Small-caliber rain and sewage pipeline original well renewal drilling machine complete equipment and construction method
By designing a micro top drilling rig, the problems of high construction difficulty, long construction period and high cost in the construction of small-diameter rainwater and sewage pipelines are solved, and efficient pipeline updates are achieved in the original work well, reducing labor costs and improving success rate , ensuring smooth and safe construction.
Patent Information
- Application Number
- CN202411016477.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-07-28
AI Technical Summary
The existing technology has problems such as high construction difficulty, long construction period, high cost, high safety hazards and low success rate in the in-situ renewal of small-diameter rainwater and sewage pipelines. In particular, ordinary construction equipment cannot carry out rotary cutting and crushing construction in the original work well. Impacts construction efficiency and safety.
A complete set of equipment for the original well renewal drilling rig of small-diameter rain and sewage pipelines is designed, including a miniature top drilling rig, which is composed of base assembly, bracket assembly, powertrain and guide drill rod. It is assembled in a detachable manner and can enter the small In the working well, the push-pull cylinder and hydraulic system are used to rotate and move the guide drill bit and rotary cutting and crushing reamer to achieve the renewal of the pipeline.
It realizes efficient pipeline renewal in the original work well, reduces construction labor costs, ensures construction smoothness and safety, greatly improves construction success rate, and reduces the impact on traffic and environment.
Smart Images

Figure CN119021707A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of in-situ renewal construction of rainwater and sewage pipelines, and in particular relates to a complete set of drilling rig equipment and a construction method for in-situ renewal of small-diameter rainwater and sewage pipelines. Background Art
[0002] Underground pipelines are an important part of urban infrastructure. With the rapid development of my country's economy, the urbanization process has accelerated, and the scale of cities has gradually expanded. The huge and complex municipal drainage pipeline network, as an indispensable and important part of modern cities, shoulders the important task of transmitting and transporting rainwater and sewage throughout the city day and night.
[0003] In the daily construction and operation and maintenance of the municipal pipe network, the method of excavation and re-burying pipes was generally used in the past to build and update municipal pipes, resulting in frequent "disembowelment" of urban roads, which seriously affected urban traffic and the lives of surrounding residents. With the progress of urbanization, urban underground pipelines are complicated and the load of urban roads is becoming more and more serious, resulting in structural defects such as rupture, deformation, misalignment, and disconnection in drainage pipes, which seriously affect the structural safety of the pipes, leading to hollows in the weak parts of the pipes and road collapse. If they are not repaired for a long time, the soil in the hollow parts of the pipes is easy to lose, leading to safety hazards such as ground subsidence, rupture and sudden collapse. At the least, it pollutes groundwater and seriously affects the water flow capacity of the pipes. At the worst, it causes sewage to overflow from the working well, affecting the appearance of the city and the surrounding environment, causing waterlogging during heavy rains, and even traffic paralysis.
[0004] With the advancement of urbanization and the popularization of municipal pipe networks, the difficulty of open excavation construction of pipelines has increased, bringing greater challenges to construction. Finding fast and effective construction equipment and construction technology is the key to solving the problem. For the replacement of small-diameter rainwater and sewage pipes below φ500mm, it is necessary to replace the new pipe without destroying the original working well. At present, the following methods are generally used for construction: 1. Trenchless steel ring repair process ① The trenchless steel ring repair process is less affected by the environment and uses the original working well. It only needs to close the corresponding material and equipment stacking locations. Taking the repair of DN400 pipeline as an example, it is necessary to go down the well manually to remove the earth around the original old pipeline, put on a DN800 steel ring, and push it in sections, which has a certain impact on the surrounding pipelines, and manual excavation poses a safety hazard.
[0005] ② The trenchless steel ring repair process does not involve road excavation and has no impact on the appearance of the road. In terms of construction period, the trenchless steel ring repair process requires a longer construction period. Taking 100 meters as an example, because it is manual excavation and the working space is limited, the construction period takes 60 days.
[0006] ③ The trenchless steel ring repair process requires chemical grouting soil solidification + DN800 steel ring sheath, laying of DN400 double-wall corrugated pipe and gap filling, and finally pull-in CIPP ultraviolet light curing, and the project cost is relatively high.
[0007] 2. Short pipe lining method ① The short pipe lining repair process is less affected by the environment. It uses the original working well for operation. It only needs to close the corresponding material and equipment stacking locations. Taking the repair of DN400 pipeline as an example, a push device is set up in the well manually to push in a small-diameter pipeline. The short pipe is generally one level smaller than the original pipeline in diameter, and its service life is similar to that of the original pipeline, but the cross-sectional loss is large, and debris is easily deposited at the interface, which will affect its use over time.
[0008] ② The short tube lining method repair does not require road excavation and has no impact on the appearance of the road surface. The short tube lining method repair requires a shorter construction period.
[0009] ③ The short pipe lining method requires chemical grouting to solidify the soil, including pipeline inspection and dredging, laying of a smaller diameter HDPE pipe, and injecting cement slurry to fill the gaps between the new and old pipes.
[0010] 3. Horizontal Directional Drilling Drag Pipe Method ① The process of dragging and replacing new pipes with horizontal directional drilling rigs has a certain impact on the environment. It requires digging a working pit and corresponding space for stacking materials, which has a great impact on road traffic. This process is constructed along the route of the old pipeline and will not affect adjacent pipelines.
[0011] ② There needs to be a bevel section, which has high requirements on the site, and the drilling holes in the bevel section need to be grouting filled. In terms of construction period, trenchless repair requires a shorter construction period.
[0012] ③Non-excavation in-situ replacement of new pipes with the same diameter, including pipeline inspection and dredging, has a general project cost.
[0013] 4. Fragmented tube method The pipe-breaking method is a pipeline renewal technology that uses pipe-breaking equipment to cut the original pipe from the inside, then uses an expansion head to expand it, squeezes the original pipe fragments into the surrounding soil to form a pipe hole, and simultaneously pulls in a new pipe.
[0014] This process only requires partial excavation of the working surface, has little traffic impact, and is fast in construction. It reduces the inconvenience of traffic caused by municipal construction, and reduces the impact on nearby residents while completing the project quickly. However, it has the following shortcomings: ① The construction success rate is low, generally around 50%. Once the construction fails, remedial measures such as opening the skylight must be taken, which has a great impact on traffic and the surrounding environment; ②The vibration generated during the pipe cracking process may affect surrounding facilities; ③Expanding soil may cause construction difficulties and road surface arching, etc.
[0015] Therefore, it is necessary to provide a complete set of equipment and construction method for updating the original well drilling rig of small-diameter rain and sewage pipes for use in the daily construction and operation and maintenance of underground pipe networks. Summary of the invention
[0016] The embodiment of the present invention provides a complete set of drilling equipment and a construction method for updating an original well of a small-diameter rainwater and sewage pipeline, so as to solve the problems in the prior art.
[0017] The embodiment of the present invention adopts the following technical scheme: a complete set of equipment for updating the original well of small-diameter rainwater and sewage pipelines, including a micro-pull top drilling rig, the micro-pull top drilling rig including a base assembly, a bracket assembly, a power assembly and a guide drill rod, The base assembly is arranged horizontally, the bracket assembly is connected to the base assembly, the power assembly is connected to the bracket assembly, the bracket assembly can drive the power assembly to move horizontally, the guide drill rod is connected to the power assembly, and the power assembly drives the guide drill rod to rotate; The base assembly is provided with four vertically arranged side fixing seat assemblies; A detachable guide drill bit is provided at the front of the guide drill rod, and a pipeline renewal device is provided at the front of the guide drill bit.
[0018] Further, the bracket assembly includes two track shafts detachably mounted on the base assembly and a push-pull cylinder disposed at the center of the base assembly; The two track shafts are provided with a slidingly connected bracket, and the telescopic end of the push-pull oil cylinder is connected to the bracket; The bracket is provided with a detachable connecting seat, the connecting seat is provided with a pin shaft, and the power assembly is fixed on the connecting seat through the pin shaft; The base assembly is provided with front and rear tightening screws.
[0019] Further, the power assembly includes a gearbox, a power head, two front-end motors and two rear-end motors symmetrically arranged on the gearbox; The guide drill rod is arranged on the power head, and the guide drill rod is driven to rotate by two front-end motors and two rear-end motors.
[0020] Furthermore, the gear box is also provided with a rotary control valve, a push-pull control valve, a dual-speed valve group assembly and a pressure reducing valve group assembly which are connected to the hydraulic pipes of the front motor and the rear motor.
[0021] Furthermore, a water shaft assembly is provided on the gear box on the other side of the guide drill rod.
[0022] Furthermore, the pipeline renewal device includes an octagonal sleeve rod, a compound rotary cutting and crushing reamer, a female buckle pull box, a concave and convex shaft, a pressing plate and a pipe loading cylinder; The octagonal sleeve rod is connected to the guide drill bit, and the composite rotary cutting, crushing and reaming device is connected to the octagonal sleeve rod; The compound rotary cutting, crushing and reaming device is equipped with a transfer gear and a tube pulling head, and the pull head on the tube pulling head is connected to the female buckle pull box; The female buckle pull box is connected to the concave-convex shaft, and the pipe loading cylinder is connected to the pressing plate.
[0023] Furthermore, left and right tightening screws are installed on the side fixing seat assembly.
[0024] A construction method for a complete set of drilling equipment for updating an original well of a small-diameter rainwater and sewage pipeline, the construction method comprising the following steps: S1: Widening of the working well: widen the bottom of the working well to a diameter of 1200mm and reinforce it; S2: Installation and adjustment of the base assembly; hoist the base assembly and the bracket connector into the working well, adjust the elevation, direction and slope of the base assembly and the bracket connector according to the original old pipeline trajectory, adjust the front and rear tightening screws to fix the base assembly, and fix the base assembly and the bracket connector; S3: Installation of the side fixing seat assembly: hoist the four side fixing seat assemblies into the working well, connect the side fixing seat assembly with the base assembly with bolts and lock them, rotate the screw on the side fixing seat assembly to further fix the base assembly, etc.; S4: Installation of the power head assembly: hoist the power head assembly including the rear motor into the working well, connect the power head assembly to the bracket assembly with a pin and tighten them with a round nut; S5: Front-end motor installation: hoist the front-end motor into the working well and install it into the power head assembly. S6: Connect the hydraulic pipes between the drilling rig and the hydraulic station; connect the hydraulic pipes between the motor and the two-speed valve assembly, and connect the hydraulic pipes and water pipes between the micro-pull top drilling rig and the hydraulic station; S7: Check whether all parts of the micro pull-top drill are installed properly, whether all hydraulic pipes are connected properly, and whether the whole machine is fixed intact; S8: After confirmation, start the hydraulic station and conduct a trial run of the micro-pull top drilling rig; S9: Install the guide drill rod and the guide drill bit, operate the rotary control valve and the push-pull control valve of the micro-pull top drilling rig, and make the guide drill bit and the guide drill rod move forward along the old pipeline trajectory toward the receiving well; S10: After the guide drill bit and the guide drill rod arrive at the receiving well, the guide drill bit is removed, and the Bafang sleeve rod and the compound rotary cutting and crushing reamer are installed respectively, and the rotary control valve and the push-pull control valve of the micro-pull top drilling rig are operated to make the compound rotary cutting and crushing reamer advance along the trajectory of the old pipeline toward the working well while rotary cutting and crushing the old pipeline; S11: After the reamer reaches the edge of the receiving well, a female buckle pull box, a new pipe section, and a concave-convex shaft are installed on one end of the pipe pulling head on the compound rotary cutting and crushing reamer, and the new pipe is pressed into the positioning ring on the pipe pulling head by using a pipe loading cylinder and a pressing plate; S12: Operate the rotary control valve and the push-pull control valve of the micro-pull top drilling rig to make the compound rotary cutting, crushing and reaming device advance along the trajectory of the old pipeline toward the working well, rotary cutting and crushing the old pipeline, and pull the new pipeline into the working well; S13: After completing the replacement construction of a new pipe section, remove the pipe loading cylinder and the pressing plate, install a new pipe section and the concave-convex shaft, use the pipe loading cylinder and the pressing plate to press the new pipe into the previous new pipe section, operate the rotary control valve and the push-pull control valve of the micro-pull top drilling rig, so that the compound rotary cutting and crushing reamer advances along the trajectory of the old pipe toward the working well, rotary cutting and crushing the old pipe, and pulls the new pipe into the working well; S14: Repeat step S11 until all old pipe replacement construction is completed; S15: The old pipeline is replaced, the equipment is dismantled, and the equipment is removed from the site; S16: Clean the pipeline and inspect the pipeline.
[0025] At least one of the above technical solutions adopted in the embodiments of the present invention can achieve the following beneficial effects: The micro-pull top drilling rig of the present invention has a compact structure. The base assembly, the bracket assembly, the power assembly and the guide drill rod are all independent components, which are assembled into one in a detachable manner and can enter a smaller working well for work. The forward and backward movement of the bracket assembly of the present invention is achieved by a push-pull cylinder, which eliminates the need for a drive device and saves space for rig layout. The present invention can solve the problem that ordinary construction equipment cannot perform rotary cutting and crushing construction in the original working well during construction, ensure that the replacement of old underground pipelines with new pipes meets the design requirements, and at the same time ensure smooth pipeline construction, greatly reducing labor costs during construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings: Figure 1 The micro-pull top drilling machine structure of the present invention is shown in FIG. Figure 1 ; Figure 2 The micro-pull top drilling machine structure of the present invention is shown in FIG. Figure 2 ; Figure 3 It is an exploded schematic diagram of the micro top drilling rig of the present invention; Figure 4 It is a structural schematic diagram of the base assembly and the bracket assembly of the present invention; Figure 5 A schematic diagram of the construction of the present invention; Figures 6 to 9 It is a schematic diagram of the steps of the construction method of the present invention; Reference numerals
[0027] Base assembly 1, bracket assembly 2, track shaft 21, push-pull cylinder 22, bracket 23, connecting seat 24, front and rear tightening screws 25, pin shaft 26, power assembly 3, front end motor 31, rear end motor 32, gear box 33, power head 34, hydraulic station 35, guide drill rod 4, guide drill bit 41, water shaft assembly 5, octagonal sleeve rod 6, compound rotary cutting and crushing reamer 7, female buckle pull box 8, concave and convex shaft 9, pressure plate 10, pipe loading cylinder 11, small hydraulic station 111, side fixed seat assembly 12, receiving well 13, working well 14, left and right tightening screws 15, rotary control valve 16, push-pull control valve 17, two-speed valve group assembly 18, new pipeline 19, old pipeline 20. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the specific embodiments of the present invention and the corresponding drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0029] The technical solutions provided by various embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.
[0030] Reference Figures 1 to 9 As shown, an embodiment of the present invention provides a complete set of drilling equipment for updating the original well of a small-diameter rainwater and sewage pipeline, including a micro-pull top drilling rig, wherein the micro-pull top drilling rig includes a base assembly 1, a bracket assembly 2, a power assembly 3 and a guide drill rod 4. The base assembly 1 is arranged horizontally, the bracket assembly 2 is connected to the base assembly 1, the power assembly 3 is arranged on the bracket assembly 2, the bracket assembly 2 can drive the position of the power assembly 3 to move horizontally, the guide drill rod 4 is connected to the power assembly 3, and the power assembly 3 drives the guide drill rod 4 to rotate; The base assembly 1 is provided with four vertically arranged side fixing seat assemblies 12; the side fixing seat assembly 12 is provided with a connecting angle plate, the connecting angle plate is provided with a screw hole, the side fixing seat assembly 12 is provided with a screw hole, the side fixing seat assembly 12 is fastened to the base assembly 1 by bolts, and the side fixing seat assembly 12 is installed with left and right tightening screws 15, and the left and right tightening screws 15 limit the movement of the drilling rig in the left and right directions; A detachable guide drill bit 41 is provided at the front of the guide drill rod 4 , and a pipeline renewal device is provided at the front of the guide drill bit 41 .
[0031] During use, the pipeline between the receiving well 13 (the original municipal pipeline working well) and the working well 14 (the original municipal pipeline working well) is updated (refer to Figure 5 as shown).
[0032] The base assembly 1, bracket assembly 2, power assembly 3 and guide drill rod 4 of the micro pull-top drill rig of the present invention are all independent components, which are assembled into one in a detachable manner and can enter a smaller working well 14 for work. The present invention can solve the problem that ordinary construction equipment cannot enter the original working well 14 for rotary cutting and crushing construction during construction, ensure that the replacement of the old underground pipeline 20 with the new pipe meets the design requirements, and at the same time ensure the smoothness of the pipeline construction, greatly reducing the labor cost during construction.
[0033] Preferably, the bracket assembly 2 includes two track shafts 21 detachably mounted on the base assembly 1 and a push-pull cylinder 22 arranged at the center position of the base assembly 1; the two track shafts 21 are provided with a slidingly connected bracket 23, and the telescopic end of the push-pull cylinder 22 is connected to the bracket 23; the bracket 23 is provided with a detachable connecting seat 24, and the connecting seat 24 is provided with a pin shaft 26, and the power assembly 3 is fixed to the connecting seat 24 through the pin shaft 26; the base assembly 1 is provided with front and rear tightening screws 25.
[0034] During use, the push-pull cylinder 22 will drive the bracket 23 to move horizontally on the two track shafts 21. During the movement, the bracket 23 will drive the guide drill bit 41 on the guide drill rod 4 to rotate, thereby driving the composite rotary cutting, crushing and reaming device 7 to rotate and crush the old pipe 20.
[0035] Preferably, the power assembly 3 includes a gear box 33, a power head 34, two front-end motors 31 and two rear-end motors 32 symmetrically arranged on the gear box 33; the guide drill rod 4 is arranged on the power head 34, and the guide drill rod 4 is driven to rotate by the two front-end motors 31 and the two rear-end motors 32; when the two front-end motors 31 and the two rear-end motors 32 work at the same time, they will drive the guide drill rod 4 to rotate, providing power output for the guide drill rod 4.
[0036] Preferably, the gear box 33 is also provided with a rotary control valve 16, a push-pull control valve 17, a dual-speed valve group assembly 18 and a pressure reducing valve group assembly which are connected to the hydraulic pipes of the front motor 31 and the rear motor 32.
[0037] Preferably, a water shaft assembly 5 is provided on the gear box 33 at the other side of the guide drill rod 4; the water shaft assembly 5 is connected to the outlet pipe of the mud pump, and the mud passes through it during construction.
[0038] Preferably, the pipeline renewal device comprises an octagonal sleeve rod 6, a compound rotary cutting and crushing reamer 7, a female buckle pull box 8, a concave-convex shaft 9, a pressing plate 10 and a pipe loading cylinder 11, wherein the octagonal sleeve rod 6 is connected to the guide drill bit 41, the compound rotary cutting and crushing reamer 7 is connected to the octagonal sleeve rod 6, a transfer gear and a pipe pulling head are installed on the compound rotary cutting and crushing reamer 7, the pulling head on the pipe pulling head is connected to the female buckle pull box 8, the female buckle pull box 8 is connected to the concave-convex shaft 9, and the pipe loading cylinder 11 is connected to the pressing plate 10. The pipe loading cylinder 11 is connected to a small hydraulic station 111.
[0039] The new pipe 19 is installed on the pipe positioning ring on the pipe pulling head, and the new pipe 19 is pressed on the pipe pulling head by the pressing plate 10 and the pipe loading cylinder 11. The new pipe 19 replaces the original old pipe 20 while the composite rotary cutting and crushing reamer 7 excavates and expands the hole.
[0040] A construction method for a complete set of drilling equipment for updating the original well of a small-diameter rainwater and sewage pipeline, the construction method comprises the following steps: (refer to Figures 6 to 9 shown) S1: widening the working well; widening the bottom of the working well 14, which serves as the working well 14, to a diameter of 1200 mm and reinforcing it; S2: Installation and adjustment of the base assembly; hoist the base assembly 1 and the bracket 23 connector into the working well 14, adjust the elevation, direction and slope of the base assembly 1 and the bracket assembly 2 connector according to the original old pipeline 20 trajectory, adjust the front and rear tightening screws 25 to fix the base assembly 1, and fix the base assembly 1 and the bracket assembly 2 connector; S3: Installation of the side fixing seat assembly; hoist the four side fixing seat assemblies 12 into the working well 14, connect the side fixing seat assembly 12 with the base assembly 1 with bolts and lock and fix them, rotate the screw on the side fixing seat assembly 12, and further fix the base assembly 1; S4: Installation of the power head assembly; hoist the power head assembly 34 including the rear end motor 32 into the working well 14, connect the power head assembly 34 to the bracket assembly 2 with the pin 26 and tighten and fix it with a round nut; S5: Installation of the front motor 31: The front motor 31 is hoisted into the working well 14 and installed into the power head 34 assembly. S6: Connect the hydraulic pipes between the drilling rig and the hydraulic station 35; connect the hydraulic pipes between the motor and the dual-speed valve assembly 18, and connect the hydraulic pipes and water pipes between the micro-pull top drilling rig and the hydraulic station 35; S7: Check whether all parts of the micro pull-top drill are installed properly, whether all hydraulic pipes are connected properly, and whether the whole machine is fixed intact; S8: After confirmation, start the hydraulic station 35 to conduct a trial run of the micro-pull top drilling rig; S9: Install the guide drill rod 4 and the guide drill bit 41, operate the rotary control valve 16 and the push-pull control valve 17 of the micro-pull top drilling rig, so that the guide drill bit 41 and the guide drill rod 4 move forward along the trajectory of the old pipeline 20 toward the receiving well 13; S10: After the guide drill bit 41 and the guide drill rod 4 arrive at the receiving well 13, the guide drill bit 41 is removed, and the octagonal sleeve rod 6 and the compound rotary cutting and crushing reamer 7 are installed respectively, and the rotary control valve 16 and the push-pull control valve 17 of the micro-pull top drilling rig are operated to make the compound rotary cutting and crushing reamer 7 advance along the trajectory of the old pipeline 20 toward the working well 14 while rotary cutting and crushing the old pipeline 20; S11: After the reamer reaches the edge of the receiving well 13, a female buckle pull box 8, a new pipe 19, and a concave-convex shaft 9 are installed on one end of the pipe pulling head on the compound rotary cutting and crushing reamer 7, and the new pipe 19 is pressed into the positioning ring on the pipe pulling head by using the pipe loading cylinder 11 and the pressing plate 10; S12: operate the rotary control valve 16 and the push-pull control valve 17 of the micro-pull top drilling rig to make the compound rotary cutting and crushing reamer 7 advance along the trajectory of the old pipe 20 toward the working well 14, rotary cutting and crushing the old pipe 20, and pull the new pipe 19 into the working well 14; S13: After completing the replacement construction of a new pipe 19, remove the pipe loading cylinder 11 and the pressing plate 10, install a new pipe and the concave-convex shaft 9, press the new pipe 19 into the previous new pipe 19 by using the pipe loading cylinder 11 and the pressing plate 10, operate the rotary control valve 16 and the push-pull control valve 17 of the micro-pull top drilling rig, so that the compound rotary cutting and crushing reamer 7 is driven along the trajectory of the old pipe 20 toward the working well 14, while excavating and rotary cutting and crushing the old pipe 20, and pulling the new pipe 19 into the working well 14; S14: Repeat step S11 until all old pipes 20 are replaced; S15: Replacement of old pipeline 20 is completed, equipment is dismantled, and equipment is removed from the site; S16: Clean the pipeline and inspect the pipeline.
[0041] The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipelines, characterized in that: The miniature top drilling machine comprises a base assembly (1), a bracket assembly (2), a power assembly (3) and a guide drill rod (4); The base assembly (1) is arranged horizontally, the bracket assembly (2) is connected to the base assembly (1), the power assembly (3) is connected to the bracket assembly (2), the bracket assembly (2) can drive the power assembly (3) to move horizontally, the guide drill rod (4) is connected to the power assembly (3), and the power assembly (3) drives the guide drill rod (4) to rotate; The base assembly (1) is provided with four vertically arranged side fixing seat assemblies (12); A detachable guide drill bit (41) is provided at the front of the guide drill rod (4), and a pipeline renewal device is provided at the front of the guide drill bit (41).
2. According to claim 1, a complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipes is characterized by: The bracket assembly (2) comprises two track shafts (21) detachably mounted on the base assembly (1) and a push-pull cylinder (22) arranged at the center of the base assembly (1); The two track shafts (21) are provided with a slidably connected bracket (23), and the telescopic end of the push-pull oil cylinder (22) is connected to the bracket (23); The bracket (23) is provided with a detachable connecting seat (24), the connecting seat (24) is provided with a pin shaft (26), and the power assembly (3) is fixed to the connecting seat (24) via the pin shaft (26); The base assembly (1) is provided with front and rear tightening screws (25).
3. According to claim 2, a complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipes is characterized by: The power assembly (3) comprises a gear box (33), a power head (34), two front motors (31) and two rear motors (32) symmetrically arranged on the gear box (33); The guide drill rod (4) is arranged on a power head (34), and the guide drill rod (4) is driven to rotate by two front-end motors (31) and two rear-end motors (32).
4. According to claim 3, a complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipes is characterized by: The gear box (33) is also provided with a rotary control valve (16), a push-pull control valve (17), a dual-speed valve group assembly (18) and a pressure reducing valve group assembly which are connected to the hydraulic pipes of the front motor (31) and the rear motor (32).
5. According to claim 3, a complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipes is characterized by: A water shaft assembly (5) is provided on the gear box (33) on the other side of the guide drill rod (4).
6. According to claim 1, a complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipes is characterized by: The pipeline renewal device comprises an octagonal sleeve rod (6), a composite rotary cutting, crushing and reaming device (7), a female buckle pull box (8), a concave and convex shaft (9), a pressing plate (10) and a pipe loading cylinder (11); The octagonal sleeve rod (6) is connected to the guide drill bit (41), and the composite rotary cutting, crushing and reaming device (7) is connected to the octagonal sleeve rod (6); The composite rotary cutting, crushing and reaming device (7) is provided with a transfer gear and a tube pulling head, and the pulling head on the tube pulling head is connected to the female buckle pulling box (8); The female buckle pull box (8) is connected to the concave-convex shaft (9), and the pipe loading cylinder (11) is connected to the pressing plate (10).
7. The complete set of drilling equipment for updating the original well of small-diameter rainwater and sewage pipes according to claim 1 is characterized by: Left and right tightening screws (15) are mounted on the side fixing seat assembly (12).
8. The construction method of a complete set of drilling equipment for updating the original well of a small-diameter rainwater and sewage pipeline according to any one of claims 1 to 7, characterized in that: The construction method comprises the following steps: S1: widening the working well; widening the bottom of the working well (14) serving as the working well (14) to a diameter of 1200 mm and reinforcing it; S2: Installation and adjustment of the base assembly; hoist the base assembly (1) and the bracket (23) connection piece into the working well (14), adjust the elevation, direction and slope of the base assembly (1) and the bracket assembly (2) connection piece according to the original old pipeline (20) trajectory, adjust the front and rear tightening screws (25) to fix the base assembly (1), and fix the base assembly (1) and the bracket assembly (2) connection piece; S3: Install the side fixing seat assembly; hoist the four side fixing seat assemblies (12) into the working well (14), connect the side fixing seat assembly (12) and the base assembly (1) with bolts and lock them, rotate the screw on the side fixing seat assembly (12) to further fix the base assembly (1) and the like; S4: Installing the power head assembly; hoisting the power head (34) assembly including the rear end motor (32) into the working well (14), connecting the power head (34) assembly to the bracket assembly (2) with a pin (26) and locking and fixing them with a round nut; S5: Install the front motor (31); hoist the front motor (31) into the working well (14) and install it into the power head (34) assembly. S6: Connect the hydraulic pipes between the drilling rig and the hydraulic station (35); connect the hydraulic pipes between the motor and the dual-speed valve assembly (18), and connect the hydraulic pipes and water pipes between the micro-pull top drilling rig and the hydraulic station (35); S7: Check whether all parts of the micro pull-top drill are installed properly, whether all hydraulic pipes are connected properly, and whether the whole machine is fixed intact; S8: After confirmation, the hydraulic station (35) is started to conduct a trial run of the micro-pull top drilling rig; S9: Install the guide drill rod (4) and the guide drill bit (41), operate the rotary control valve (16) and the push-pull control valve (17) of the micro-pull top drilling rig, and make the guide drill bit (41) and the guide drill rod (4) move forward along the trajectory of the old pipeline (20) toward the receiving well (13); S10: After the guide drill bit (41) and the guide drill rod (4) arrive at the receiving well (13), the guide drill bit (41) is removed, and the octagonal sleeve rod (6) and the compound rotary cutting, crushing and reaming device (7) are respectively installed, and the rotary control valve (16) and the push-pull control valve (17) of the micro-pull top drilling rig are operated to make the compound rotary cutting, crushing and reaming device (7) advance along the trajectory of the old pipeline (20) toward the working well (14) while rotary cutting and crushing the old pipeline (20); S11: After the reamer reaches the edge of the receiving well (13), a female buckle pull box (8), a new pipe (19), and a concave-convex shaft (9) are installed on one end of the pipe pulling head on the compound rotary cutting and crushing reamer (7), and the new pipe (19) is pressed into the positioning ring on the pipe pulling head using a pipe loading cylinder (11) and a pressing plate (10); S12: operating the rotary control valve (16) and the push-pull control valve (17) of the micro-pull top drilling rig, so that the composite rotary cutting and crushing reamer (7) advances along the trajectory of the old pipe (20) toward the working well (14), rotary cutting and crushing the old pipe (20), and at the same time pulls the new pipe (19) into the working well (14); S13: After the replacement construction of a new pipe section (19) is completed, the pipe loading cylinder (11) and the pressing plate (10) are removed, and a new pipe section and the concave-convex shaft (9) are installed. The new pipe section (19) is pressed into the previous new pipe section (19) by using the pipe loading cylinder (11) and the pressing plate (10). The rotary control valve (16) and the push-pull control valve (17) of the micro-pull top drilling rig are operated to make the composite rotary cutting and crushing reamer (7) advance along the trajectory of the old pipe (20) toward the working well (14), rotary cutting and crushing the old pipe (20), and at the same time, the new pipe (19) is pulled into the working well (14); S14: Repeat step S11 until all old pipes (20) are replaced; S15: The old pipeline (20) is replaced, the equipment is dismantled, and the equipment is removed from the site; S16: Clean the pipeline and inspect the pipeline.
Citation Information
Patent Citations
Top drilling machine and three-step pipe jacking method
CN107664038A
Main jacking device for pipe jacking construction through pipe-roofing underground excavation method
CN107975374A
Complete equipment for repairing small-diameter pipelines of deep foundation pits and construction method of such complete equipment
CN109798069A
Multifunctional miniature pipe jacking complete equipment and construction method
CN117536637A
Pipe bursting method
KR102042743B1
Cited By
Microtunneling apparatus
US12523103B2
Microtunneling apparatus
US12534963B2
Microtunneling apparatus
US20250215750A1
