Non-insertion type double-layer steel sheet pile cofferdam and construction method thereof
Through the non-insert double-layer steel sheet pile cofferdam and construction method, the use of components such as clay seats and limit frames to solve the problem of construction discontinuity when spanning the existing structures, and improve the water stop and overturning resistance of the cofferdam. And reduces the footprint.
Patent Information
- Application Number
- CN202411201038.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-26
AI Technical Summary
The existing double-layer steel sheet pile cofferdam cannot be inserted into the steel sheet pile when spanning the existing structure, resulting in the inability to continuously construct, and the water stop and overturn resistance of conventional earth and stone cofferdams in this case are deteriorated.
Non-insert double-layer steel sheet pile cofferdam and corresponding construction methods are adopted, and components such as clay seats, limit frames, cow legs, purlins and tie rods are used to ensure the stability of steel sheet piles through clay filling and layering. and connectivity, forming a monolithic structure and reducing the footprint through specific demolition steps.
The continuous construction of double-layer steel sheet pile cofferdams in the case of spanning existing structures has been achieved, which significantly reduces the cofferdam's footprint and improves water stop and overturn resistance.
Smart Images

Figure CN119021253A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cofferdam construction, in particular to a non-insertion type double-layer steel sheet pile cofferdam and a construction method thereof. Background Art
[0002] With the development of society, municipal infrastructure is constantly being improved and updated. For example, when tunnels are constructed under existing rivers using the open-cut method, due to the needs of navigation and flood discharge, river-related construction generally adopts the method of alternating cofferdam construction in stages. Conventional cofferdam methods mainly use earth-rock cofferdams or double-layer steel sheet pile cofferdams. Compared with earth-rock cofferdams, double-layer steel sheet pile cofferdams occupy a small area and have little impact on the river channel. They can ensure the width of the river channel, and the cofferdam has good water-stopping and anti-overturning performance. However, the second-phase cofferdam spans over the existing structures completed in the first phase, and steel sheet piles cannot be driven into the soil within the scope of the existing structures. The double-layer steel sheet pile cofferdam cannot be continuous. According to conventional practices, earth-rock cofferdams can be used to connect the inserted steel sheet pile cofferdams on both sides, but the land occupation, water-stopping and anti-overturning performance are reduced. Therefore, there is an urgent need for a non-inserted double-layer steel sheet pile cofferdam that spans over the existing structure and connects the inserted double-layer steel sheet pile cofferdams on both sides to form a whole. Summary of the invention
[0003] In view of the above-mentioned prior art, the present invention proposes a non-insertion type double-layer steel sheet pile cofferdam and a construction method thereof.
[0004] The present invention provides a non-insertion type double-layer steel sheet pile cofferdam, comprising: a clay seat, wherein the clay seat is used to insert the double-layer steel sheet pile cofferdam, the bottom of the double-layer steel sheet pile cofferdam is located inside the clay seat and a limiting frame is arranged, and the top of the double-layer steel sheet pile cofferdam is connected by a plurality of tie rods.
[0005] Preferably, the double-layer steel sheet pile cofferdam includes two rows of non-insertion steel sheet piles, and corbels are arranged on the outer sides of the tops of the non-insertion steel sheet piles. Purlins are arranged on the upper ends of the corbels on each side, and the purlins on both sides are connected by a plurality of tie rods.
[0006] Preferably, the limiting frame is configured as a U-shaped structure, including a bottom plate, both side ends of the bottom plate are provided with channel steel trusses, and both outer side ends of the limiting frame are provided with a plurality of limiting steel bars.
[0007] Preferably, the tie rod is made of round steel and is evenly arranged at a certain pitch along the direction of the non-inserted steel sheet piles, and is used to tie the purlins on both sides of the double-layer steel sheet pile cofferdam; two sections of round steel with the same diameter are symmetrically welded at both ends of the tie rod to limit the position of the tie rod.
[0008] Preferably, the corbels are made of steel plates and have a trapezoidal structure. They are evenly arranged at a certain step distance along the direction of the non-insertion steel sheet piles and are fully welded to the non-insertion steel sheet piles.
[0009] Preferably, the enclosure purlin is made of double-jointed channel steel, and the segments of the enclosure purlin are fully welded to each other.
[0010] Preferably, the channel steel truss includes a plurality of vertical channel steels, and three horizontal channel steels and one oblique channel steel are arranged between adjacent vertical channel steels.
[0011] The present invention also provides a construction method for the non-insertion type double-layer steel sheet pile cofferdam, comprising the following steps: Step 1: Make a limit frame, locate and place the limit frame according to the plane position of the cofferdam. After the position of the limit frame is determined, set limit steel bars on both sides to limit the horizontal movement of the limit frame; Step 2: Backfill the clay base. Determine the width of the top platform of the clay base according to the plane position of the cofferdam, fill and compact in layers, and fill and compact symmetrically within the range of the limit frame to avoid displacement or deformation of the limit frame. Step 3: Non-insertion steel sheet piles are driven in. Before and after clay filling, the elevation of the non-insertion steel sheet piles at the bottom of the limit frame and the top of the clay seat, as well as the plane position of the limit frame, are accurately measured. The driving depth of the non-insertion steel sheet piles is calculated, and the plane position of the non-insertion steel sheet piles is marked and marked. The driving elevation of the non-insertion steel sheet piles is accurately controlled, and they are firmly connected to the inserted steel sheet piles on both sides through the lock to form a whole. Step 4: The corbels, purlins and tie rods are installed in sequence. The corbels are fully welded and firmly connected to the non-inserted steel sheet piles. The purlins are placed continuously. The segments of the purlins are fully welded to form a whole. The tie rod installation position opens holes for the non-inserted steel sheet piles and purlins, and two sections of round steel with the same diameter are symmetrically welded at both ends of the tie rod to limit the tie rod; Step 5: Dig out and clean the excess soil on the water-facing surface of the clay seat; Step 6: Cover the back slope of the clay seat with rain cloth for protection; Step 7: After the double-layer steel sheet pile cofferdam is completed, the construction content inside the cofferdam will be carried out, and after the construction is completed, the cofferdam removal stage will begin; Step 8: Remove the tie rods, purlins and corbels. The cofferdam is removed in sections. Remove the tie rods, purlins and corbels in sections accordingly. Use gas cutting to cut the sections. Step 9: Pull out the non-inserted steel sheet piles. The removal of the non-inserted steel sheet piles is carried out in sections synchronously with the removal of the tie rods and the surrounding purlins. First, pull out the non-inserted steel sheet piles on the water-facing surface, and then pull out the non-inserted steel sheet piles on the back water surface. When removing the non-inserted steel sheet piles on the water-facing surface, first disconnect the tie rods, and then pull out the non-inserted steel sheet piles. After all the non-inserted steel sheet piles in each section are pulled out, cut and remove the surrounding purlins in each section. Step 10: After all non-insertion steel sheet piles are removed, the clay seat is excavated from the water-facing side to the water-receiving side, and the limit frame is salvaged simultaneously; Step 11: During the excavation of the clay seat, the limit frame is salvaged simultaneously. After the salvage is completed, the limit frame components are disassembled and reused by gas cutting; Step 12: Clean the riverbed.
[0012] Preferably, in step 3, the lock mouth is cleaned and buttered before the non-insertion steel sheet pile is driven.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows: in order to solve the problem that the inserted double-layer steel sheet pile cofferdam cannot be continuous when crossing over the existing structure, the present invention proposes a non-inserted double-layer steel sheet pile cofferdam and a construction method that crosses over the existing structure, which can solve the problem that the inserted double-layer steel sheet pile cofferdam cannot be continuous when crossing over the existing structure, and compared with the conventional earth-rock cofferdam, the cofferdam footprint is significantly reduced, the width of the river channel is guaranteed, and the water-stopping and anti-overturning performance of the cofferdam is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 Schematic diagram of the clay filling stage in an embodiment of the present invention.
[0015] Figure 2 It is a schematic diagram of the use stages of the non-insertion type double-layer steel sheet pile cofferdam in an embodiment of the present invention.
[0016] Figure 3 It is a schematic diagram of the connection between the non-inserted double-layer steel sheet pile cofferdam and the inserted double-layer steel sheet pile cofferdam in an embodiment of the present invention.
[0017] Figure 4 Schematic diagram of the cross section of the limiting frame in the embodiment of the present invention.
[0018] Figure 5 It is a schematic longitudinal section diagram of the limiting frame in the embodiment of the present invention.
[0019] In the figure: 1. Clay base; 2. Limiting frame; 3. Limiting steel bar; 4. Non-inserted steel sheet pile; 5. Corbel; 6. Purlin; 7. Pull rod; 8. Waterproof tarpaulin; 9. Inserted steel sheet pile; 10. Vertical channel steel; 11. Horizontal channel steel; 12. Oblique channel steel; 13. Steel plate. DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.
[0021] Example: Figure 1-5As shown, a non-insertion type double-layer steel sheet pile cofferdam includes: a trapezoidal clay seat 1, the clay seat 1 is made of clay with little sand and stickiness, with a layered filling and compaction construction process, and has very low water permeability. The clay seat 1 is used to insert the double-layer steel sheet pile cofferdam. The clay seat 1 is one of the main bodies of the cofferdam, and plays the role of resisting water pressure and stopping water.
[0022] Furthermore, the double-layer steel sheet pile cofferdam includes two rows of non-inserted steel sheet piles 4, which are not penetrated into the soil, are located above the existing structure, stand upright on the riverbed protection, and are connected with the inserted steel sheet piles at both ends to form a whole. A corbel 5 is arranged on the outer side of the top of the non-inserted steel sheet pile 4, and a purlin 6 is arranged on the upper end of each corbel 5, and the purlins 6 on both sides are connected by a plurality of tie rods 7. The corbel 5, the purlin 6 and the tie rod 7 are used to limit the top of the non-inserted steel sheet pile 4.
[0023] The tie rod 7 is made of round steel and is evenly arranged at a certain step distance along the direction of the non-inserted steel sheet piles 4, and is used to tie the purlins 6 on both sides of the double-layer steel sheet pile cofferdam; two sections of round steel with the same diameter are symmetrically welded at both ends of the tie rod 7 to limit the tie rod 7. The corbel 5 is made of steel plate and has a trapezoidal structure. It is evenly arranged at a certain step distance along the direction of the non-inserted steel sheet piles 4 and is fully welded to the non-inserted steel sheet piles 4. The purlin 6 is made of double-jointed channel steel, and the segments of the purlin 6 are fully welded to ensure the integrity between the steel sheet piles and between the non-inserted and inserted steel sheet pile cofferdams.
[0024] Furthermore, a limiting frame 2 is arranged at the bottom of the double-layer steel sheet pile cofferdam inside the clay seat 1. The limiting frame 2 is arranged as a U-shaped structure, including a fully covered bottom plate 13, and channel steel trusses are arranged at both ends of the bottom plate 13. The channel steel trusses include several vertical channel steels 10, and three horizontal channel steels 11 and one oblique channel steel 12 are arranged between adjacent vertical channel steels 10. Several limiting steel bars 3 are arranged at both outer ends of the limiting frame 2. When the span of the cofferdam is large, the limiting frame 2 is manufactured and installed in sections to control its own weight.
[0025] The construction method of the non-insertion type double-layer steel sheet pile cofferdam comprises the following steps: Step 1: Make the limit frame 2, and fully weld the components to ensure the rigidity of the limit frame 2. Position and place the limit frame 2 according to the plane position of the cofferdam. After the position of the limit frame 2 is determined, limit steel bars 3 are set on both sides to limit the horizontal movement of the limit frame 2. Step 2: Backfill the clay base 1, determine the width of the top platform of the clay base 1 according to the plane position of the cofferdam, fill and compact in layers, and fill and compact symmetrically within the range of the limit frame 2 to avoid displacement or deformation of the limit frame 2; Step 3: The non-insertion steel sheet pile 4 is inserted and driven. Before and after the clay is filled, the elevation of the non-insertion steel sheet pile 4 at the bottom of the limit frame 2 and the top of the clay seat 1, as well as the plane position of the limit frame 2 are accurately measured, the driving depth of the non-insertion steel sheet pile is calculated, and the plane position of the non-insertion steel sheet pile is set out, and marked with red paint to accurately control the driving elevation of the non-insertion steel sheet pile 4. Before the non-insertion steel sheet pile 4 is inserted and driven, the lock mouth is cleaned and butter is applied to reduce the insertion resistance, and it is firmly connected with the inserted steel sheet piles 9 on both sides through the lock mouth to form a whole; Step 4: The corbel 5, the purlin 6, and the tie rod 7 are installed in sequence. The corbel 5 is fully welded and firmly connected to the non-inserted steel sheet pile 4. The purlin 6 is placed continuously. The segments of the purlin 6 are fully welded to form a whole. The installation position of the tie rod 7 opens holes for the non-inserted steel sheet pile 4 and the purlin 6, and two sections of round steel with the same diameter are symmetrically welded at both ends of the tie rod 7 to limit the tie rod 7. Step 5: Use a long-arm excavator to dig out and clean the excess earth on the water-facing surface of the clay seat 1; Step 6: To ensure the stability of the clay slope, the back-water slope of the clay base 1 is covered with a waterproof rain cloth 8 for protection to prevent the slope from being unstable due to rain erosion; Step 7: After the double-layer steel sheet pile cofferdam is completed, the construction content inside the cofferdam will be carried out, and after the construction is completed, the cofferdam removal stage will begin; Step 8: Remove the tie rod 7, the purlin 6, and the corbel 5. The cofferdam is removed in sections. The tie rod 7, the purlin 6, and the corbel 5 are removed in sections accordingly. Gas cutting is used for cutting and segmentation. Step 9: Pull out the non-inserted steel sheet piles 4. The removal of the non-inserted steel sheet piles 4 is carried out synchronously with the removal of the tie rods 7 and the surrounding purlins 6 in sections. The non-inserted steel sheet piles 4 on the water-facing surface are first pulled out, and then the non-inserted steel sheet piles 4 on the back surface are pulled out. When pulling out the non-inserted steel sheet piles 4 on the water-facing surface, the tie rods 7 are first disconnected, and then the non-inserted steel sheet piles 4 are pulled out. After all the non-inserted steel sheet piles 4 in each section are pulled out, the surrounding purlins 6 in each section are cut and removed. Step 10: After all the non-insertion steel sheet piles 4 are removed, the clay seat 1 is excavated using a long-arm excavator, and the excavation is carried out from the water-facing side to the water-receiving side, and the limit frame 2 is salvaged simultaneously; Step 11: During the excavation of the clay seat 1, the limit frame 2 is salvaged by a long-arm excavator. After the salvage is completed, the limit frame components are disassembled and reused by gas cutting; Step 12: Clean the riverbed.
[0026] The non-inserted double-layer steel sheet pile cofferdam and its construction method of this embodiment can solve the problem of discontinuity of the inserted double-layer steel sheet pile cofferdam across the existing structure, and compared with the conventional earth-rock cofferdam, it significantly reduces the area occupied by the cofferdam, ensures the width of the river channel, and improves the water-stopping and anti-overturning performance of the cofferdam.
[0027] The above are only implementation modes of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure made using the contents of the present invention's specification and drawings, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present invention.
Claims
1. A non-insertion double-layer steel sheet pile cofferdam, characterized in that: include: A clay seat is used to insert a double-layer steel sheet pile cofferdam, the bottom of the double-layer steel sheet pile cofferdam is located inside the clay seat and a limiting frame is arranged, and the top of the double-layer steel sheet pile cofferdam is connected by a plurality of tie rods.
2. The non-insertion type double-layer steel sheet pile cofferdam according to claim 1, characterized in that: The double-layer steel sheet pile cofferdam includes two rows of non-insertion steel sheet piles, and the top outer sides of the non-insertion steel sheet piles are provided with corbels. The upper ends of the corbels on each side are provided with purlins, and the purlins on both sides are connected by a plurality of tie rods.
3. The non-insertion type double-layer steel sheet pile cofferdam according to claim 1, characterized in that: The limiting frame is configured as a U-shaped structure, including a bottom plate, both side ends of the bottom plate are provided with channel steel trusses, and both outer side ends of the limiting frame are provided with a plurality of limiting steel bars.
4. The non-insertion type double-layer steel sheet pile cofferdam according to claim 1, characterized in that: The tie rod is made of round steel and is evenly arranged at a certain pitch along the direction of the non-inserted steel sheet piles, and is used to tie the purlins on both sides of the double-layer steel sheet pile cofferdam; two sections of round steel with the same diameter are symmetrically welded at both ends of the tie rod to limit the tie rod.
5. The non-insertion type double-layer steel sheet pile cofferdam according to claim 2, characterized in that: The corbels are made of steel plates and have a trapezoidal structure. They are evenly arranged at a certain step distance along the direction of the non-insertion steel sheet piles and are fully welded to the non-insertion steel sheet piles.
6. The non-insertion type double-layer steel sheet pile cofferdam according to claim 2, characterized in that: The surrounding purlin is made of double-jointed channel steel, and the segments of the surrounding purlin are fully welded.
7. The non-insertion type double-layer steel sheet pile cofferdam according to claim 3, characterized in that: The channel steel truss comprises a plurality of vertical channel steels, and three horizontal channel steels and one oblique channel steel are arranged between adjacent vertical channel steels.
8. The construction method of the non-insertion type double-layer steel sheet pile cofferdam according to any one of claims 1 to 7 is characterized in that: The steps include: Step 1: Make a limit frame, locate and place the limit frame according to the plane position of the cofferdam. After the position of the limit frame is determined, set limit steel bars on both sides to limit the horizontal movement of the limit frame; Step 2: Backfill the clay base. Determine the width of the top platform of the clay base according to the plane position of the cofferdam, fill and compact in layers, and fill and compact symmetrically within the range of the limit frame to avoid displacement or deformation of the limit frame. Step 3: Non-insertion steel sheet piles are driven in. Before and after clay filling, the elevation of the non-insertion steel sheet piles at the bottom of the limit frame and the top of the clay seat, as well as the plane position of the limit frame, are accurately measured. The driving depth of the non-insertion steel sheet piles is calculated, and the plane position of the non-insertion steel sheet piles is marked and marked. The driving elevation of the non-insertion steel sheet piles is accurately controlled, and they are firmly connected to the inserted steel sheet piles on both sides through the lock to form a whole. Step 4: The corbels, purlins and tie rods are installed in sequence. The corbels are fully welded and firmly connected to the non-inserted steel sheet piles. The purlins are placed continuously. The segments of the purlins are fully welded to form a whole. The tie rod installation position opens holes for the non-inserted steel sheet piles and purlins, and two sections of round steel with the same diameter are symmetrically welded at both ends of the tie rod to limit the tie rod; Step 5: Dig out and clean the excess soil on the water-facing surface of the clay seat; Step 6: Cover the back slope of the clay seat with rain cloth for protection; Step 7: After the double-layer steel sheet pile cofferdam is completed, the construction content inside the cofferdam will be carried out, and after the construction is completed, the cofferdam removal stage will begin; Step 8: Remove the tie rods, purlins and corbels. The cofferdam is removed in sections. Remove the tie rods, purlins and corbels in sections accordingly. Use gas cutting to cut the sections. Step 9: Pull out the non-inserted steel sheet piles. The removal of the non-inserted steel sheet piles is carried out in sections synchronously with the removal of the tie rods and the surrounding purlins. First, pull out the non-inserted steel sheet piles on the water-facing surface, and then pull out the non-inserted steel sheet piles on the back water surface. When removing the non-inserted steel sheet piles on the water-facing surface, first disconnect the tie rods, and then pull out the non-inserted steel sheet piles. After all the non-inserted steel sheet piles in each section are pulled out, cut and remove the surrounding purlins in each section. Step 10: After all non-insertion steel sheet piles are removed, the clay seat is excavated from the water-facing side to the water-receiving side, and the limit frame is salvaged simultaneously; Step 11: During the excavation of the clay seat, the limit frame is salvaged simultaneously. After the salvage is completed, the limit frame components are disassembled and reused by gas cutting; Step 12: Clean the riverbed.
9. The construction method according to claim 8, characterized in that: In step 3, the lock mouth is cleaned and butter is applied before the non-insertion steel sheet pile is driven.