By using a double-layer gravel layer structure and high-strength steel wire woven geogrids in the silt foundation pit, the problem of insufficient road bearing capacity is solved, balanced stress and long-term use of the road are achieved, and construction and construction costs are reduced. Maintenance costs.
Patent Information
- Application Number
- CN202420521818.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-18
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-18
AI Technical Summary
In large silt foundation pits, traditional road structures cannot meet the bearing capacity requirements of mechanical equipment on weak soil layers, resulting in uneven road settlement, short service life, and high maintenance costs, which in turn affects project progress and efficiency.
A double-layer gravel layer structure is adopted, which is composed of the first geogrid and the second geogrid. The first gravel layer and the second gravel layer are made of river bed sand and pebbles, and a network is formed by transverse and longitudinal ribs woven with high-strength steel wires. The lattice structure provides support and resists silt settlement and vehicle weight, ensuring balanced road bearing capacity.
It improves the road bearing capacity, extends its service life, reduces construction and maintenance costs, and improves the traffic efficiency and construction efficiency of mechanical equipment.
Smart Images

Figure CN221918828U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of silt foundation pit excavation, in particular to a new road structure suitable for large silt foundation pits. Background Art
[0002] During the construction of a barrage hydropower station, the excavation of the dam foundation pit is one of the most critical projects. The Lawa Hydropower Station Dam is a 250m-class face rockfill dam under construction. Its dam site is located in a canyon river section about 1,000m long. The riverbed cover layer (depth) of the dam foundation is more than 70m thick, and mainly develops weak soil layers in the barrier lake phase, mainly silty clay, with liquefaction characteristics, and manifests as liquefied soil layers. Before the dam is filled, the cover layer must be completely excavated, and the excavation volume exceeds 6.3 million m 3 .
[0003] As mentioned above, the core of the foundation pit excavation project for barrage hydropower stations, especially those with thick silt cover like Lawa Hydropower Station, is to remove the silt cover. Therefore, it is very important to build a road in the silt area of the foundation pit that can carry mechanical equipment such as excavators and dump trucks. However, it is extremely difficult to build a road that meets the bearing capacity requirements in the silt area (soft soil layer).
[0004] When excavating large muddy foundation pits or soft soil layers, the traditional way to solve the problem of insufficient road bearing capacity is to directly lay slag or roadbed steel plates on the soft soil layer. The thickness of the slag laying is mostly between 1.5m and 2.0m, and the roadbed steel plates are all laid in a single layer due to their high cost. However, after the road is put into operation for a short time, the laid slag sinks into the mud, resulting in uneven settlement in each section, large ups and downs, many potholes, difficult repairs, and short service life. At the same time, the amount of slag required for road construction is large, the construction workload is large, and the maintenance workload required for the road is large, which greatly reduces the efficiency of slag removal by excavators and dump trucks. The roadbed steel plates quickly sink directly into the mud, and the roadbed steel plates must be repeatedly added, which hinders the progress of the project and increases the cost of the project. Utility Model Content
[0005] In order to solve the difficulties in road construction in large muddy foundation pits, the utility model provides a new road structure suitable for large muddy foundation pits, whose bearing capacity can meet the smooth passage of mechanical equipment such as excavators and dump trucks, and is easy to install and economical.
[0006] A new type of road structure suitable for large silt foundation pits, including a first geogrid, a first slag layer, a second geogrid and a second slag layer laid on the silt layer from bottom to top, the thickness of the first slag layer and the second slag layer is not less than 40 cm, the first geogrid and the second geogrid include a plurality of transverse ribs and longitudinal ribs, and the transverse ribs and the longitudinal ribs are perpendicular to each other to form a plurality of evenly distributed grids.
[0007] Preferably, the first slag layer and the second slag layer are made of sand and gravel washed from the riverbed.
[0008] Preferably, the middle parts of the first slag layer and the second slag layer are filled horizontally, and the two sides are filled to form an inclined slope of 1:1.5.
[0009] Preferably, the transverse ribs and the longitudinal ribs are made of high-strength steel wires, which are wrapped with high-density polyethylene to form strength strips, woven in warp and weft, and then formed by ultrasonic welding.
[0010] Preferably, the mesh size of the first geogrid and the second geogrid is set to 140m×140mm, and the transverse and longitudinal tensile strength is greater than 50KN / m.
[0011] Beneficial effects of the utility model:
[0012] The utility model lays a first geogrid, a first slag layer, a second geogrid and a second slag layer in sequence, and a double slag layer is filled on the silt layer to form a road foundation for vehicle passage. The transverse ribs and the longitudinal ribs of the double-layer geogrid work together to give full play to the interlocking effect of the grid on the sand and pebbles in the slag layer, provide support for the slag layer, resist the settlement of silt and the weight of vehicles, improve the bearing capacity of the road, balance the force on each section of the road, avoid local settlement, and ensure the smooth passage of excavation and transportation equipment.
[0013] The first geogrid and the second geogrid of the utility model adopt steel-plastic composite geogrids, which are light in weight, strong in compression resistance, wear-resistant and durable, easy to install and require little workload. Compared with traditional methods, they reduce the amount of slag paving, reduce road construction and operation and maintenance costs, are economical and practical, and improve the efficiency of foundation pit excavation construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a plan view of the utility model;
[0015] Figure 2 It is a cross-sectional view of the utility model;
[0016] Figure 3 It is a structural schematic diagram of the first geogrid.
[0017] In the figure:
[0018] 1. First geogrid, 2. First slag layer, 3. Second geogrid, 4. Second slag layer, 5. Transverse ribs, 6. Longitudinal ribs, 7. Grid. DETAILED DESCRIPTION
[0019] Now the utility model is further described in detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the utility model in a schematic manner, and therefore only show the components related to the utility model.
[0020] In the description of the present invention, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model.
[0021] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] Embodiment 1:
[0023] Reference Figure 1-Figure 3 , a new type of road structure suitable for large muddy foundation pits, the first geogrid 1, the first slag layer 2, the second geogrid 3 and the second slag layer 4, the thickness of the first slag layer 2 and the second slag layer 4 are both set to 40cm, the width of the second slag layer 4 is 12m, the first geogrid 1 and the second geogrid 3 include a plurality of transverse ribs 5 and longitudinal ribs 6, the transverse ribs 5 and the longitudinal ribs 6 are perpendicular to each other to form a plurality of evenly distributed grids 7. A double-layer slag layer with a thickness of 80cm is used as the foundation of the on-site road, and the first geogrid 1 and the second geogrid 3 at the bottom of the slag layer play a supporting role for the first slag layer 2 and the second slag layer 4, and the transverse ribs 5 and the longitudinal ribs 6 are used to lock the stones in the slag layer, thereby improving the bearing capacity of the road and ensuring the smooth passage of mechanical equipment.
[0024] The first slag layer 2 and the second slag layer 4 are made of sand and gravel washed from the riverbed. The sand and gravel have a smooth surface and good roundness, which is convenient for vehicles to pass.
[0025] The middle of the first slag layer 2 and the second slag layer 4 are filled horizontally, and the two sides are filled to form a 1:1.5 inclined slope. The middle of the first slag layer 2 and the second slag layer 4 is horizontal to facilitate vehicle passage, and the slope setting on both sides can ensure the overall stability of the road and reduce stone sliding caused by excessive slope.
[0026] like Figure 3 As shown, the transverse ribs 5 and the longitudinal ribs 6 of the first geogrid 1 and the second geogrid 3 are made of high-strength steel wires, which are wrapped with high-density polyethylene to form strength strips, and are woven in warp and weft and then formed by ultrasonic welding. The steel-plastic composite geogrid used in this embodiment is light in weight, economical, strong in compression resistance, and wear-resistant and durable.
[0027] The mesh size of the first geogrid 1 and the second geogrid 3 is set to 140m×140mm, with a transverse and longitudinal tensile strength of >50KN / m, strong deformation resistance, capable of adapting to high loads and stretching, and providing strong support and protection for the road.
[0028] The road structure of this embodiment is based on the production test of excavation of soft soil layer of Lawa foundation pit. It shows that under the support of 75t heavy vehicle load, the overall settlement of the road is about 7cm after 12 times, and the overall settlement of the road tends to converge to a value of about 8cm after 14 and 16 times, and the road can meet the traffic demand; at the same time, according to the on-site cost calculation, this embodiment uses 80cm thick and 12m wide (referring to the width of the upper surface of the road) double-layer slag as the on-site road. Every 100m of paved road can reduce the cost by about 4,000 yuan compared with 180cm thick pure slag paving. This embodiment has been successfully applied in subsequent large-scale construction with obvious effects, effectively reducing the cost of road construction and operation and maintenance, and improving the efficiency of foundation pit excavation construction.
[0029] Based on the above ideal embodiments of the utility model, the relevant staff can make various changes and modifications without deviating from the technical concept of the utility model through the above description. The technical scope of the utility model is not limited to the content of the specification, and its technical scope must be determined according to the scope of the claims.
Claims
1. A new type of road structure suitable for large muddy foundation pits, characterized in that: It includes a first geogrid, a first slag layer, a second geogrid and a second slag layer which are laid on the silt layer from bottom to top in sequence. The thickness of the first slag layer and the second slag layer is not less than 40 cm. The first geogrid and the second geogrid include a plurality of transverse ribs and longitudinal ribs. The transverse ribs and the longitudinal ribs are perpendicular to each other to form a plurality of evenly distributed grids.
2. A new type of road structure suitable for large muddy foundation pits according to claim 1, characterized in that: The first slag layer and the second slag layer are made of sand and gravel washed from the riverbed.
3. A new type of road structure suitable for large muddy foundation pits according to claim 1, characterized in that: The middle parts of the first slag layer and the second slag layer are filled horizontally, and the two sides are filled to form an inclined slope of 1:1.
5.
4. A new type of road structure suitable for large muddy foundation pits according to claim 1, characterized in that: The transverse ribs and the longitudinal ribs are made of high-strength steel wires, which are wrapped with high-density polyethylene to form strength strips, woven in warp and weft, and then formed by ultrasonic welding.
5. A new type of road structure suitable for large muddy foundation pits according to claim 4, characterized in that: The mesh size of the first geogrid and the second geogrid is set to 140m×140mm, and the transverse and longitudinal tensile strength is greater than 50KN / m.