One-time forming construction method of building facade ultra-wide concrete decoration line
By setting up internal and external operating frames, installing steel bars and formwork, and using foam blocks to fill the inner form, the problem of difficult formwork removal in ultra-wide concrete decorative lines is solved, and an efficient and safe construction process is achieved, reducing project costs and construction Difficulty.
Patent Information
- Application Number
- CN202411544689.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
It is difficult for the prior art to effectively construct ultra-wide and large-size special-shaped concrete decorative lines, especially the internal cavity structure, which makes it difficult to remove the formwork, causing engineering waste and high construction difficulties.
The first-molding construction method is adopted, including setting up internal and external operating frames, installing bottom mold pads and steel bars, installing filling inner molds and side steel bars, installing side molds and top steel bars, and pouring fine stone concrete, and filling inner molds with foam blocks and Metal sheet protection ensures construction accuracy and safety.
It improves the operability and efficiency of construction, reduces project waste, ensures the continuity and cost control of concrete lines, and reduces construction difficulty and labor costs.
Smart Images

Figure CN119243986A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building decoration, in particular to a building facade made of concrete, and specifically to a one-time forming construction method for ultra-wide concrete decorative lines on the building facade. Background Art
[0002] like Figure 1 When concrete is used as the line material for the facade of a high-rise building, it is necessary to ensure that the shape and style of the lines after construction meet the design and visual requirements; at the same time, it must be operable during the construction operation. If it is not operable, on the one hand, workers will not be able to carry out construction or the construction will be difficult, and on the other hand, the construction quality will not meet the requirements, and structural size deviations and concrete quality problems are likely to occur; affecting the overall beauty of the decorative lines and the overall durability of the project.
[0003] At present, the shaping of concrete lines is generally achieved by on-site formwork. However, in fact, for "special-shaped" concrete decorative lines of unconventional sizes such as extra-wide and extra-large, on-site formwork construction is generally more difficult. For example, due to the influence of force, these lines are designed as internal cavities, which makes it impossible to remove the internal formwork, resulting in a certain amount of engineering waste. Summary of the invention
[0004] The purpose of the present invention is to overcome the above-mentioned defects and to provide a one-time forming construction method for ultra-wide concrete decorative lines on building facades.
[0005] In order to achieve the above object, the present invention is achieved in the following ways: A one-time forming construction method for ultra-wide concrete decorative lines on building facades at least comprises the steps of making and filling inner molds, supporting outer molds, pouring at one time and removing the outer molds.
[0006] The one-time forming construction method of the ultra-wide concrete decorative lines on the building facade specifically includes: Step 1: Set up the internal and external operating frames: According to the position and size of the concrete decorative lines, design the position and parameter scheme of the internal and external frames, and strictly locate and lay out the lines and set up the frames according to the requirements of the scheme to control the setting accuracy; Step 2, installing the bottom formwork pad and steel bar binding of the concrete decorative line: installing the bottom formwork of the concrete decorative line according to the positioning data of step 1, setting the bottom pad between the bottom formwork and the inner and outer operating frames, and binding and fixing the bottom steel bars of the concrete decorative line in the bottom formwork; Step 3, install the filling inner mold and tie the side reinforcement: set up the side reinforcement of the concrete decorative line, place the filling inner mold between the bottom reinforcement and the side reinforcement according to the positioning data of step 1, and tie the filling inner mold to the bottom reinforcement and the side reinforcement with iron wire; Step 4: Install the side formwork and top reinforcement: Install the top reinforcement of the concrete decorative lines, and use tension bolts to fix the side formwork on both sides; Step 5: Carry out the pouring of fine stone concrete to ensure accurate and full pouring construction effect of each part; complete the pouring construction of concrete decorative lines; Step 6: Remove the outer mold and maintain it.
[0007] Furthermore, in the one-time forming construction method for constructing ultra-wide concrete decorative lines on the facade, the filling inner mold refers to a foam block whose outer surface is wrapped by a plastic film. The length and width of the filling inner mold are determined according to the designed cavity size of the concrete decorative lines; and the filling inner mold is not taken out after the concrete is poured.
[0008] Furthermore, in step 4, when setting the tension bolts, a metal sheet is set at the position where the filling inner mold is passed by the tension bolts, and the metal sheet is used to prevent the filling inner mold from being damaged by the tension bolts to form a gap.
[0009] Furthermore, in step 4, when the outer surface of the concrete decorative line has a slope or a curved surface, the template and the support are slightly bent according to the curved surface to meet the modeling requirements of the outer surface of the concrete decorative line.
[0010] The one-time forming construction method of ultra-wide concrete decorative lines on building facades proposed in the present invention requires common equipment and convenient materials, is easy to construct on site, and is easy for operators to use, which is beneficial to improving work efficiency and saving labor costs for project construction.
[0011] Furthermore, this method fundamentally solves the problem of difficult formwork and casting of hollow concrete structures of building decorative lines, ensures the continuity of concrete line construction, and can adjust foam block parameters according to required sizes, saving materials and labor, and promoting project cost control and progress control; this method only requires internal fixation of foam blocks, and does not require separate setting of formwork wooden blocks and other measures, which improves the operability in concrete line construction and ensures the safety and convenience of personnel in pouring construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 Schematic diagram of concrete decorative lines for architectural purposes.
[0013] Figure 2 Construction diagram for this method Figure 1 .
[0014] Figure 3 Construction diagram for this method Figure 2 .
[0015] Figure 4 Construction diagram for this method Figure 3 .
[0016] Figure 5 Construction diagram for this method Figure 4 .
[0017] Figure 6 Construction diagram for this method Figure 5 . DETAILED DESCRIPTION
[0018] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application.
[0019] like Figure 2 to Figure 6 , a one-time forming construction method for ultra-wide concrete decorative lines on building facades, comprising: Step 1: Set up the internal and external operating frames: According to the position and size of the concrete decorative lines, design the position and parameter scheme of the internal and external frames, and strictly locate and lay out the lines and set up the frames according to the requirements of the scheme to control the setting accuracy; Step 2, installing the bottom formwork pad and steel bar binding of the concrete decorative line: installing the bottom formwork of the concrete decorative line according to the positioning data of step 1, setting the bottom pad between the bottom formwork and the inner and outer operating frames, and binding and fixing the bottom steel bars of the concrete decorative line in the bottom formwork; Step 3, install the filling inner mold and tie the side reinforcement: set up the side reinforcement of the concrete decorative line, place the filling inner mold between the bottom reinforcement and the side reinforcement according to the positioning data of step 1, and tie the filling inner mold to the bottom reinforcement and the side reinforcement with iron wire; Step 4, install the side formwork and top reinforcement: install and fix the top reinforcement of the concrete decorative line, and use tension bolts to install and fix the side formwork on both sides; wherein, when setting the tension bolts, set metal sheets at the positions where the tension bolts pass through the filling inner form; further, when the outer surface of the concrete decorative line has a slope or a curved curvature, slightly bend the formwork and the support according to the curved curvature to meet the modeling requirements of the outer surface of the concrete decorative line.
[0020] Step 5: Carry out the pouring of fine stone concrete to ensure accurate and full pouring construction effect of each part; complete the pouring construction of concrete decorative lines; Step 6: Remove the outer mold and maintain it.
[0021] In the one-time forming construction method for constructing ultra-wide concrete decorative lines on the facade, the filling inner mold refers to a foam block whose outer surface is wrapped with a plastic film. The length and width of the filling inner mold are determined according to the designed cavity size of the concrete decorative lines; and the filling inner mold is not taken out after the concrete is poured.
[0022] In this embodiment, when constructing the concrete decorative lines of the building facade, prefabricated foam blocks + slightly curved wooden formwork support are adopted, the outside is supported by slightly curved formwork, wooden squares and slightly curved steel pipes, fixed by tension screws, and the hollow position is filled with foam blocks. The foam blocks are fixed by metal clips and covered with plastic film to isolate the concrete. The curved lines are supported by slightly curved steel pipes and formworks, and fine stone concrete is poured. While ensuring the pouring effect, the construction efficiency is improved, and a complete set of processes is easy to form. The solution is mature, easy to operate, and the construction progress is guaranteed.
[0023] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A one-time forming construction method for ultra-wide concrete decorative lines on building facades, characterized by: The method at least includes the steps of making and filling the inner mold, supporting the outer mold, pouring in one go, and removing the outer mold.
2. The one-step forming construction method for ultra-wide concrete decorative lines on building facades according to claim 1 is characterized by: The method comprises: Step 1: Set up the internal and external operating frames: According to the position and size of the concrete decorative lines, design the position and parameter scheme of the internal and external frames, and strictly locate and lay out the lines and set up the frames according to the requirements of the scheme to control the setting accuracy; Step 2, installing the bottom formwork pad and steel bar binding of the concrete decorative line: installing the bottom formwork of the concrete decorative line according to the positioning data of step 1, setting the bottom pad between the bottom formwork and the inner and outer operating frames, and binding and fixing the bottom steel bars of the concrete decorative line in the bottom formwork; Step 3, install the filling inner mold and tie the side reinforcement: set up the side reinforcement of the concrete decorative line, place the filling inner mold between the bottom reinforcement and the side reinforcement according to the positioning data of step 1, and tie the filling inner mold to the bottom reinforcement and the side reinforcement with iron wire; Step 4: Install the side formwork and top reinforcement: Install the top reinforcement of the concrete decorative lines, and use tension bolts to fix the side formwork on both sides; Step 5: Carry out the pouring of fine stone concrete to ensure accurate and full pouring construction effect of each part; complete the pouring construction of concrete decorative lines; Step 6: Remove the outer mold and maintain it.
3. The one-step forming construction method for building super-wide concrete decorative lines on exterior facades according to claim 1 or 2, characterized in that: The filling inner mold refers to a foam block whose outer surface is wrapped by a plastic film. The length and width of the filling inner mold are determined according to the design cavity size of the concrete decorative line; the filling inner mold is not taken out after the concrete is poured.
4. The one-step forming construction method for building ultra-wide concrete decorative lines on exterior facades according to claim 2 is characterized by: In step 4, when setting the tension bolts, a metal sheet is set at the position where the filling inner mold is passed by the tension bolts, and the metal sheet is used to prevent the filling inner mold from being damaged by the tension bolts to form a gap.
5. The one-step forming construction method for building super-wide concrete decorative lines on exterior facades according to claim 2 is characterized by: In step 4, when the outer surface of the concrete decorative line has a slope or a curved surface, the template and the support are slightly bent according to the curved surface to meet the modeling requirements of the outer surface of the concrete decorative line.
Citation Information
Patent Citations
Hollow shear wall structure for cross diagonal reinforcing bar and construction method thereof
CN102979220A
Concrete one-step forming process of building appearance moulding and main structure
CN103470038A
Building facade sealing method
CN114809612A
Overall construction method for over-limit beam, lower hanging plate and canopy
CN117071901A
Dismounting-free inner mold for cast-in-situ large-span floors
CN201695680U