Precast beam mold opening operation platform and using method thereof

By designing a prefabricated beam mold opening operation platform and using construction frames and hydraulic stations to drive hydraulic roof removal templates, the time-consuming and laborious replacement of formwork and station occupation in traditional technology is solved, and the beam making efficiency and operation convenience are improved.

CN119610373APending Publication Date: 2025-03-14CHINA RAILWAY 12TH BUREAU GROUP 7TH CORPORATION LIMITED +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411926856.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-25
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

When the prior art replaces or adjusts the side mold during the prefabrication of non-standard beams, the traditional ring production line fixes hydraulic formwork mobile trolleys are bulky and there are many hydraulic oil pipes, which makes it time-consuming and labor-intensive to replace the formwork, occupying the casting station, and affecting the efficiency of beam making.

Method used

A prefabricated beam mold opening operation platform is designed, including multiple construction frames and a matching hydraulic station. A mold opening area is formed between two adjacent construction frames. The hydraulic top is movably connected to the construction frame. The hydraulic station drives the hydraulic top backhaul removal template, which is simple and convenient to operate and adapt to the disassembly and replacement of different types of templates.

Benefits of technology

It realizes the simplicity and convenience of replacing the formwork, avoids occupying the pouring station, improves the efficiency of beam making, and saves more time and effort than traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119610373A_ABST
    Figure CN119610373A_ABST
Patent Text Reader

Abstract

The invention discloses a precast beam mold opening operation platform which comprises a plurality of construction frames and hydraulic stations matched with the construction frames in number, a mold opening area is formed between every two adjacent construction frames, each construction frame is movably connected with a plurality of hydraulic jacks, each hydraulic jack is connected with the corresponding hydraulic station, during mold opening operation, each hydraulic jack is connected with a template, and the template is connected with the corresponding hydraulic station. And the hydraulic station drives the hydraulic jack to return to disassemble the template. The device has the advantages of being convenient to replace templates, suitable for different templates and capable of improving efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge box girder construction, and in particular to a prefabricated beam mold opening operation platform and a use method thereof. Background Art

[0002] At present, there are fewer and fewer newly built expressways, and more and more reconstruction and expansion projects. In order to fit the span and line of the old bridge, and to meet the clearance and width requirements of the overpass road and waterway, the reconstruction and expansion projects have complex beam shapes, various beam heights, beam lengths and angles, and many non-standard beams.

[0003] During the prefabrication of non-standard beams, the side formwork type needs to be frequently replaced or adjusted. The traditional circular production line has a fixed hydraulic formwork mobile trolley tooling, and the formwork is installed in a fixed position. The hydraulic system and construction platform installed on the formwork are very bulky, with many hydraulic oil pipes. Replacing or adding side forms is time-consuming and laborious. When replacing or adjusting the formwork, the casting station needs to be occupied, which causes traffic jams on the production line and affects the efficiency of beam making. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a precast beam mold opening operation platform which is simple and convenient to replace, adaptable to different templates and improves efficiency, and a method for using the same.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A prefabricated beam mold opening operation platform comprises a plurality of construction frames and a hydraulic station matching the number of the construction frames, a mold opening area is formed between two adjacent construction frames, a plurality of hydraulic jacks are movably connected to the construction frames, each of the hydraulic jacks is connected to a corresponding hydraulic station, during the mold opening operation, each of the hydraulic jacks is connected to a template, and the hydraulic station drives the hydraulic jack to return to disassemble the template.

[0007] As a further improvement of the above technical solution:

[0008] The construction frame includes a plurality of columns arranged at intervals, each of which is welded and fixed to a pre-buried steel plate on the ground, a main beam is connected between the columns, a cross beam is fixed to the top of each column, the cross beam is flush with the upper surface of the column, an operating table is fixed to the cross beam and the columns, and each hydraulic jack is movably connected to the main beam.

[0009] The main beam is buckled with a base which can slide and move along the main beam, and the hydraulic jack is movably hinged on the base.

[0010] During the mold opening operation, the piston rod of the hydraulic jack is connected to the template through a latch.

[0011] The operating platform comprises a platform plate and guardrails. The platform plate is fixedly connected to the crossbeam and the column, and the guardrails are arranged on both sides of the platform plate.

[0012] Diagonal braces are also arranged on both sides of the column.

[0013] It also includes a construction staircase, which includes a pedal and a handrail. One end of the pedal is placed on the ground, and the other end is fixedly connected to the beam. The handrail is arranged on both sides of the pedal.

[0014] The hydraulic station is electrically connected to a control cabinet.

[0015] The hydraulic station comprises an oil pump and oil pipes matching the number of hydraulic jacks, and each of the oil pipes is connected between the oil pump and the hydraulic jack.

[0016] A method for using a prefabricated beam mold opening operation platform comprises the following steps:

[0017] S1: The mobile trolley loaded with precast beams drives into the mold opening area between two construction frames;

[0018] S2: Connect each hydraulic jack to the formwork of the precast beam through a latch;

[0019] S3: Control the hydraulic station through the control cabinet on one side to drive the corresponding hydraulic top piston rod to return, and disassemble the template on one side of the precast beam. Then control the hydraulic station through the control cabinet on the other side to drive the corresponding hydraulic top piston rod to return, and disassemble the template on the other side of the precast beam.

[0020] S4: Remove the latch and disconnect the hydraulic jack from the formwork;

[0021] S5: The mobile trolley moves out of the mold opening area.

[0022] Compared with the prior art, the advantages of the present invention are:

[0023] The present invention sets a construction frame and a hydraulic jack on the construction frame. The hydraulic station drives the hydraulic jack to return to disassemble and separate the formwork of the precast beam. The operation is simple and convenient. Compared with the traditional tooling in which the casting construction platform and the hydraulic system are set as one body, the working platform of the present invention separates the hydraulic jack and the casting construction platform. When the formwork is dismantled and the formwork is replaced, the construction position of the casting platform will not be occupied, thereby improving the construction efficiency. In addition, the hydraulic jack is movably connected to the construction frame, so that it can adapt to the disassembly, replacement and adjustment of different types of formwork.

[0024] The method forms a mold opening area between two construction frames. During the mold opening operation, a mobile trolley drives into the mold opening area for operation without occupying the original casting station, thereby improving the beam making efficiency of precast beams. During the mold opening, only the hydraulic jack needs to be connected to the template through a latch. Compared with the traditional construction method of installing a hydraulic system on the template, the operation is simple and convenient, saving time and effort. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram (front view) of the overall structure of the mold opening work platform of the present invention.

[0026] Figure 2 It is a schematic diagram (side view) of the overall structure of the mold opening work platform of the present invention.

[0027] Figure 3 It is a schematic diagram (top view) of the overall structure of the mold opening work platform of the present invention.

[0028] Figure 4 It is a schematic diagram of the application of the mold opening operation platform of the present invention.

[0029] The symbols in the figure represent:

[0030] 1. Construction frame; 11. Column; 12. Main beam; 13. Cross beam; 14. Operating table; 141. Platform plate; 142. Guardrail; 15. Diagonal brace; 2. Hydraulic station; 21. Oil pump; 22. Oil pipe; 3. Hydraulic jack; 4. Base; 5. Latch; 6. Construction stairs; 61. Pedal; 62. Handrail; 7. Control cabinet; 100. Formwork; 200. Mobile trolley. DETAILED DESCRIPTION

[0031] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0032] like Figures 1 to 4 As shown, the precast beam mold opening operation platform of this embodiment includes a plurality of construction frames 1 and a hydraulic station 2 matching the number of construction frames 1, a mold opening area is formed between two adjacent construction frames 1, a plurality of hydraulic jacks 3 are movably connected to the construction frames 1, each hydraulic jack 3 is connected to the corresponding hydraulic station 2, during the mold opening operation, each hydraulic jack 3 is connected to the template 100, and the hydraulic station 2 drives the hydraulic jack 3 to return to disassemble the template 100. The present invention disassembles and separates the template 100 of the precast beam by setting the construction frame 1 and arranging the hydraulic jack 3 on the construction frame 1, and the hydraulic station 2 drives the hydraulic jack 3 to return to disassemble and separate the template 100 of the precast beam, and the operation is simple and convenient. Compared with the traditional tooling in which the casting construction platform and the hydraulic system are set as one body, the operation platform of the present invention separates the hydraulic jack 3 from the casting construction platform, and when disassembling and replacing the template 100, the construction station of the casting platform will not be occupied, thereby improving the construction efficiency. In addition, the hydraulic jack 3 is movably connected to the construction frame 1, so that it can adapt to the disassembly, replacement and adjustment of different types of templates 100.

[0033] In this embodiment, the construction frame 1 includes a plurality of columns 11 arranged at intervals, each column 11 is welded and fixed to the pre-buried steel plate on the ground, a main beam 12 is connected between each column 11, a cross beam 13 is fixed to the top of each column 11, the cross beam 13 is flush with the upper surface of the column 11, an operating table 14 is fixed to the cross beam 13 and the column 11, and each hydraulic jack 3 is movably connected to the main beam 12. In this structure, a stable structural frame is formed by the columns 11 and the main beam 12, and the cross beam 13 is arranged on the top of the column 11 to widen the bearing space on the upper part of the column 11, providing a reliable foundation for setting the operating table 14.

[0034] In this embodiment, a base 4 that can slide and move along the main beam 12 is buckled on the main beam 12, and the hydraulic jack 3 is movably hinged on the base 5. In this structure, the base 4 is buckled on the main beam 12, and the connection is stable, and the base 4 can slide along the main beam 12, so that the hydraulic jack 3 can move along the main beam 12 with the base 4, and can rotate around the hinge point between it and the base 4. The hydraulic jack 3 is flexibly arranged, thereby meeting the requirements for disassembly and replacement of different types of templates 100.

[0035] In this embodiment, during the mold opening operation, the piston rod of the hydraulic jack 3 is connected to the mold plate 100 through the latch 5. The operation is simple and convenient, and the disassembly is easy.

[0036] In this embodiment, the operating platform 14 includes a platform plate 141 and a guardrail 142. The platform plate 141 is fixedly connected to the cross beam 13 and the column 11, and the guardrail 142 is arranged on both sides of the platform plate 141. The platform plate 141 is built on the column 11 and the cross beam 13 to form a stable construction station and a walking aisle, which is convenient for construction. The guardrail 142 is arranged to improve safety. The structure is simple and easy to install.

[0037] In this embodiment, diagonal braces 15 are further provided on both sides of the upright column 11. The diagonal braces 15 enhance the stability of the overall structure.

[0038] In this embodiment, a construction staircase 6 is also included. The construction staircase 7 includes a pedal 61 and a handrail 62. One end of the pedal 61 is placed on the ground, and the other end is fixedly connected to the beam 13. The handrail 62 is arranged on both sides of the pedal 61. In this structure, the construction staircase 7 is arranged to facilitate construction workers to walk to the operating platform.

[0039] In this embodiment, the hydraulic station 2 is electrically connected to a control cabinet 7. The hydraulic station 2 is operated and controlled by the control cabinet 7, or the hydraulic station 2 can be controlled by a handheld remote controller.

[0040] In this embodiment, the hydraulic station 2 includes an oil pump 21 and oil pipes 22 whose number matches the number of hydraulic jacks 3, and each oil pipe 22 is connected between the oil pump 21 and the hydraulic jack 3. Its structure is simple and reliable.

[0041] The method for using the precast beam mold opening operation platform of this embodiment includes the following steps:

[0042] S1: The mobile trolley 200 loaded with precast beams drives into the mold opening area between the two construction frames 1;

[0043] S2: Connect each hydraulic jack 3 to the template 100 of the prefabricated beam through the latch 5;

[0044] S3: Control the hydraulic station 2 through the control cabinet 7 on one side to drive the corresponding hydraulic jack 3 piston rod to return, and disassemble the template 100 on one side of the precast beam, and then control the hydraulic station 2 through the control cabinet 7 on the other side to drive the corresponding hydraulic jack 3 piston rod to return, and disassemble the template 100 on the other side of the precast beam;

[0045] S4: Remove the latch 5 to disconnect the hydraulic jack 3 from the template 100;

[0046] S5: The mobile trolley 200 moves out of the mold opening area.

[0047] In this method, a mold opening area is formed between two construction frames 1. During the mold opening operation, a mobile trolley 200 drives into the mold opening area for operation without occupying the original casting station, thereby improving the efficiency of prefabricated beam production. During the mold opening, only the hydraulic jack 3 needs to be connected to the template 100 through the latch 5. Compared with the traditional construction method of installing a hydraulic system on the template 100, the operation is simple and convenient, saving time and effort.

[0048] Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any technician familiar with the art can make many possible changes and modifications to the technical solution of the present invention by using the technical content disclosed above without departing from the scope of the technical solution of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention should fall within the scope of protection of the technical solution of the present invention.

Claims

1. A prefabricated beam mold opening operation platform, characterized in that: The invention comprises a plurality of construction frames (1) and a hydraulic station (2) matching the number of the construction frames (1); a mold opening area is formed between two adjacent construction frames (1); a plurality of hydraulic jacks (3) are movably connected to the construction frames (1); each hydraulic jack (3) is connected to a corresponding hydraulic station (2); during a mold opening operation, each hydraulic jack (3) is connected to a template (100); and the hydraulic station (2) drives the hydraulic jack (3) to return to disassemble the template (100).

2. The precast beam mold opening operation platform according to claim 1 is characterized in that: The construction frame (1) comprises a plurality of columns (11) arranged at intervals, each of the columns (11) being welded and fixed to a pre-buried steel plate on the ground, a main beam (12) being connected between the columns (11), a cross beam (13) being fixed to the top of each column (11), the cross beam (13) being flush with the upper surface of the column (11), an operating table (14) being fixed to the cross beam (13) and the column (11), and each of the hydraulic jacks (3) being movably connected to the main beam (12).

3. The precast beam mold opening operation platform according to claim 2 is characterized in that: The main beam (12) is buckled with a base (4) which can slide and move along the main beam (12), and the hydraulic jack (3) is movably hinged on the base (4).

4. The precast beam mold opening operation platform according to claim 3 is characterized in that: During the mold opening operation, the piston rod of the hydraulic jack (3) is connected to the mold plate (100) via a latch (5).

5. The precast beam mold opening operation platform according to claim 4 is characterized in that: The operating platform (14) comprises a platform plate (141) and a guardrail (142); the platform plate (141) is fixedly connected to the crossbeam (13) and the column (11); and the guardrail (142) is arranged on both sides of the platform plate (141).

6. The precast beam mold opening operation platform according to claim 5 is characterized in that: Diagonal braces (15) are also provided on both sides of the column (11).

7. The precast beam mold opening operation platform according to claim 6 is characterized in that: It also comprises a construction staircase (6), the construction staircase (6) comprising a pedal (61) and a handrail (62), one end of the pedal (61) is placed on the ground, and the other end is fixedly connected to the crossbeam (13), and the handrail (62) is arranged on both sides of the pedal (61).

8. The precast beam mold opening operation platform according to any one of claims 1 to 7, characterized in that: The hydraulic station (2) is electrically connected to a control cabinet (7).

9. The precast beam mold opening operation platform according to claim 8, characterized in that: The hydraulic station (2) comprises an oil pump (21) and oil pipes (22) whose number matches the number of hydraulic jacks (3), and each of the oil pipes (22) is connected between the oil pump (21) and the hydraulic jack (3).

10. A method for using the precast beam mold opening operation platform according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: The mobile trolley (200) loaded with prefabricated beams drives into the mold opening area between two construction frames (1); S2: Connect each hydraulic jack (3) to the template (100) of the prefabricated beam via a latch (5); S3: Controlling the hydraulic station (2) through the control cabinet (7) on one side to drive the piston rod of the corresponding hydraulic jack (3) to return, and dismantling the template (100) on one side of the precast beam, and then controlling the hydraulic station (2) through the control cabinet (7) on the other side to drive the piston rod of the corresponding hydraulic jack (3) to return, and dismantling the template (100) on the other side of the precast beam; S4: removing the latch (5) to disconnect the hydraulic jack (3) from the template (100); S5: The mobile trolley (200) moves out of the mold opening area.