Split type shield launching well and tunnel connecting structure applied to nuclear power plant
Through the split shield starting well and tunnel connection structure of the nuclear power plant, the split design of the temporary shield well and the siphon shield comprehensive well is solved, and the construction progress is accelerated and Shorten the construction period.
Patent Information
- Application Number
- CN202420456076.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-08
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-08
AI Technical Summary
When the nuclear power plant is constructed in the sea, the construction of the siphon shield-integrated well is affected by the shield-integrated well, which leads to the extension of the construction cycle and cannot meet the overall construction progress needs of the nuclear power plant.
Design a split shield originating well and tunnel connection structure, including temporary shield shaft in land area and siphon shield comprehensive well in sea area, connecting both through shield tunnel, and carrying out construction on the land area part in the early stage of construction , wait for the construction of the sea area to be carried out simultaneously to shorten the construction period.
Through early construction on the land area, the construction period is shortened, waiting time is saved, the construction progress is accelerated, and the overall construction progress needs of the nuclear power plant are met.
Smart Images

Figure CN221973520U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of nuclear power drainage siphon shield integrated wells, in particular to a split shield launching well and tunnel connection structure applied to a nuclear power plant. Background Art
[0002] Nuclear power plants usually use long-distance drainage through tunnels for drainage. This structural method requires auxiliary drainage through siphon shield integrated wells. Figure 1 and Figure 2 As shown, the existing drainage structure is usually deepened at the front end of the siphon shield integrated well to form a shield working well, and the siphon shield integrated well and the shield well are merged into a whole to meet the needs of the shield machine to pass.
[0003] Since there are special requirements for the construction time in the sea area, and the construction of the siphon shield integrated well is affected by the shield starting well, the construction of the siphon shield integrated well needs to be started after the construction of the shield starting well is completed. The two cannot be constructed in parallel, so the construction will be carried out one by one after the sea area can be constructed, which will extend the construction period. In addition, due to the influence of various deadlines when constructing in the coastal area, the layout and construction are greatly limited, which further extends the construction period and makes it difficult to meet the requirements of the overall construction progress of the nuclear power plant. Utility Model Content
[0004] The technical problem to be solved by the utility model is to provide a split shield launching shaft and tunnel connection structure applied to a nuclear power plant.
[0005] The utility model adopts the following technical solutions:
[0006] A split shield launching shaft and tunnel connection structure for use in a nuclear power plant is constructed, comprising:
[0007] The temporary shield shaft located on land is connected to the ground through the rear pilot tunnel;
[0008] The siphon shield complex shaft located in the sea area is connected to the nuclear power plant drainage system; and
[0009] A shield tunnel, comprising a transverse passage, a connecting section, a shield section, and a mine section that is backfilled after the transverse passage is connected to the connecting section, wherein the mine section is partially located in the sea area and partially located in the land area, one end of which is connected to the temporary shield shaft, and the other end is connected to one end of the connecting section, one end of the transverse passage is connected to the siphon shield integrated shaft, and the other end is connected to the other end of the mine section and one end of the connecting section, and the other end of the connecting section is connected to the shield section;
[0010] Wherein, the transverse passage includes a first main body section and a first pre-connection section, the mine section includes a second main body section and a second pre-connection section, two ends of the second pre-connection section are respectively connected to the second main body section and the connection section, and two ends of the first pre-connection section are respectively connected to the first main body section and the second pre-connection section and the connection section;
[0011] The first pre-connection section, the second pre-connection section and the connection section together define a connection tunnel, one end of the connection tunnel is connected to the first main section, and the other end is connected to the shield section.
[0012] In some embodiments, the first pre-connection section is defined by a backfill area, a main space, and an expansion area, and the second pre-connection section is defined by a filling area and a non-filling area;
[0013] The backfill area and the expansion area are respectively located on both sides of the main space, and the regional axis defined by the main space and the expansion area is curved; the filling area is located on the side of the non-filling area away from the connecting section;
[0014] The main space, the expanded excavation area, the non-filled area and the connecting section are respectively connected and together define the connecting tunnel.
[0015] In some embodiments, the backfill area and the filling area are connected and both are filled with concrete.
[0016] In some embodiments, a cast lining layer and a sprayed mix layer are provided inside the connecting tunnel. The sprayed mix layer is provided between the cast lining layer and the rock wall defining the cross channel, and the sprayed mix layer covers the half circle side of the section where the expansion area is located.
[0017] In some embodiments, a three-layer structure is arranged inside the first main section, which, from the outside to the inside, are a sprayed anchor support lining layer, a concrete cast lining layer, and a concrete lining layer.
[0018] In some embodiments, the thickness of the sprayed anchor support lining layer is 100 mm, the thickness of the concrete cast lining layer is 300 mm, and the thickness of the concrete lining layer is 650 mm.
[0019] In some embodiments, a three-layer structure is arranged inside the mine section, which are a primary support layer, a second lining layer and a third lining layer from the outside to the inside.
[0020] In some embodiments, the thickness of the primary supporting layer is 100 mm, the thickness of the secondary lining layer is 300 mm, and the thickness of the tertiary lining layer is 650 mm.
[0021] In some embodiments, the temporary shield shaft includes an upper space formed by a rock wall and a lower space connected to the lower end of the upper space, and the inner wall surface of the rock wall defining the upper space is vertically provided with bite piles and a plurality of ring beams horizontally connected to the inner circle of the bite piles along the circumferential direction;
[0022] Anchor rods and sprayed concrete are buried circumferentially in the rock wall defining the lower space.
[0023] In some embodiments, at least one inclined beam is horizontally arranged in the upper space, and two ends of the inclined beam are respectively connected to different positions of the ring beam.
[0024] The utility model has the following advantages:
[0025] The utility model constructs a temporary shield shaft and a mining section, so that the construction of the temporary shield shaft and the mining section on land can be carried out before the construction time reaches the sea area. After the construction time reaches the sea area, the mining section and the connecting section connected thereto and even part of the shield section can be constructed synchronously with the siphon shield integrated shaft and the cross channel, so as to save waiting time, shorten the construction period and speed up the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the technical solution of the utility model, the utility model will be further described below in conjunction with the accompanying drawings and embodiments. It should be understood that the following drawings only show certain embodiments of the utility model, and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0027] Figure 1 It is a schematic diagram of the planar structure of a siphon shield integrated well in the prior art;
[0028] Figure 2 yes Figure 1 The schematic diagram of the cross-section structure of the siphon shield integrated shaft shown;
[0029] Figure 3 It is a structural schematic diagram of a split shield launching shaft and tunnel connection structure applied to a nuclear power plant in the first embodiment of the utility model;
[0030] Figure 4 yes Figure 3 A partial enlarged view of the shield tunnel in Figure 1;
[0031] Figure 5 yes Figure 4 Schematic diagram of the cross-sectional structure of the connecting tunnel in FIG.
[0032] Figure 6 yes Figure 4 A schematic diagram of the cross-sectional structure of the first main body section in FIG.
[0033] Figure 7 yes Figure 4 Schematic diagram of the cross-sectional structure of the mine section;
[0034] Figure 8 yes Figure 3 Schematic diagram of the structure of the temporary shield shaft;
[0035] Fig. 9 yes Figure 8 Schematic diagram of the cross-sectional structure of the upper space of the temporary shield shaft shown. DETAILED DESCRIPTION
[0036] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation methods of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "rear", "up", "down", "left", "right", "vertical", "horizontal", "bottom", "inside", "inside", "outside", etc. are based on the directions or positional relationships shown in some of the drawings, and are constructed and operated in a specific direction. They are only for the convenience of describing the present technical solution, and do not indicate that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.
[0037] It should also be noted that, unless otherwise clearly specified and limited, the terms such as "installed", "connected", "connected", "fixed", "set" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. When an element is referred to as being "on" or "under" another element, the element can be "directly" or "indirectly" located on the other element, or there may be one or more intermediate elements. The terms "first", "second", etc. are only for the convenience of describing the present technical solution, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.
[0038] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention can also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid unnecessary details that hinder the description of the present invention.
[0039] Figures 3 to 9 The utility model shows a split shield starting shaft and tunnel connection structure 1 used in a nuclear power plant in one embodiment, which is used to connect the drainage system of the nuclear power plant to achieve long-distance drainage. The split shield starting shaft and tunnel connection structure 1 includes a temporary shield shaft 10, a siphon shield integrated shaft 20, a shield tunnel 30 and a rear guide tunnel. The temporary shield shaft 10 is shielded in the land area and connected to the ground through a rear guide tunnel (not shown in the figure), which is used for early construction before the construction of the sea area. The siphon shield integrated shaft 20 is located in the sea area and is connected to the drainage system of the nuclear power plant. It is used to carry out permanent construction work through the siphon shield integrated shaft 20 after the construction of the sea area begins, and to drain water after the construction is completed.
[0040] The shield tunnel 30 includes a mine section 31, a transverse passage 32, a connecting section 33 and a shield section 34. The mine section 31 is partially located on land and partially located in the sea. One end of the mine section 31 is connected to the temporary shield shaft 10, and the other end is connected to one end of the connecting section 33. After the transverse passage 32 is connected to the connecting section 33, backfilling is performed to ensure the uniqueness of the subsequent drainage channel. One end of the transverse passage 32 is connected to the siphon shield integrated shaft 20, and the other end is connected to the other end of the mine section 31 and one end of the connecting section 33. The other end of the connecting section 33 is connected to one end of the shield section 34.
[0041] The transverse passage 32 includes a first main body section 323 and a first pre-connection section 322, and the mine section 31 includes a second main body section 311 and a second pre-connection section 312. The two ends of the second pre-connection section 312 are respectively connected to the second main body section 311 and the connection section 33. One end of the first pre-connection section 322 is connected to the first main body section 321, and the other end is connected to the second pre-connection section 312 and the connection section 33.
[0042] The first pre-connection section 322, the second pre-connection section 312 and the connection section 33 define a connection tunnel, one end of which is connected to the first main section 321, and the other end is connected to the shield section 34. Thus, a closed and unique drainage passage is formed among the siphon shield integrated shaft 20, the first main section 321, the connection tunnel and the shield section 34, and the wastewater from the nuclear power plant is discharged to the sea at a long distance through the drainage system and the unique drainage passage.
[0043] Since the temporary shield shaft 10 and part of the mine section 31 located on land are constructed in advance, the construction progress can be advanced. After reaching the sea area construction time, part of the mine section 31 located in the sea area and the siphon shield integrated shaft 20 can be constructed synchronously. During the construction of the siphon shield integrated shaft 20 and the transverse passage 32 connected to the siphon shield integrated shaft 20, part of the mine section 31 located in the sea area and the connecting section 33 (even part of the shield section 34) connected to the mine section 31 have been synchronously constructed. When the construction of the transverse passage 32 is completed, it is only necessary to form a connecting tunnel between the first pre-connection section 322 of the transverse passage 32, the second pre-connection section 312 of the mine section 31 and the connecting section 33 by drilling and blasting, so as to realize the formation of a unique drainage channel. At this time, the remaining mine section 31 that has completed its existence can be backfilled to prevent the wastewater in the drainage channel from flowing into the mine section. Subsequently, the unfinished shield section 34 can be continued through the siphon shield integrated shaft 20, the first main section 321 and the connecting tunnel until it is extended to a suitable position, completing the construction of the split shield starting shaft and the tunnel connecting structure 1, and then starting the long-distance drainage operation.
[0044] It should be understood that the temporary shield shaft 10 and part of the mining section 31 are located on land, which means that they are located underground in the land area; the siphon shield complex shaft 20, cross passage 32, connecting section 33, shield section 34 and part of the mining section 31 are located in the sea area, which means that they are located under the crust of the ocean area, and not in the seawater environment of the ocean.
[0045] like Figure 3 and Figure 4 As shown, in some embodiments, the shield tunnel 30 is roughly Y-shaped, and the mine section 31 , the cross channel 32 and the shield section 34 are three sides of the Y-shape, which converge at the connecting section 33 .
[0046] In this embodiment, the partial section of the mining section 31 close to the connecting section 33, the connecting section 33 and the shield section 34 are coaxially arranged, the first main section 321 is inclined, and the first pre-connecting section 322 is curved.
[0047] It should be understood that the mining section 31 and / or the cross passage 32 and / or the connecting section 33 and / or the shield section 34 may avoid and be tilted / bent due to the rock structure of the earth's crust and other reasons. Therefore, in some other optional embodiments, the partial section of the mining section 31 close to the connecting section 33, the connecting section 33 and the shield section 34 may also be arranged in a non-coaxial manner, and the first main section 321 may also not be arranged at an inclination.
[0048] In some embodiments, the first pre-connection section 322 is defined by a backfill area 3221 , a main space 3222 , and an expanded excavation area 3223 , and the second pre-connection section 312 is defined by a filling area 3121 and a non-filling area 3122 .
[0049] The backfill area 3221 and the expansion area 3223 are respectively located on both sides of the main space 3222, and the regional axis defined by the main space 3222 and the expansion area 3223 is curved. The filling area 3121 is located on the side of the non-filling area 3122 away from the connecting section 33. The main space 3222, the expansion area 3223, the non-filling area 3122 and the connecting section 33 are interconnected, and together define the connecting tunnel, connecting the first main section 321 and the shield section 34 to form a unique drainage tunnel.
[0050] In this embodiment, the expansion area 3223 is located on a side of the main space 3222 close to the shield segment 34 , and the backfill area 3221 is located on a side of the main space 3222 away from the shield segment 34 .
[0051] It should be understood that the above-mentioned tunnel connection method is formed by drilling and blasting excavation method, which is an existing construction method.
[0052] In this embodiment, the area defined by the backfill area 3221 and the main space 3222 is coaxially arranged with the first main body section 321. It should be understood that, due to the above reasons, in some other optional embodiments, the area defined by the two may not be coaxially arranged with the first main body section 321.
[0053] In some embodiments, the backfill area 3221 and the filling area 3121 are connected and are filled with concrete to provide support for the connecting tunnel.
[0054] In some other optional embodiments, the backfill area 3221 and the filling area 3121 may not be connected, and both are filled with concrete.
[0055] like Figure 5 As shown, in some embodiments, a molded lining layer and a sprayed mixed layer are provided inside the connecting tunnel, wherein the molded lining layer covers the entire connecting tunnel. The sprayed mixed layer is provided between the rock wall defining the transverse passage 32 and the molded lining layer, and only covers the half circle side of the section where the expanded excavation area 3223 is located. The two cooperate to improve the supporting strength of the connecting tunnel.
[0056] like Figure 6As shown, in some embodiments, a three-layer lining structure is arranged inside the first main section 321, which, from outside to inside (from the rock wall close to the first main section 321 to the rock wall far away from it), are respectively a shotcrete support lining layer, a concrete support lining layer and a concrete lining layer.
[0057] Specifically, the thickness of the sprayed anchor support lining layer is 100 mm, the thickness of the concrete support lining layer is 300 mm, and the thickness of the concrete lining layer is 650 mm.
[0058] In some embodiments, the cross-section of the spray anchor support lining layer is circular, and the cross-section shapes of the concrete support lining layer and the concrete lining layer are both round on one side and square on the other side (in Figure 6 The irregular shape is a circle in the upper half and a square in the lower half. Therefore, two spaces are formed between the spray anchor support lining layer and the concrete support lining layer, and the two spaces are filled with concrete.
[0059] like Figure 7 As shown, in some embodiments, the interior of the mine section 31 is provided with a three-layer structure, which from the outside to the inside (from the rock wall close to the mine section 31 to the rock wall far away from it) are respectively the primary support layer, the second lining layer and the third lining layer.
[0060] Specifically, the thickness of the primary support layer is 100 mm, and anchor rods and a single-layer steel mesh with a hole diameter of φ8 are arranged within a range of 120° to strengthen the support. The thickness of the second lining layer is 300 mm, and concrete is poured inside. The thickness of the third lining layer is 650 mm, and concrete is filled inside for further reinforcement.
[0061] In some embodiments, the mine section 31 is also provided with an advance small conduit, one end of which is arranged in the second lining layer and the other end extends to the outside, which is used to inject reinforcement slurry into the second lining layer for filling during the excavation process to achieve support.
[0062] like Figure 8 As shown, in some embodiments, the temporary shield shaft 10 includes an upper space 11 and a lower space 12 formed by rock walls, and the upper space 11 is connected to the lower space 12. In the rock wall defining the upper space 11, there are also bite piles 13 and multiple ring beams 14 arranged along the circumference to solve the problems caused by different depths and different soil geology. Anchor rods and sprayed concrete are buried along the circumference in the rock wall defining the lower space 12.
[0063] Specifically, the engagement pile 13 is not arranged vertically along the rock wall of the upper space 11. A plurality of ring beams 14 are distributed at intervals along the radial direction, and each ring beam 14 is horizontally connected to the inner circle of the engagement pile 13 to strengthen the support.
[0064] Read also Fig. 9In some embodiments, at least one inclined beam 15 is horizontally arranged in the upper space 11, and its two ends are respectively connected to different positions of the ring beam 14 to support the ring beam 14 and avoid the collapse of the temporary shield shaft 10.
[0065] Specifically, in this embodiment, the temporary shield shaft 10 is in a cube shape, and its horizontal cross-section is rectangular, so the ring beam 14 is a rectangular ring beam, and each ring beam 14 is correspondingly provided with four inclined beams 15, and the two ends of each inclined beam 15 are respectively connected to two adjacent sides of the ring beam 14.
[0066] In this embodiment, the ring beam 14 is provided at intervals of approximately 4.5 m.
[0067] It should be understood that the siphon shield integrated well 20 can be implemented using existing technologies.
[0068] In the specific construction process, it is first necessary to excavate the rear pilot tunnel, temporary shield shaft 10 and part of the mine section 31 located on land before the sea construction can be carried out.
[0069] Furthermore, after reaching the sea area construction time, the remaining part of the mine section 31 continues to be excavated, and the connecting section 33 and the shield section 34 continue to be excavated along the mine section 31.
[0070] Simultaneously, the construction of the siphon shield integrated shaft 20 is started, and after the construction of the siphon shield integrated shaft 20 is completed, the construction of the transverse passage 32 is continued by the drilling and blasting method until the first main section 321 of the transverse passage 32 and the backfill area 3221 and the main space 3222 of the first pre-connection section 322 are completed.
[0071] Furthermore, the second main section 311 of the mine section 31, the filling area 3121 of the second pre-connection section 312, and the backfill area 3221 of the transverse passage 32 are backfilled by drilling and blasting.
[0072] Furthermore, the rock walls and primary support structures corresponding to the main space 3222 of the transverse passage 32 and the expanded excavation area 3223 are demolished, and the expanded excavation area 3223 is expanded.
[0073] Furthermore, concrete is sprayed on the rock wall of the expanded excavation area 3223, a mesh is hung, anchor rods are driven, and concrete is continued to be sprayed for support.
[0074] Furthermore, the interconnected connecting tunnels are lined to form a molded lining layer.
[0075] Furthermore, the shield section 34 is continuously constructed through the siphon shield integrated shaft 20, the first main section 321, and the connecting tunnel until the construction reaches the target position.
[0076] It can be understood that the above embodiments only express the preferred implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the utility model. It should be pointed out that, for ordinary technicians in this field, without departing from the concept of the utility model, the above-mentioned technical features can be freely combined, and several deformations and improvements can be made, which all belong to the protection scope of the utility model. Therefore, all equivalent changes and modifications made to the scope of the claims of the utility model should fall within the scope of the claims of the utility model.
Claims
1. A split shield launching shaft and tunnel connection structure used in nuclear power plants. It is characterized in that include: A temporary shield shaft (10) located on land is connected to the ground through a rear pilot tunnel; A siphon shield integrated well (20) located in the sea area is connected to the nuclear power plant drainage system; as well as A shield tunnel (30), comprising a transverse passage (32), a connecting section (33), a shield section (34), and a mine section (31) which is backfilled after the transverse passage (32) is connected to the connecting section (33); the mine section (31) is partially located in the sea area and partially located in the land area, one end of the mine section is connected to the temporary shield shaft (10), and the other end is connected to one end of the connecting section (33); one end of the transverse passage (32) is connected to the siphon shield integrated shaft (20), and the other end is connected to the other end of the mine section (31) and one end of the connecting section (33); the other end of the connecting section (33) is connected to the shield section (34); The transverse passage (32) comprises a first main body section (321) and a first pre-connection section (322); the mine section (31) comprises a second main body section (311) and a second pre-connection section (312); two ends of the second pre-connection section (312) are respectively connected to the second main body section (311) and the connection section (33); and two ends of the first pre-connection section (322) are respectively connected to the first main body section (321) and the second pre-connection section (312) and the connection section (33); The first pre-connection section (322), the second pre-connection section (312) and the connection section (33) together define a connection tunnel, one end of the connection tunnel is connected to the first main section (321), and the other end is connected to the shield section (34).
2. According to claim 1, the split shield launching shaft and tunnel connection structure used in nuclear power plants, It is characterized in that The first pre-connection section (322) is defined by a backfill area (3221), a main space (3222) and an expansion area (3223), and the second pre-connection section (312) is defined by a filling area (3121) and a non-filling area (3122); The backfill area (3221) and the expanded excavation area (3223) are respectively located on both sides of the main space (3222), and the regional axis defined by the main space (3222) and the expanded excavation area (3223) is arranged in a curved manner; the filling area (3121) is located on a side of the non-filling area (3122) away from the connecting section (33); The main space (3222), the expanded excavation area (3223), the non-filled area (3122) and the connecting section (33) are respectively connected and together define the connecting tunnel.
3. According to claim 2, the split shield launching shaft and tunnel connection structure used in a nuclear power plant, It is characterized in that The backfill area (3221) and the filling area (3121) are connected and are both filled with concrete.
4. According to claim 2, the split shield launching shaft and tunnel connection structure used in a nuclear power plant, It is characterized in that A cast lining layer and a sprayed mix layer are arranged inside the connecting tunnel. The sprayed mix layer is arranged between the cast lining layer and the rock wall defining the transverse passage (32). The sprayed mix layer covers the half circle side of the section where the expansion area (3223) is located.
5. According to claim 1, the split shield launching shaft and tunnel connection structure used in a nuclear power plant, It is characterized in that The first main body section (321) is internally provided with a three-layer structure, which, from the outside to the inside, are respectively a sprayed anchor support lining layer, a concrete molded lining layer, and a concrete lining layer.
6. The split shield launching shaft and tunnel connection structure for use in a nuclear power plant according to claim 5, It is characterized in that The thickness of the sprayed anchor support lining layer is 100 mm, the thickness of the concrete cast lining layer is 300 mm, and the thickness of the concrete lining layer is 650 mm.
7. The split shield launching shaft and tunnel connection structure for use in a nuclear power plant according to claim 1, It is characterized in that The mine section (31) is internally provided with a three-layer structure, which, from the outside to the inside, are respectively a primary support layer, a second lining layer and a third lining layer.
8. The split shield launching shaft and tunnel connection structure for use in a nuclear power plant according to claim 7, It is characterized in that The thickness of the primary supporting layer is 100 mm, the thickness of the secondary lining layer is 300 mm, and the thickness of the tertiary lining layer is 650 mm.
9. The split shield launching shaft and tunnel connection structure for use in a nuclear power plant according to claim 1, It is characterized in that The temporary shield shaft (10) comprises an upper space (11) formed by a rock wall and a lower space (12) connected to the lower end of the upper space (11); the inner wall surface of the rock wall defining the upper space is vertically provided with engaging piles (13) and a plurality of ring beams (14) horizontally connected to the inner circle of the engaging piles (13); Anchor rods and sprayed concrete are buried circumferentially in the rock wall defining the lower space (12).
10. The split shield launching shaft and tunnel connection structure for use in a nuclear power plant according to claim 9, It is characterized in that At least one inclined beam (15) is also horizontally arranged in the upper space (11), and two ends of the inclined beam (15) are respectively connected to different positions of the ring beam (14).