Low-clearance flexible reinforcement cage on-site construction method

Through the roll-type flexible steel cage assembly and curve-tuning splicing technology, the problem of low construction efficiency of steel cages in low clearance environments is solved, rapid and economical construction is achieved, and pile quality is ensured.

CN119021199AActive Publication Date: 2024-11-26NO 2 CONSTR GRP CO LTD OF SHANGHAI CONSTR GRP

Patent Information

Application Number
CN202411322401.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-26
Estimated Expiration
2044-09-23

AI Technical Summary

Technical Problem

In a low clearance environment, traditional steel cage construction methods are inefficient, time-consuming, high labor materials costs, and there are many problems with segmented lifting and welding.

Method used

The reel type flexible steel cage assembly is adopted, and the flexible steel cage mesh is deployed through the driving mechanism, and the circular stirrup is formed using the curve adjustment assembly and splicing device to achieve rapid splicing and fixing, avoiding sections and segments of lifting and welding.

Benefits of technology

It improves construction efficiency, reduces consumables and costs, ensures the overall quality of the pile body, avoids the existence of welding points, and achieves efficient on-site preparation in a low clearance environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021199A_ABST
    Figure CN119021199A_ABST
Patent Text Reader

Abstract

The low-clearance flexible reinforcement cage on-site construction method comprises the following steps that a flexible reinforcement cage mesh is rolled up along longitudinal bars and wound on a winding drum, and a winding drum type flexible reinforcement cage assembly is formed; the reel type flexible reinforcement cage assembly is transported to a construction site and installed above the pile hole through a support; the flexible reinforcement cage meshes wound on the winding drum are unfolded along the longitudinal bars; the stirrups of the unfolded flexible reinforcement cage meshes are bent to form a circle, and the flexible reinforcement cage is formed after the two ends of the stirrups are spliced and fixed. According to the reel type flexible reinforcement cage assembly, the longitudinal bars of the flexible reinforcement cage mesh are the steel strands, the flexible reinforcement cage mesh can be rolled up along the longitudinal bars and wound on the reel, the formed reel type flexible reinforcement cage assembly is small in occupied space and convenient to store and transport, the flexible reinforcement cage mesh can be gradually unfolded along the longitudinal bars in the indoor low-clearance environment, and therefore the flexible reinforcement cage assembly is convenient to use. The flexible reinforcement cage forming device has the advantages of being high in construction efficiency, low in material consumption, low in cost and good in quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underground pile foundation steel cages, and in particular to an on-site construction method for a low-headroom flexible steel cage. Background Art

[0002] In recent years, the concept of urban renewal has been continuously promoted, and urban development has gradually shifted from large-scale demolition and construction to organic renewal. At present, the repair, renovation and redevelopment of existing old buildings and historical buildings have become the main direction of urban renewal. The renovation of existing buildings often involves pile foundation construction in indoor environments with limited height and space. According to the traditional method of making steel cages, only segmented binding, segmented hoisting and segmented welding can be adopted. This construction method has obvious problems, namely low efficiency, long time consumption and high labor and material costs. Summary of the invention

[0003] In view of the problems existing in the segmented lifting construction of steel cages in low-headroom environments, the present invention provides an on-site construction method for low-headroom flexible steel cages, which can quickly complete the production of flexible steel cages in low-headroom construction environments. The flexible steel cages do not need to be constructed in segments, which can effectively solve the above problems.

[0004] In order to solve the above technical problems, the present invention includes the following technical solutions:

[0005] A low-headroom flexible steel cage on-site construction method, the construction method comprising the following steps:

[0006] Step 1: Roll up the flexible steel cage mesh along the longitudinal reinforcement and coil it on a reel to form a reel-type flexible steel cage assembly; the flexible steel cage mesh includes a plurality of longitudinal reinforcements and a plurality of stirrups, the longitudinal reinforcements are steel strands, and the stirrups are arranged in parallel and at intervals and perpendicular to the longitudinal reinforcements;

[0007] Step 2: transport the reel-type flexible steel cage assembly to the construction site, install it above the pile hole through a bracket, rotate the reel and the bracket, and install the drive mechanism;

[0008] Step 3: The reel is rotated by a driving mechanism to unfold the flexible steel cage mesh wound on the reel along the longitudinal reinforcement;

[0009] Step 4: bend the stirrups of the unfolded flexible steel cage mesh into a circle, splice and fix the two ends of the stirrups to form a flexible steel cage; when the flexible steel cage mesh coiled on the drum is unfolded along the longitudinal reinforcement, the flexible steel cage is simultaneously lowered along the pile hole.

[0010] Furthermore, the design parameters of the flexible reinforcement cage include: number of longitudinal bars x, longitudinal bar spacing d, and circumference of annular stirrups l;

[0011] The set length of the stirrups of the flexible steel cage mesh is l+Δl, the number of longitudinal bars of the flexible steel cage mesh is x, the spacing is d, and the protruding lengths of the stirrups at both ends are 0.5d and 0.5d+Δl respectively, where Δl is the lap length of the stirrups.

[0012] Further, in step 4, the stirrups of the unfolded flexible steel cage mesh are bent into a circle using low-headroom flexible steel cage on-site construction equipment;

[0013] The construction equipment includes a support frame and a bending adjustment component;

[0014] The support frame includes a plurality of support columns and an operating platform, wherein the operating platform is horizontally arranged on the support columns, and the tuning assembly is arranged on the operating platform;

[0015] The bending adjustment assembly includes a multi-telescopic end bending adjustment device, a first telescopic bending adjustment mechanism, a second telescopic bending adjustment mechanism and a third telescopic bending adjustment mechanism; the multi-telescopic end bending adjustment device includes an annular plate and a plurality of first telescopic oil cylinders, and the first telescopic oil cylinders are arranged along the circumference of the annular plate; the first telescopic bending adjustment mechanism, the second telescopic bending adjustment mechanism and the third telescopic bending adjustment mechanism each include a reaction force backrest, a second telescopic oil cylinder and an arc bending adjustment plate, and the first telescopic bending adjustment mechanism, the second telescopic bending adjustment mechanism and the third telescopic bending adjustment mechanism are arranged around the multi-telescopic end bending adjustment device;

[0016] The stirrups of the unfolded flexible steel cage mesh are bent into a circle, which specifically includes the following steps:

[0017] A1. The unfolded flexible steel cage mesh is lowered to a height that matches the stirrup height and the bending adjustment assembly, the first telescopic bending adjustment mechanism is located on one side of the flexible steel cage mesh, and the multi-telescopic end bending adjustment device, the second telescopic bending adjustment mechanism and the third telescopic bending adjustment mechanism are located on the other side of the flexible steel cage mesh;

[0018] A2. Synchronously control the extension operation of the multi-telescopic end bending adjustment device so that the end of the first telescopic cylinder is located on the same circumference, and the radius of the circle is R, where R is the design value of the inner diameter of the stirrup of the flexible steel cage;

[0019] A3. Extend the second telescopic cylinder of the first telescopic adjustment mechanism, so that the arc-shaped adjustment plate presses against the stirrups, and the stirrups press against the end of the first telescopic cylinder, and the middle part of the stirrups forms an arc shape;

[0020] A4. Extend the second telescopic cylinders of the second telescopic adjustment mechanism and the third telescopic adjustment mechanism, so that the arc-shaped adjustment plate presses against the two ends of the stirrup respectively, and the ends of the stirrup press against the ends of the first telescopic cylinder, so that the two ends of the stirrup form an arc shape, and the entire stirrup forms a circle.

[0021] Furthermore, the construction equipment also includes a stirrup end splicing device, which includes a mechanical arm and a splicing mechanism; one end of the mechanical arm is fixedly connected to the support frame, and the other end is provided with a splicing mechanism, and the splicing mechanism is an electric welding gun or an automatic tying machine;

[0022] In step A4, after the entire stirrup is formed into a circle, the ends are overlapped together;

[0023] In step 4, the two ends of the stirrups are spliced ​​and fixed to form a flexible steel cage, which specifically includes: adjusting the mechanical arm of the splicing device at the end of the stirrups, fixing the overlapping parts of the two ends of the stirrups through the splicing mechanism to form a flexible steel cage; synchronously controlling the contraction operation of the multi-telescopic end adjustment device, controlling the contraction operation of the second telescopic oil cylinder of the first telescopic adjustment mechanism, the second telescopic adjustment mechanism, and the third telescopic adjustment mechanism, so that the flexible steel cage is separated from the multi-telescopic end adjustment device, the first telescopic adjustment mechanism, the second telescopic adjustment mechanism, and the third telescopic adjustment mechanism.

[0024] Further, the first end of the stirrup is provided with a stirrup connecting sleeve, the first end of the stirrup connecting sleeve is provided with an internal thread, the second end is provided with a cavity, a colloid is provided in the cavity, and the second end of the stirrup connecting sleeve is sealed by a sealing structure;

[0025] In step A4, after the entire stirrup is formed into a circle, the second end of the stirrup pierces the end-sealing structure and is inserted into the colloid, and is fixed by bonding with the colloid.

[0026] Due to the adoption of the above technical scheme, the present invention has the following advantages and positive effects compared with the prior art: the low-headroom flexible steel cage on-site construction method provided by the present invention adopts steel strands as the longitudinal reinforcement of the flexible steel cage mesh, so that the flexible steel cage mesh can be rolled up along the longitudinal reinforcement and coiled on a reel. The formed reel-type flexible steel cage assembly occupies a small space and is convenient for storage and transportation. Moreover, the flexible steel cage mesh can be gradually unfolded along the longitudinal reinforcement in a low-headroom environment indoors. The flexible steel cage only needs to bend the stirrups and fix the ends. The flexible steel cage can be lowered synchronously during the unfolding process of the flexible steel mesh. The construction method can prepare the flexible steel cage on site under low headroom conditions without the need for segmented and batched hoisting and welding, thus avoiding the problem of numerous welding points in the segmented welding of longitudinal reinforcement in conventional construction under low headroom conditions. The longitudinal reinforcement of the overall structure can ensure the overall quality of the pile body, and has the advantages of high construction efficiency, less consumables, and low cost. The stirrups of the unfolded flexible steel cage mesh are bent into a circle by using low-headroom flexible steel cage on-site construction equipment, thereby improving the efficiency and quality of the bending and forming of the stirrups. By arranging a stirrup end splicing device or arranging a stirrup connecting sleeve at the end of the stirrup, the stirrup ends can be quickly spliced ​​and fixed, thereby improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1is a cross-sectional view of a reel-type flexible steel cage assembly in one embodiment of the present invention;

[0028] Figure 2 Schematic diagram of winding of a flexible steel cage mesh in one embodiment of the present invention;

[0029] Figure 3 It is a schematic diagram of the longitudinal reinforcement spacing and the extension length of the stirrup ends of the flexible steel cage mesh in one embodiment of the present invention;

[0030] Figure 4 It is a schematic diagram of a flexible steel cage formed by unfolding, bending and splicing a flexible steel cage mesh in one embodiment of the present invention;

[0031] Figure 5 A schematic diagram of manufacturing a flexible steel cage using a flexible steel cage manufacturing device provided in one embodiment of the present invention;

[0032] Figure 6 This is a diagram showing the position relationship between the flexible steel cage mesh and the bending adjustment device after it is unfolded;

[0033] Figure 7 A schematic diagram of adjusting the middle part of the stirrup into an arc segment by using a multi-telescopic end adjustment device and a first telescopic adjustment mechanism;

[0034] Figure 8 A schematic diagram of adjusting the two ends of the stirrup into arc segments by using a multi-telescopic end adjustment device, a second telescopic adjustment mechanism, and a third telescopic adjustment mechanism;

[0035] Fig. 9 It is a schematic diagram of resetting the multi-telescopic end adjustment device, the first telescopic adjustment mechanism, the second telescopic adjustment mechanism, and the third telescopic adjustment mechanism;

[0036] Fig.10 Schematic diagram of a sleeve provided at the end of the stirrup of a reel-type flexible steel cage assembly

[0037] Fig.11 It is a schematic diagram of the development of a flexible steel cage mesh provided with a sleeve;

[0038] Fig.12 It is a schematic diagram of the structure of the sleeve.

[0039] The numbers in the figure are as follows:

[0040] 1-Flexible steel cage;

[0041] 10-roll-type flexible steel cage assembly; 11-roll; 12-flexible steel cage mesh; 13-longitudinal reinforcement; 14-stirrup; 15-snap connector; 16-steel strand connection sleeve; 17-stirrup connection sleeve; 171-internal thread; 172-colloid; 173-end capping structure;

[0042] 20-support frame; 21-support column; 22-operating platform; 221-connecting rod;

[0043] 30-adjusting assembly; 31-multi-telescopic end adjusting device; 311-annular plate; 312-first telescopic oil cylinder; 313-first roller; 32-first telescopic adjusting mechanism; 33-second telescopic adjusting mechanism; 34-third telescopic adjusting mechanism; 321-reaction backrest; 322-second telescopic oil cylinder; 323-arc-shaped adjusting plate; 324-second roller; 40-stirrup end splicing device; 41-mechanical arm; 42-splicing mechanism; 43-hoop. DETAILED DESCRIPTION

[0044] The low clearance flexible steel cage on-site construction equipment and method provided by the present invention are further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer in conjunction with the following description. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0045] Figure 1 A cross-sectional view of a reel-type flexible steel cage assembly 10 is shown. The reel-type flexible steel cage assembly 10 includes a reel 11, on which a flexible steel cage mesh 12 is wound. The flexible steel cage mesh 12 includes a plurality of longitudinal bars 13 and a plurality of stirrups 14. The longitudinal bars 13 are steel strands, and the stirrups 14 are ordinary ribbed steel bars. One end of the steel strand is fixed to the reel 11. For example, a snap connector 15 is provided on the reel 11. The snap connector 15 snaps and fixes one end of the steel strand to the reel 11. The snap connector 15 can be implemented using existing technology as long as the end of the steel strand can be locked and fixed. Baffles can also be provided at both ends of the reel 11. The reel is provided on the frame through a rotating shaft. The reel can be rotated through the rotating shaft, and the rotation of the reel can also be controlled by providing a driving mechanism. The ends of the steel strands can also be provided with steel strand connection sleeves 16. When the length of the flexible steel cage mesh 12 of a reel-type flexible steel cage assembly 10 is less than the height of the flexible steel cage, the steel strands of the flexible steel cage mesh 12 of two reel-type flexible steel cage assemblies 10 can be spliced ​​together through the steel strand connection sleeves 16. In order to make the display clearer, Figure 2 , Figure 4 and Figure 5 The rolled-up flexible steel cage assembly 10 in the figure only shows the rolled-up flexible steel cage mesh 12, and the remaining components of the rolled-up flexible steel cage assembly 10 are not shown.

[0046] Combination Figures 1 to 3As shown, the flexible steel cage mesh 12 is manufactured outside the site, the number of longitudinal bars 13 of the flexible steel cage mesh 12 is consistent with the number of longitudinal bars of the final flexible steel cage, the stirrups 14 are arranged in parallel and perpendicular to the longitudinal bars 13, and the spacing of the stirrups 14 is consistent with the spacing of the stirrups of the final flexible steel cage. As an example, when the number of longitudinal bars of the designed flexible steel cage is x, the spacing of the longitudinal bars is d, and the circumference of the annular stirrups is l, the setting length of the stirrups of the flexible steel cage mesh 12 is l+Δl, the number of longitudinal bars of the flexible steel cage mesh 12 is x, the spacing is d, and the protruding lengths at both ends are 0.5d and 0.5d+Δl respectively, where Δl is the lap length of the stirrups, and the steel bar specifications are the same as the design specifications of the flexible steel cage. The stirrups and the steel strands are fixed by tying or welding at the intersection, and are wound along the length direction of the steel strands.

[0047] Figure 4 The on-site construction method of low headroom flexible steel cage is demonstrated, including the following steps:

[0048] Step 1: Roll up the flexible steel cage mesh 12 along the longitudinal reinforcement 13 and coil it on a reel to form a reel-type flexible steel cage assembly 10; the flexible steel cage mesh 12 includes a plurality of longitudinal reinforcements 13 and a plurality of stirrups 14, the longitudinal reinforcements are steel strands, and the stirrups are arranged in parallel and at intervals and perpendicular to the longitudinal reinforcements;

[0049] Step 2: transport the reel-type flexible steel cage assembly 10 to the construction site, and install it above the pile hole through a bracket, the reel is rotatably connected to the bracket, and a driving mechanism for controlling the rotation of the reel is installed;

[0050] Step 3: The reel is rotated by a driving mechanism, and the flexible steel cage mesh 12 wound on the reel is unfolded along the longitudinal reinforcement;

[0051] Step 4: bend the stirrups 14 of the unfolded flexible steel cage mesh 12 into a circle, splice and fix the two ends of the stirrups to form a flexible steel cage 1; when the flexible steel cage mesh wound on the drum is unfolded along the longitudinal reinforcement, the flexible steel cage is simultaneously lowered along the pile hole.

[0052] The low-headroom flexible steel cage on-site construction method provided in this embodiment adopts steel strands as the longitudinal reinforcement 13 of the flexible steel cage mesh 12, so that the flexible steel cage mesh 12 can be rolled up along the longitudinal reinforcement 13 and coiled on a reel. The formed reel-type flexible steel cage assembly 10 takes up little space, is convenient for storage and transportation, and can gradually unfold the flexible steel cage mesh 12 along the longitudinal reinforcement 13 in an indoor low-headroom environment. It is only necessary to bend the stirrups 14 and fix the ends to form a flexible steel cage 1. The flexible steel cage 1 is lowered synchronously during the unfolding of the flexible steel mesh 12. This construction method can prepare the flexible steel cage on-site under low-headroom conditions without the need for lifting and welding in sections and batches, avoiding the problem of numerous welding points in the segmented welding of longitudinal reinforcements in conventional construction under low headroom. The longitudinal reinforcement of the overall structure can ensure the overall quality of the pile body, and has the advantages of high construction efficiency, less consumables, and low cost.

[0053] In a specific embodiment, Figure 5 As shown, in step 4, the stirrups 14 of the unfolded flexible steel cage mesh 12 are bent into a circle using low-headroom flexible steel cage on-site construction equipment. Figure 5 and Figure 6 As shown, the construction equipment includes a support frame 20 and a bending adjustment component; the support frame 20 includes a plurality of support columns 21 and an operating platform 22, the operating platform 22 is horizontally arranged on the support columns 21, and the bending adjustment component is arranged on the operating platform 22; the bending adjustment component includes a multi-telescopic end bending adjustment device 31, a first telescopic bending adjustment mechanism 32, a second telescopic bending adjustment mechanism 33 and a third telescopic bending adjustment mechanism 34; the multi-telescopic end bending adjustment device 31 includes an annular plate 311 and a plurality of first telescopic oil cylinders 312, the first telescopic oil cylinders 312 are arranged along the circumference of the annular plate 311, the annular plate is connected to the support column above the operating platform through a connecting rod 23, or a platform is arranged above the operating platform to connect the connecting rod 23 to the upper platform, the connecting rod can be a straight rod, an inclined rod, a Z-shaped rod or other shapes, mainly to suspend the annular plate and not hinder the lowering of the flexible steel cage. The first telescopic bending adjustment mechanism 32, the second telescopic bending adjustment mechanism 33 and the third telescopic bending adjustment mechanism 34 all include a reaction backrest 321, a second telescopic oil cylinder 322 and an arc-shaped bending adjustment plate 323. The first telescopic bending adjustment mechanism 32, the second telescopic bending adjustment mechanism 33 and the third telescopic bending adjustment mechanism 34 are arranged around the multi-telescopic end bending adjustment device 31. Bending the stirrups 14 of the unfolded flexible steel cage mesh 12 into a circle specifically includes the following steps:

[0054] A1. Combination Figure 5 and Figure 6As shown, the unfolded flexible steel cage mesh 12 is lowered to the height of the stirrup 14 to match the bending adjustment assembly, the first telescopic bending adjustment mechanism 32 is located on one side of the flexible steel cage mesh 12, and the multi-telescopic end bending adjustment device 31, the second telescopic bending adjustment mechanism 33 and the third telescopic bending adjustment mechanism 34 are located on the other side of the flexible steel cage mesh 12;

[0055] A2. Synchronously control the extension operation of the multi-telescopic end bending device 31, so that the end of the first telescopic cylinder 312 is located on the same circumference, the radius of the circle is R, where R is the design value of the inner diameter of the stirrup 14 of the flexible steel cage 1;

[0056] A3. Combination Figures 5 to 7 As shown, the second telescopic oil cylinder 322 of the first telescopic bending adjustment mechanism 32 is extended to operate, so that the arc-shaped bending adjustment plate 323 is pressed against the stirrup 14, and the stirrup 14 is pressed against the end of the first telescopic oil cylinder 312, and the middle part of the stirrup 14 forms an arc shape;

[0057] A4. Combination Figures 5 to 8 As shown, the second telescopic oil cylinder 322 of the second telescopic adjustment mechanism 33 and the third telescopic adjustment mechanism 34 is extended, so that the arc-shaped adjustment plate 323 is respectively pressed against the two ends of the stirrup 14, and the ends of the stirrup 14 are pressed against the ends of the first telescopic oil cylinder 312, so that the two ends of the stirrup 14 form an arc shape, and the entire stirrup 14 forms a circle. Fig. 9 As shown, after the ends of the stirrups are welded or tied, the multi-telescopic end adjustment device 31 is synchronously controlled to retract, and the second telescopic oil cylinder 322 of the first telescopic adjustment mechanism 32, the second telescopic adjustment mechanism 33, and the third telescopic adjustment mechanism 34 is controlled to retract, so that the flexible steel cage 1 is separated from the adjustment assembly, which facilitates the lowering of the flexible steel cage into the pile hole.

[0058] Furthermore, the construction equipment also includes a stirrup end splicing device 40, which includes a mechanical arm 41 and a splicing mechanism 42; one end of the mechanical arm 41 is fixedly connected to the support frame 20, for example, it can be set on the support column through a clamp 43, or it can be fixed to the support column or the operating platform through bolts, and the other end is provided with a splicing mechanism 42, which is an electric welding gun or an automatic tying machine. In step A4, after the entire stirrup 14 is formed into a circle, the ends are overlapped together. In step 4, the two ends of the stirrup 14 are spliced ​​and fixed to form a flexible steel cage 1, which specifically includes: adjusting the mechanical arm 41 of the stirrup end splicing device 40, and fixing the overlapped parts of the two ends of the stirrup through the splicing mechanism 42 to form a flexible steel cage 1; synchronously controlling the contraction operation of the multi-telescopic end bending adjustment device 31, controlling the contraction operation of the second telescopic oil cylinder 322 of the first telescopic bending adjustment mechanism 32, the second telescopic bending adjustment mechanism 33, and the third telescopic bending adjustment mechanism 34, so that the flexible steel cage is separated from the multi-telescopic end bending adjustment device 31, the first telescopic bending adjustment mechanism 32, the second telescopic bending adjustment mechanism 33, and the third telescopic bending adjustment mechanism 34, and when the flexible steel cage mesh 12 is lowered, it is convenient for the flexible steel cage 1 to be synchronously lowered into the pile hole. This embodiment can realize the rapid splicing and fixing of the stirrup ends by setting the stirrup end splicing device 40, thereby improving the construction efficiency.

[0059] In a specific embodiment, in combination Fig.10 and Fig.11 As shown, the first end of the stirrup 14 is provided with a stirrup connecting sleeve 17, and the first end of the stirrup connecting sleeve 17 is provided with an internal thread 171, which is threadedly connected to the first end of the stirrup; the second end of the stirrup connecting sleeve 17 is provided with a cavity, and a high-strength fast gel 172 is provided in the cavity, and is sealed by a sealing structure 173, wherein the high-strength fast gel 172 can be realized by existing technology. In step A4, after the entire stirrup 14 is formed into a circle, the second end of the stirrup pierces the sealing structure 173 and is inserted into the colloid, and is bonded and fixed by the colloid 173. In this embodiment, by providing a stirrup connecting sleeve 17, it is convenient to quickly splice and fix the two ends of the stirrup, thereby improving construction efficiency.

[0060] In a specific embodiment, Figures 6 to 9 As shown, a first roller 313 is provided at one end of the first telescopic cylinder 312 away from the annular plate 311, and a second roller 324 is provided at the end of the arc-shaped bending adjustment plate 323. By providing the first roller and the second roller, the friction force can be reduced when the stirrups are bent.

[0061] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0062] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A low-headroom flexible steel cage on-site construction method, characterized in that: The construction method comprises the following steps: Step 1: Roll up the flexible steel cage mesh along the longitudinal reinforcement and coil it on a reel to form a reel-type flexible steel cage assembly; the flexible steel cage mesh includes a plurality of longitudinal reinforcements and a plurality of stirrups, the longitudinal reinforcements are steel strands, and the stirrups are arranged in parallel and at intervals and perpendicular to the longitudinal reinforcements; Step 2: transport the reel-type flexible steel cage assembly to the construction site, install it above the pile hole through a bracket, rotate the reel and the bracket, and install the drive mechanism; Step 3: The reel is rotated by a driving mechanism to unfold the flexible steel cage mesh wound on the reel along the longitudinal reinforcement; Step 4: bend the stirrups of the unfolded flexible steel cage mesh into a circle, splice and fix the two ends of the stirrups to form a flexible steel cage; when the flexible steel cage mesh coiled on the drum is unfolded along the longitudinal reinforcement, the flexible steel cage is simultaneously lowered along the pile hole.

2. The low-headroom flexible steel cage on-site construction method according to claim 1, characterized in that: The design parameters of the flexible steel cage include: number of longitudinal bars x, spacing between longitudinal bars d, and circumference of annular stirrups l; The set length of the stirrups of the flexible steel cage mesh is l+Δl, the number of longitudinal bars of the flexible steel cage mesh is x, the spacing is d, and the protruding lengths of the stirrups at both ends are 0.5d and 0.5d+Δl respectively, where Δl is the lap length of the stirrups.

3. The low-headroom flexible steel cage on-site construction method according to claim 1 is characterized in that: In step 4, the stirrups of the unfolded flexible steel cage mesh are bent into a circle using low-headroom flexible steel cage on-site construction equipment; The construction equipment includes a support frame and a bending adjustment component; The support frame includes a plurality of support columns and an operating platform, wherein the operating platform is horizontally arranged on the support columns, and the tuning assembly is arranged on the operating platform; The bending adjustment assembly includes a multi-telescopic end bending adjustment device, a first telescopic bending adjustment mechanism, a second telescopic bending adjustment mechanism and a third telescopic bending adjustment mechanism; the multi-telescopic end bending adjustment device includes an annular plate and a plurality of first telescopic oil cylinders, and the first telescopic oil cylinders are arranged along the circumference of the annular plate; the first telescopic bending adjustment mechanism, the second telescopic bending adjustment mechanism and the third telescopic bending adjustment mechanism each include a reaction force backrest, a second telescopic oil cylinder and an arc bending adjustment plate, and the first telescopic bending adjustment mechanism, the second telescopic bending adjustment mechanism and the third telescopic bending adjustment mechanism are arranged around the multi-telescopic end bending adjustment device; The stirrups of the unfolded flexible steel cage mesh are bent into a circle, which specifically includes the following steps: A1. The unfolded flexible steel cage mesh is lowered to a height that matches the stirrup height and the bending adjustment assembly, the first telescopic bending adjustment mechanism is located on one side of the flexible steel cage mesh, and the multi-telescopic end bending adjustment device, the second telescopic bending adjustment mechanism and the third telescopic bending adjustment mechanism are located on the other side of the flexible steel cage mesh; A2. Synchronously control the extension operation of the multi-telescopic end bending adjustment device so that the end of the first telescopic cylinder is located on the same circumference, and the radius of the circle is R, where R is the design value of the inner diameter of the stirrup of the flexible steel cage; A3. Extend the second telescopic cylinder of the first telescopic adjustment mechanism, so that the arc-shaped adjustment plate presses against the stirrups, and the stirrups press against the end of the first telescopic cylinder, and the middle part of the stirrups forms an arc shape; A4. Extend the second telescopic cylinders of the second telescopic adjustment mechanism and the third telescopic adjustment mechanism, so that the arc-shaped adjustment plate presses against the two ends of the stirrup respectively, and the ends of the stirrup press against the ends of the first telescopic cylinder, so that the two ends of the stirrup form an arc shape, and the entire stirrup forms a circle.

4. The low clearance flexible steel cage on-site construction method as claimed in claim 3 is characterized in that: The construction equipment also includes a stirrup end splicing device, which includes a mechanical arm and a splicing mechanism; one end of the mechanical arm is fixedly connected to the support frame, and the other end is provided with a splicing mechanism, and the splicing mechanism is an electric welding gun or an automatic tying machine; In step A4, after the entire stirrup is formed into a circle, the ends are overlapped together; In step 4, the two ends of the stirrups are spliced ​​and fixed to form a flexible steel cage, which specifically includes: adjusting the mechanical arm of the splicing device at the end of the stirrups, fixing the overlapping parts of the two ends of the stirrups through the splicing mechanism to form a flexible steel cage; synchronously controlling the contraction operation of the multi-telescopic end adjustment device, controlling the contraction operation of the second telescopic oil cylinder of the first telescopic adjustment mechanism, the second telescopic adjustment mechanism, and the third telescopic adjustment mechanism, so that the flexible steel cage is separated from the multi-telescopic end adjustment device, the first telescopic adjustment mechanism, the second telescopic adjustment mechanism, and the third telescopic adjustment mechanism.

5. The low clearance flexible steel cage on-site construction method as claimed in claim 3, characterized in that: The first end of the stirrup is provided with a stirrup connecting sleeve, the first end of the stirrup connecting sleeve is provided with an internal thread, the second end is provided with a cavity, a colloid is provided in the cavity, and the second end of the stirrup connecting sleeve is sealed by an end-sealing structure; In step A4, after the entire stirrup is formed into a circle, the second end of the stirrup pierces the end-sealing structure and is inserted into the colloid, and is fixed by bonding with the colloid.

Citation Information

Patent Citations

  • Reinforcement cage quick installation device

    CN107685125A

  • Steel reinforcement cage forming mechanism

    CN108237192A

  • Shield segment reinforcement cage intelligent forming production line

    CN108326208A

  • Fiber reinforced polymer (FRP) fiber bar-steel bar composite steel bar cage production device and use method thereof

    CN109555110A

  • Forming process of super-large-diameter annular reinforcing mesh component

    CN113231580A

Cited By

  • Flexible reinforcement cage on-site preparation method

    CN119114806A

  • Method for on-site preparation of flexible reinforcement cages

    CN119114806B