Quickly-mounted deepwater jacket
By installing air bags on the jacket and using high-strength cement slurry and bolt connections, combined with weight plates and traction ropes, the problems of complex and high-cost jacket installation are solved, achieving a fast and simplified installation process and an efficient deepwater jacket. Install.
Patent Information
- Application Number
- CN202420302787.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-19
AI Technical Summary
The height and weight of existing quick-installation deepwater jackets during the installation process lead to long hoisting and transportation times, high costs, and complicated installation, which reduces construction efficiency and cannot meet the needs of deep-sea wind farms.
An air bag is used to fix the jacket main pipe to provide buoyancy and simplify the split structure of the jacket. It is connected through high-strength cement slurry and high-strength bolts, combined with weight plates and traction ropes to achieve rapid hoisting and installation, reducing equipment specifications and construction costs.
It shortens the offshore operation process and time, simplifies the installation process, improves installation efficiency, reduces construction costs, and achieves the goal of quickly installing deepwater jackets.
Smart Images

Figure CN221919508U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of offshore wind power generation, in particular to a fast-installed deep-water conductor frame. Background Art
[0002] At present, when constructing the foundation of offshore wind turbines, it is necessary to sink multiple engineering piles into the seabed first. At this time, the engineering piles must be hoisted to the pile sinking point first, and then the piles are sunk. In order to ensure that the engineering piles can be smoothly inserted into the mud and the verticality of the pile body is within 3‰ during the pile sinking process, the engineering piles are often stabilized by using a pile stabilization platform. At present, all the offshore wind farms built in China are offshore wind farms, and the water depth is generally less than 10m. The supporting structure types are mainly high pile cap foundations and single pile foundations. With the development of offshore wind farms, the offshore distance and water depth of wind farms are constantly increasing, and the traditional offshore foundation structure type can no longer meet the requirements of deep-sea wind energy development. In sea areas with a water depth of about 60m, the jacket foundation has a relatively good economic advantage. Since the height of the overall jacket exceeds 60 meters and the weight is usually as high as thousands of tons, the space and weight required for one-time hoisting are very high, and it is necessary to rent a large installation ship with space and a large crane specification. Such ships are usually scarce and expensive. In order to reduce the difficulty of overall lifting and to rent a relatively smaller and less expensive installation vessel for the operation, the jacket is split into two parts, the upper and lower parts.
[0003] The upper part is a trapezoidal steel pipe truss and corner connection section with a height of 30~40 meters. The length of the connection section casing is ≥8m. After lifting, it is positioned with the reserved 8m steel pile and then lowered for connection. Cement slurry is used to fix the annular gap between the two, and the lower end and the straight section end are connected with high-strength bolts.
[0004] The lower part is composed of several straight sections of casing, each of which is about 20 to 30 meters long. The casings are connected by multiple steel pipes to form an integral truss. The integral truss of the lower part is hoisted down to the seabed at the construction location and then leveled. Then the piles are inserted through the casings and driven into the seabed to the designed depth. The length of the steel piles is determined by the designed depth and the length of the casing. After the steel piles are in place, they should be 8 meters longer than the casing and used for socketing with the upper structure. The annular gap between the steel piles and the casing is connected by filling high-strength cement slurry.
[0005] When installing the existing quick-install deepwater conductor rack, due to its height and weight, it takes a long time and cost to lift and transport the conductor rack. At the same time, the conductor rack is too complicated during the installation process, which makes it impossible to install it quickly and effectively, thereby reducing the construction efficiency and increasing the construction cost, resulting in low installation efficiency and high cost when using the conductor rack, which cannot meet the existing usage needs. Utility Model Content
[0006] In view of the above-mentioned defects or deficiencies in the prior art, the present application aims to provide a fast-installed deepwater conductor frame, including a straight section casing, a main pipe is connected to the top of the straight section casing, the main pipe is a trapezoidal shape with a small top and a large bottom, and an 8m length is reserved at the bottom of the corner of the main pipe connection end. The plug piles sleeved inside the straight section casing penetrate the 8m length reserved at the bottom of the main pipe, and the annular gap between the plug pile and the straight section casing is connected by filling high-strength cement slurry. An air bag is arranged on the outside of the main pipe, and the air bag is fixed around the main pipe by tying. The length of the air bag is 20m and the diameter is 2m. The lower part of the straight section casing is fixed There is an annular fixing column, in which the plug pile is arranged, and the fixing column is sleeved on the outside of the plug pile, and the plug pile extending from the bottom of the fixing column is opposite to the upper opening of the clamping ring on the top of the casing, and the casing is arranged in a group of four to form a square shape. At this time, a plurality of connecting pipes are respectively sleeved in the connecting openings on the sides of the casing, and the casing and the connecting pipe are docked and installed by alignment, and the casing and the connecting pipe are vertically arranged with the notch inside the top of the counterweight plate, and at this time, the casing and the connecting pipe enter the notch, and when the counterweight plate sinks to the bottom of the sea, the traction rope is output from the casing due to the weight of the descending counterweight plate.
[0007] Preferably, the main pipe on the straight section casing is fixedly connected with a support plate, the plug pile is sleeved inside the straight section casing and the main pipe, the straight section end at the bottom of the main pipe and the upper end of the straight section casing are fixedly connected by high-strength bolts, the main pipe and the straight section casing are arranged in a group of four, the airbag is installed on the outer wall of the main pipe, and a single airbag can provide 60 tons of buoyancy.
[0008] Preferably, the sleeve is connected to the fixing column via a lower plug pile arranged on the clamping ring, the fixing column is configured as a cylindrical structure, and the fixing columns are configured in groups of four, the connecting pipes are connected to the side of the sleeve, and the connecting pipes are configured in groups of four.
[0009] Preferably, four traction ropes are provided at the bottom end of the casing, and the four traction ropes are respectively installed at the four corners of the inner wall of the slot, the counterweight plate is vertically connected to the upper conductor frame through the traction ropes, and a water inlet hole is provided on the top inner wall of the counterweight plate for water intake, and the counterweight plate is lowered by water entering the water inlet hole. Beneficial Effects
[0010] 1. The rapid installation of deepwater jackets is achieved by fixing air bags around the main pipes of the jacket in a lashing form. Each air bag can provide 60 tons of buoyancy. Before going out to sea, the air bags are fixed to the main pipes of the jacket and inflated. The deployment of the air bags enables operators to quickly hoist and transport the jacket, thereby further reducing the specifications of the installation ship and lifting equipment required for the hoisting of the upper part of the jacket, thereby greatly shortening the offshore operation process and time.
[0011] 2. The fast-installed deepwater conductor rack, when installing the conductor rack, insert the connecting pipe into the casing so that the installed connecting pipe and casing form a square. At this time, the connecting pipe is hoisted into the notch on the top of the counterweight plate, and the plug pile extending to the bottom of the fixed column can be inserted into the clamping ring, so that the fixed column and the straight section casing are installed on the top of the counterweight plate. At this time, the main pipe is hoisted and docked at the reserved 8m length position. Since there is a gap between the plug pile and the straight section casing, they are connected by filling high-strength cement slurry. After filling, the straight section end of the bottom of the main pipe is fixedly docked with the upper end of the straight section casing by using high-strength bolts. Therefore, the split installation of the conductor rack has the advantages of simple installation and simplified installation process, which not only improves the installation efficiency but also reduces the construction cost, thereby achieving the benefit of fast installation of the conductor rack. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0013] Figure 1 This is a schematic diagram of the unfolded structure of the utility model for quickly installing a deepwater jacket;
[0014] Figure 2 This is a schematic diagram of the closure structure of the deepwater jacket for rapid installation according to the utility model;
[0015] Figure 3 This is a schematic diagram of the utility model for quickly installing a deepwater conductor frame lashing airbag structure;
[0016] Figure 4 This is a schematic diagram of the internal structure of the utility model for quickly installing a deepwater jacket;
[0017] Figure 5 It is a schematic diagram of the structure of the counterweight plate of the utility model from top view.
[0018] In the figure: 1. straight section casing; 2. main pipe; 3. pile; 4. support plate; 5. air bag; 6. fixing column; 7. high-strength bolt; 8. casing; 9. clamping ring; 10. connecting pipe; 11. traction rope; 12. counterweight plate; 13. notch. DETAILED DESCRIPTION
[0019] The present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the relevant utility model, rather than to limit the utility model. It is also necessary to explain that, for ease of description, only the parts related to the utility model are shown in the accompanying drawings.
[0020] The accompanying drawings in the embodiments of the present invention: different types of section lines in the drawings are not marked according to national standards, nor do they impose any requirements on the materials of the components. Instead, they are used to distinguish the cross-sectional views of the components in the drawings.
[0021] See also Figure 1-5 A fast-installed deepwater jacket, comprising a straight section casing 1, a main pipe 2 is connected above the straight section casing 1, the main pipe 2 is a trapezoidal shape with a small top and a large bottom, an 8m length is reserved at the bottom of the corner of the connecting end of the main pipe 2, a plug pile 3 sleeved inside the straight section casing 1 penetrates the 8m length reserved at the bottom of the main pipe 2, the annular gap between the plug pile 3 and the straight section casing 1 is connected by filling high-strength cement slurry, an air bag 5 is arranged outside the main pipe 2, the air bag 5 is fixed around the main pipe 2 by tying, the length of the air bag 5 is 20m, and the diameter is 2m, an annular fixing column 6 is fixed at the bottom of the straight section casing 1, the plug pile 3 is arranged inside the fixing column 6, and the fixing The fixed column 6 is sleeved on the outside of the plug pile 3, and the plug pile 3 extending from the bottom of the fixed column 6 is opposite to the upper opening of the clamping ring 9 on the top of the casing 8. The casing 8 is arranged in a group of four to form a square shape. At this time, multiple connecting pipes 10 are respectively sleeved in the connecting ports on both sides of the casing 8. The casing 8 and the connecting pipe 10 are docked and installed by alignment. The casing 8 and the connecting pipe 10 are vertically arranged with the notch 13 inside the top of the counterweight plate 12. At this time, the casing 8 and the connecting pipe 10 enter the notch 13. When the counterweight plate 12 sinks to the bottom of the sea, the traction rope 11 is output from the casing 8 due to the descending weight of the counterweight plate 12.
[0022] Among them, the support plate 4 is fixedly connected to the main pipe 2 arranged on the straight section casing 1, the pile 3 is sleeved inside the straight section casing 1 and the main pipe 2, the straight section end at the bottom of the main pipe 2 is fixedly connected to the upper end of the straight section casing 1 by high-strength bolts 7, the main pipe 2 and the straight section casing 1 are arranged in a group of four, the airbag 5 is installed on the outer wall of the main pipe 2, and a single airbag 5 can provide 60 tons of buoyancy.
[0023] The sleeve 8 is connected to the fixed column 6 through the plug 3 set on the clamping ring 9. The fixed column 6 is set as a cylindrical structure, and the fixed column 6 is set in a group of four. The connecting pipe 10 is connected to the side of the sleeve 8, and the connecting pipe 10 is set in a group of four.
[0024] Among them, four traction ropes 11 are provided at the bottom end of the casing 8, and the four traction ropes 11 are respectively installed at the four corners of the inner wall of the slot 13, and the counterweight plate 12 is vertically connected to the upper conductor frame through the traction rope 11. A water inlet hole is provided on the top inner wall of the counterweight plate 12 for water inlet, and the counterweight plate 12 descends through water entering the water inlet hole.
[0025] When in use, the airbag 5 is fixed around each main pipe 2 of the conductor frame in a lashing form, and each airbag 5 can provide 60 tons of buoyancy. Before going out to sea, the airbag 5 is fixed to the conductor frame main pipe 2, and the airbag 5 fixed on the main pipe 2 is inflated. The deployment of the airbag 5 enables the operator to quickly hoist and transport the conductor frame, thereby further reducing the installation ship and lifting equipment specifications required for the hoisting of the upper half of the conductor frame, thereby greatly shortening the offshore operation process and time. When installing the conductor frame, the connecting pipe 10 is inserted into the casing 8, so that the installed connecting pipe 10 and the casing 8 form a square. At this time, the connecting pipe 10 is hoisted to the counterweight In the notch 13 at the top of the plate 12, the pile 3 extending to the bottom of the fixed column 6 can be inserted into the clamping ring 9, so that the fixed column 6 and the straight section casing 1 are installed on the top of the counterweight plate 12. At this time, the main pipe 2 is hoisted and docked at the reserved 8m length position. Since there is a gap between the pile 3 and the straight section casing 1 in the ring, they are connected by filling high-strength cement slurry. After filling, the straight section end of the bottom of the main pipe 2 and the upper end of the straight section casing 1 are fixedly docked by using high-strength bolts 7. Therefore, the split installation of the conductor rack has the advantages of simple installation and simplified installation process, which not only improves the installation efficiency but also reduces the construction cost, thereby achieving the benefit of rapid installation of the conductor rack.
[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0027] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the utility model involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the concept of the utility model. For example, the above features are replaced with the technical features with similar functions disclosed in the present application (but not limited to) by each other to form a technical solution.
Claims
1. A quick-install deepwater conductor rack, comprising a straight section casing (1), Features: A main pipe (2) is connected to the top of the straight section casing (1). The main pipe (2) is a trapezoidal shape with a small top and a large bottom. An 8m length is reserved at the bottom of the corner of the connection end of the main pipe (2). The plug pile (3) sleeved inside the straight section casing (1) passes through the 8m length reserved at the bottom of the main pipe (2). The annular gap between the plug pile (3) and the straight section casing (1) is connected by filling high-strength cement slurry. An air bag (5) is arranged outside the main pipe (2). The air bag (5) is fixed around the main pipe (2) by tying. The length of the air bag (5) is 20m and the diameter is 2m. An annular fixing column (6) is fixed at the bottom of the straight section casing (1). The plug pile (3) is arranged inside the fixing column (6). The fixing column (6) is sleeved on Outside the plug pile (3), the plug pile (3) extending from the bottom of the fixing column (6) is directly opposite to the upper opening of the clamping ring (9) at the top of the casing (8). The casing (8) is arranged in a group of four to form a square shape. At this time, a plurality of connecting pipes (10) are respectively sleeved in the connecting openings on the sides of the casing (8). The casing (8) and the connecting pipe (10) are butt-jointed and installed by alignment. The casing (8) and the connecting pipe (10) are vertically arranged with the notch (13) at the top of the counterweight plate (12). At this time, the casing (8) and the connecting pipe (10) enter the notch (13). When the counterweight plate (12) sinks to the seabed, the traction rope (11) is output from the casing (8) by the weight of the counterweight plate (12) falling.
2. A fast-installed deepwater jacket according to claim 1, Features: The main pipe (2) on the straight section casing (1) is fixedly connected with a support plate (4), the plug pile (3) is sleeved inside the straight section casing (1) and the main pipe (2), the straight section end at the bottom of the main pipe (2) and the upper end of the straight section casing (1) are fixedly connected by high-strength bolts (7), the main pipe (2) and the straight section casing (1) are arranged in a group of four, the airbag (5) is installed on the outer wall of the main pipe (2), and a single airbag (5) can provide a buoyancy of 60 tons.
3. A fast-installed deepwater jacket according to claim 1, Features: The sleeve (8) is connected to the fixed column (6) via a plug pile (3) arranged on a clamping ring (9); the fixed column (6) is configured as a cylindrical structure, and the fixed columns (6) are configured in groups of four; the connecting pipe (10) is connected to the side of the sleeve (8), and the connecting pipe (10) is configured in groups of four.
4. A fast-installed deepwater jacket according to claim 1, Features: Four traction ropes (11) are provided at the bottom end of the casing (8), and the four traction ropes (11) are respectively installed at the four corners of the inner wall of the slot (13); the counterweight plate (12) is vertically connected to the upper conductor pipe frame through the traction ropes (11); a water inlet hole for water inlet is provided on the top inner wall of the counterweight plate (12); the counterweight plate (12) descends when water enters the water inlet hole.