged component to form an integrated structure; the middle part of the hinged component is provided with a connecting hole for hinged connection with the double-ear connecting seat of the U-shaped fixed support.
3. The quick-install retractable temporary cross brace for soft rock with large deformation according to claim 1 is characterized by: A stiffening steel plate is welded at the connection portion between the fixed support steel and the connecting steel plate. The stiffening steel plate is a triangular structure and is respectively welded and fixed to the surfaces of the fixed support steel and the connecting steel plate.
4. The quick-install retractable temporary cross brace for soft rock with large deformation according to claim 1 is characterized by: The end of the telescopic screw rod is welded with a stress-bearing panel to increase the contact area with the supporting structure.
5. The quick-install retractable temporary cross brace for soft rock with large deformation according to claim 1 is characterized by: A centering limit plate is welded at the end of the fixed support steel, a through hole matching the diameter of the support rod is opened in the middle of the centering limit plate, and the support rod passes through the through hole of the centering limit plate to constrain the deviation of the telescopic screw rod.