High-nitrate water recycling and conveying pipeline for primary brine

By using the double-layer structure and limiting components of arc pipe A and arc pipe B in a brine high-nitrification process, the problem of permeability of bent pipes is solved, the mechanical strength and heat insulation effect are improved, and leakage is reduced risk and improves the maintenance of the pipeline.

CN222142367UActive Publication Date: 2024-12-10ZHENJIANG SALINIZATION CO LTD OF CHINA NATALT IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323502119.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-12-10
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

The existing bent pipes are susceptible to fluid impact pressure in a brine high-nitrification water process, causing corrosion damage and leakage failure, affecting the progress of the salt making process.

Method used

A double-layer structure conveying pipeline including arc-shaped pipe A and arc-shaped pipe B is designed. Through the cooperation of the limiting assembly and sealing groove, a double-layer structure is formed to enhance mechanical strength and thermal insulation effect, and between the inner and outer pipes. Set up seals to reduce leakage risk.

Benefits of technology

It effectively improves the compressive resistance of the elbow, reduces thermal stress and thermal fatigue, reduces the risk of environmental pollution, and facilitates maintenance and replacement of pipelines, improving overall practicality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222142367U_ABST
    Figure CN222142367U_ABST
Patent Text Reader

Abstract

The utility model discloses a high-nitrate water recycling and conveying pipeline for primary brine, which is characterized by comprising an arc-shaped pipeline A. An arc-shaped pipeline B is arranged in the arc-shaped pipeline A; the arc-shaped pipeline A is matched with the arc-shaped pipeline B, flange plates are arranged at the two ends of the arc-shaped pipeline A, limiting assemblies are arranged on the flange plates, the limiting assemblies are connected to the arc-shaped pipeline A, and the arc-shaped pipeline B is limited in an inner cavity of the arc-shaped pipeline A; the utility model has the beneficial effects that through the matching between the arc-shaped pipeline A and the arc-shaped pipeline B, a double-layer structure can be conveniently formed, the overall mechanical strength of the elbow can be effectively enhanced and the anti-pressure capability of the elbow can be improved when liquid is conveyed in the salt manufacturing process, and the arc-shaped pipeline A and the arc-shaped pipeline B are connected through the limiting assembly, so that the safety of the elbow is improved. And the arc-shaped pipeline B can be conveniently maintained and replaced later, and the overall practicability is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a primary salt water high nitrate water recovery and transportation pipeline. Background Art

[0002] In the process of producing primary brine and high nitrate water in salt production, the fluid needs to be transported and processed through pipelines. During the installation of the pipelines, multiple sets of elbows need to be installed to adjust the position of the pipeline connections. However, during the use of existing elbows, the elbow parts are often subjected to large fluid impact pressure, which is prone to corrosion damage and leakage failures, affecting the progress of the salt production process. In view of this, the utility model proposes a primary brine and high nitrate water recovery and transportation pipeline to solve the above problems. Utility Model Content

[0003] The utility model aims to provide a primary brine high-nitrate water recovery and transportation pipeline to solve the problems raised in the above-mentioned background technology.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A primary brine high-nitrate water recovery and transportation pipeline, comprising an arc-shaped pipeline A, wherein an arc-shaped pipeline B is arranged inside the arc-shaped pipeline A;

[0006] The arc-shaped pipe A and the arc-shaped pipe B are adapted to each other. Flanges are provided at both ends of the arc-shaped pipe A. A limiting component is provided on the flange. The limiting component is connected to the arc-shaped pipe A to limit the arc-shaped pipe B in the inner cavity of the arc-shaped pipe A.

[0007] As an improvement of the above technical solution, the inner wall of the arc-shaped pipe A is provided with a guide groove, and the outer wall of the arc-shaped pipe B is provided with a guide strip;

[0008] The guide strip is matched with the guide groove.

[0009] As an improvement of the above technical solution, the outer wall of the arc-shaped pipe B is in contact with the inner wall of the arc-shaped pipe A.

[0010] As an improvement of the above technical solution, the limit assembly includes a connecting plate, and a plurality of connecting holes are provided on the connecting plate;

[0011] The connection hole position matches the flange.

[0012] As an improvement of the above technical solution, an extension pipe is provided on the connection plate, and the connection plate is provided in the middle of the extension pipe;

[0013] The extension pipe extends into the inner cavity of the arc-shaped pipe B.

[0014] As an improvement of the above technical solution, two groups of sealing grooves are provided on the extension pipe, and sealing strips are provided in the sealing grooves.

[0015] As an improvement of the above technical solution, the sealing groove is symmetrically arranged with a connecting plate.

[0016] Compared with the prior art, the beneficial effects of the utility model are:

[0017] During use, the arc-shaped pipe B is extended into the inner cavity of the arc-shaped pipe A to form a double-layer structure, and then the limiting component is installed on the flange, and the arc-shaped pipe B is limited by the limiting component;

[0018] Through the coordination between the arc pipe A and the arc pipe B set up as above, a double-layer structure can be formed. When transporting liquid in the salt making process, the overall mechanical strength of the elbow can be effectively enhanced and its pressure resistance can be improved. The air layer between the double shells has a heat insulating effect, which can reduce thermal stress and thermal fatigue. At the same time, if the inner pipe leaks, the outer shell can play a secondary containment role to reduce the risk of environmental pollution. Moreover, the arc pipe A and the arc pipe B are connected by a limit assembly, which can facilitate the subsequent maintenance and replacement of the arc pipe B, thereby improving the overall practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the structure of the utility model;

[0020] Figure 2 This is an explosion diagram of the utility model;

[0021] Figure 3 It is a structural schematic diagram of the extension pipeline of the utility model;

[0022] Figure 4 It is a schematic diagram of the assembly of the arc-shaped pipeline A and the arc-shaped pipeline B of the utility model.

[0023] In the figure: 10, arc pipe A; 11, guide groove; 20, arc pipe B; 21, guide strip; 30, limit assembly; 31, connecting hole; 311, sealing groove; 32, connecting plate; 33, extension pipe; 40, flange. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] Example:

[0026] like Figure 1-4 As shown, this embodiment proposes a primary brine high-nitrate water recovery and transportation pipeline, including an arc-shaped pipeline A10, wherein an arc-shaped pipeline B20 is arranged inside the arc-shaped pipeline A10;

[0027] The arc pipe A10 and the arc pipe B20 are adapted to each other, and flanges 40 are provided at both ends of the arc pipe A10. A limiting component 30 is provided on the flange 40. The limiting component 30 is connected to the arc pipe A10 to limit the arc pipe B20 in the inner cavity of the arc pipe A10.

[0028] In this embodiment, during use, the arc-shaped pipe B20 is extended into the inner cavity of the arc-shaped pipe A10 to form a double-layer structure, and then the limiting assembly 30 is installed on the flange 40, and the arc-shaped pipe B20 is limited by the limiting assembly 30;

[0029] Through the coordination between the arc pipe A10 and the arc pipe B20 set as above, a double-layer structure can be formed. When transporting liquid in the salt making process, the overall mechanical strength of the elbow can be effectively enhanced and its pressure resistance can be improved. The air layer between the double shells has a heat insulating effect, which can reduce thermal stress and thermal fatigue. At the same time, if the inner pipe leaks, the outer shell can play a secondary containment role to reduce the risk of environmental pollution. The arc pipe A10 and the arc pipe B20 are connected by a limit assembly 30, which can facilitate the subsequent maintenance and replacement of the arc pipe B20, thereby improving the overall practicality.

[0030] Specifically, the inner wall of the arc-shaped pipe A10 is provided with a guide groove 11, and the outer wall of the arc-shaped pipe B20 is provided with a guide strip 21;

[0031] The guide strip 21 is matched with the guide groove 11 .

[0032] In this embodiment, the cooperation between the guide strip 21 and the guide groove 11 can prevent the arc-shaped pipe B20 from rotating when it is installed into the arc-shaped pipe A10, thereby affecting the installation efficiency.

[0033] Specifically, the outer wall of the arc-shaped pipe B20 is in contact with the inner wall of the arc-shaped pipe A10.

[0034] Specifically, the limiting assembly 30 includes a connecting plate 32, and a plurality of connecting holes 31 are formed on the connecting plate 32;

[0035] The connection hole 31 is located to match the flange 40 .

[0036] In this embodiment, by matching the connecting hole 31 with the flange 40, when the flange 40 is later connected to other flanges 40, the connecting plate 32 can be clamped and the connecting plate 32 can be positioned, so that when the two sets of connecting plates 32 are respectively connected to the arc pipe A10, the arc pipe B20 is limited in the inner cavity of the arc pipe A10.

[0037] Specifically, the connecting plate 32 is provided with an extension pipe 33, and the connecting plate 32 is arranged in the middle of the extension pipe 33;

[0038] The extension pipe 33 extends into the inner cavity of the arc-shaped pipe B20.

[0039] In this embodiment, the arc-shaped pipe B20 can be effectively limited by extending the pipe 33 into the arc-shaped pipe B20.

[0040] Specifically, two groups of sealing grooves 311 are formed on the extension pipe 33 , and sealing strips are provided in the sealing grooves 311 .

[0041] In this embodiment, the sealing performance can be improved by providing a sealing strip in the sealing groove 311 .

[0042] Specifically, the sealing groove 311 is symmetrically arranged with the connecting plate 32 .

[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A primary brine high nitrate water recovery and transportation pipeline, Features: It comprises an arc-shaped pipeline A (10), wherein an arc-shaped pipeline B (20) is arranged inside the arc-shaped pipeline A (10); The arc-shaped pipe A (10) and the arc-shaped pipe B (20) are adapted to each other. Flanges (40) are provided at both ends of the arc-shaped pipe A (10). A limiting assembly (30) is provided on the flange (40). The limiting assembly (30) is connected to the arc-shaped pipe A (10) to limit the arc-shaped pipe B (20) in the inner cavity of the arc-shaped pipe A (10).

2. A primary brine high nitrate water recovery and delivery pipeline according to claim 1, Features: The inner wall of the arc-shaped pipe A (10) is provided with a guide groove (11), and the outer wall of the arc-shaped pipe B (20) is provided with a guide strip (21); The guide strip (21) is adapted to the guide groove (11).

3. A primary brine high nitrate water recovery and delivery pipeline according to claim 1, Features: The outer wall of the arc-shaped pipe B (20) fits the inner wall of the arc-shaped pipe A (10).

4. A primary brine high nitrate water recovery and delivery pipeline according to claim 1, Features: The limiting assembly (30) comprises a connecting plate (32), and a plurality of connecting holes (31) are formed on the connecting plate (32); The position of the connecting hole (31) matches the flange (40).

5. A primary brine high nitrate water recovery and transportation pipeline according to claim 4, Features: An extension pipe (33) is provided on the connection plate (32), and the connection plate (32) is arranged in the middle of the extension pipe (33); The extension pipe (33) extends into the inner cavity of the arc-shaped pipe B (20).

6. A primary brine high nitrate water recovery and transportation pipeline according to claim 5, Features: Two groups of sealing grooves (311) are provided on the extension pipe (33), and sealing strips are provided in the sealing grooves (311).

7. A primary brine high nitrate water recovery and transportation pipeline according to claim 6, Features: The sealing groove (311) is symmetrically arranged with the connecting plate (32).