Building drainage pipe mounting device
By designing lifting, clamping and rotating mechanisms in the building drainage pipe installation device, the problem of mismatch in the height and angle during the drainage pipe installation process in the prior art is solved, the applicability and flexibility of the installation device are improved, and construction is simplified process.
Patent Information
- Application Number
- CN202420995298.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2024-12-13
- Estimated Expiration
- 2034-05-09
AI Technical Summary
When connecting drain pipes of different heights and sizes, existing building drain pipe installation devices have low general availability, and different sizes of drain pipes are required to be used during construction, resulting in complex and inflexible installation process.
An installation device including a lifting mechanism, a clamping mechanism and a rotating mechanism is designed to change the height of the roof plate through the sliding track, the clamping mechanism adjusts the angle between the U-shaped frame and the platform, and the rotating mechanism realizes the angle of the platform to adapt to different Install the pipes of height and angle.
Pipe support and clamping for different installation heights and angles is realized, which improves the universality and flexibility of the installation device and simplifies the connection and fixing process of drain pipes.
Smart Images

Figure CN222163836U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of drainage pipe installation, and in particular relates to a building drainage pipe installation device. Background Art
[0002] It is usually necessary to fix some drainage pipes in buildings to discharge sewage or rainwater. During the installation of drainage pipes, when the drainage pipes need to be connected, due to the different opening heights of the drainage pipes, when some connecting branches are used to connect the drainage pipes that need to be connected, the connecting branches often have some inclination angles; at the same time, before the connection between the water pipes is fixed, technicians usually need to put bricks to fix the height of the drainage pipe; in addition, because drainage pipes of different sizes are needed during the construction process, the building drainage pipe installation devices under the existing technology generally have the problem of low versatility. Utility Model Content
[0003] The utility model aims at solving the problems in the prior art and provides a building drainage pipe installation device.
[0004] In order to achieve the above purpose, the technical solution adopted in this application is:
[0005] A building drainage pipe installation device comprises a lifting mechanism, a clamping mechanism and a rotating mechanism;
[0006] The lifting mechanism includes a bottom plate, a top plate, a scissor bracket, a first slider and a second slider; the scissor bracket includes an inner scissor bracket and an outer scissor bracket, and the inner scissor bracket and the outer scissor bracket are hinged in the middle; the scissor brackets are hinged in sequence from head to tail to form a scissor bracket group; the scissor bracket group includes at least two scissor brackets; the scissor bracket group is provided with at least two groups of the bottom plate side surface is provided with a first concave hole that is transparent from front to back, and the first concave hole is provided with a sliding track that matches the first slider; the top plate side surface is provided with a second concave hole that is transparent from front to back, and the second concave hole is provided with a sliding track that matches the second slider;
[0007] The clamping mechanism includes a platform, a rotating groove and a U-shaped frame; the platform is arranged above the top plate, and the platform and the top plate are arranged in contact; there are at least two rotating grooves; the rotating groove is fixedly connected to the top surface of the platform; the rotating groove is a cubic shell with the top surface and the back surface removed; the U-shaped frame is rotatably connected to the rotating groove.
[0008] Preferably, the rotating mechanism includes a rotating motor, a worm, a worm wheel and a rotating shaft built into the platform; the rotating shaft is arranged in the left and right directions, the rotating shaft is arranged at the rear position of the side of the platform and is fixedly connected to the platform; the end of the worm wheel rotating shaft close to the left side is fixedly connected to the inner side of the worm wheel; the output end of the rotating motor is fixedly connected to the worm, and the worm is meshingly connected to the worm wheel.
[0009] Preferably, a first locking nut is further disposed in the first concave hole, and the first locking nut is movably disposed in the first concave hole and disposed on the left and right sides of the first sliding block.
[0010] Preferably, a second locking nut is provided on the left and right directions of the rotating groove, and the second locking nut passes through the rotating groove and the left and right sides of the U-shaped frame.
[0011] Compared with the prior art, the advantages and positive effects of the utility model are:
[0012] The utility model discloses a building drainage pipe installation device, which comprises a bottom plate, a top plate, a scissor bracket, a first slider, a second slider, and a lifting mechanism provided on the bottom plate and the top plate and matching with the first slider and the second slider respectively. When the first sliders are brought close to each other, the height of the top plate can be changed, and finally the pipes with different installation heights can be supported.
[0013] By setting a clamping mechanism including a platform, a rotating groove and a U-shaped frame, the U-shaped frame is rotated in the rotating groove, and the angle between the U-shaped frame and the platform is changed, so as to clamp pipes of different sizes;
[0014] By setting up a rotating mechanism including a rotating motor, a worm, a worm gear and a rotating shaft built into the platform, the platform itself is rotated along the rotating shaft, so that the top surface of the platform fits the pipes set at different angles, thereby realizing the installation of pipes set at various angles. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0016] Figure 1 It is a front view of the structural schematic diagram of the utility model;
[0017] Figure 2 It is a left view of the structural schematic diagram of the utility model;
[0018] In the above figures, 1, bottom plate; 2, top plate; 3, scissor bracket; 301, inner scissor bracket; 302, outer scissor bracket; 4, first slider; 5, second slider; 6, scissor bracket group; 7, first recessed hole; 8, second recessed hole; 9, platform; 10, rotating groove; 11, U-shaped frame; 12, rotating motor; 13, worm; 14, worm wheel; 15, extension plate; 16, L-shaped bracket; 17, first locking nut; 18, second locking nut. DETAILED DESCRIPTION
[0019] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0020] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.
[0021] Embodiment 1, as Figure 1 , Figure 2 As shown, a building drainage pipe installation device of the present application includes a lifting mechanism, a clamping mechanism and a rotating mechanism;
[0022] The lifting mechanism includes a bottom plate 1, a top plate 2, a scissor bracket 3, a first slider 4 and a second slider 5; the scissor bracket 3 includes an inner scissor bracket 301 and an outer scissor bracket 302, and the inner scissor bracket 301 and the outer scissor bracket 302 are hinged in the middle; the scissor bracket 3 is hinged in sequence from head to tail to form a scissor bracket group 6; the scissor bracket group 6 includes at least two scissor brackets 3; the scissor bracket group 6 is provided with at least two groups; in this embodiment, two groups of scissor bracket groups 6 are provided, which are respectively arranged on the bottom plate 1 and the front and rear sides of the top plate 2, and the two groups of scissor bracket groups 6 are connected and fixed by a connecting rod to ensure that the positions are synchronized during movement; the side of the bottom plate 1 is provided with a first concave hole 7 that is transparent from front to back, and the first concave hole 7 is provided. The hole 7 is provided with a sliding track matched with the first slider 4; specifically, the first slider 4 passes through the first concave hole 7 and is slidably connected with the lower end of the scissor bracket 3 at the bottom of the scissor bracket group 6 and the sliding track arranged in the first concave hole 7; the side of the top plate 2 is provided with a second concave hole 8 that is transparent from front to back, and the second concave hole 8 is provided with a sliding track matched with the second slider 5; specifically, the second slider 5 passes through the second concave hole 8 and is slidably connected with the upper end of the scissor bracket 3 at the top of the scissor bracket group 6 and the sliding track arranged in the second concave hole 8; when in use, the first slider 4 is controlled to slide on the sliding track of the first concave hole 7 to realize the lifting and lowering of the top plate 2, and finally support pipes with different installation heights;
[0023] The clamping mechanism includes a platform 9, a rotating groove 10 and a U-shaped frame 11; the platform 9 is arranged above the top plate 2, and the platform 9 and the top plate 2 are arranged in contact; at least two rotating grooves 10 are provided; the rotating groove 10 is fixedly connected to the top surface of the platform 9; in this embodiment, there are two rotating grooves 10, which are respectively arranged at the left and right ends of the top surface of the platform 9; the rotating groove 10 is a cubic shell with the top surface and the back surface removed; the two straight sections of the U-shaped frame 11 are rotatably connected to the rotating groove 10 at one end away from the end connected to the arc section; when in use, the pipes of different sizes can be clamped by rotating the U-shaped frame 11;
[0024] The rotating mechanism includes a rotating motor 12, a worm 13, a worm wheel 14 and a rotating shaft built into the platform 9; the rotating shaft is arranged in the left and right directions, and the rotating shaft is arranged at the rear position of the side of the platform 9 and is fixedly connected to the platform 9; the end of the rotating shaft of the worm wheel 14 close to the left side is fixedly connected to the inner side of the worm wheel 14; the output end of the rotating motor 12 is fixedly connected to the worm 13, and the worm 13 is meshedly connected with the worm wheel 14; an extension plate 15 is arranged on the back of the top plate 2, and the rotating motor 12 is fixedly connected to the extension plate 15 through an L-shaped bracket 16; when in use, the rotating motor 12 is controlled to make the platform 9 rotate around the rotating shaft as the axis, so as to realize the change of the angle of the platform 9, so that the top surface of the platform is parallel to the pipes arranged at various angles, and finally the installation of pipes at various angles can be realized;
[0025] A first locking nut 17 is also provided in the first concave hole 7. The first locking nut 17 is movably provided in the first concave hole 7 and provided on the left and right sides of the first slider 4. The first locking nut 17 prevents the first slider 4 from sliding outward in the left and right directions, thereby fixing the lifting height position of the drainage pipe installation device.
[0026] The rotating groove 10 is provided with a second locking nut 18 in the left and right directions, and the second locking nut 18 passes through the rotating groove 10 and the left and right sides of the U-shaped frame 11; the setting of the second locking nut 18 can fix the rotation angle of the U-shaped frame 11 and make the U-shaped frame 11 firmly clamp pipes of different sizes.
[0027] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. A building drainage pipe installation device, characterized in that: It includes a lifting mechanism, a clamping mechanism and a rotating mechanism; The lifting mechanism comprises a bottom plate (1), a top plate (2), a scissor bracket (3), a first slider (4) and a second slider (5); the scissor bracket (3) comprises an inner scissor bracket (301) and an outer scissor bracket (302), and the inner scissor bracket (301) and the outer scissor bracket (302) are hinged in the middle; the scissor brackets (3) are hinged in sequence at the head and tail to form a scissor bracket group (6); the scissor bracket group (6) comprises at least two scissor brackets (3); the scissor bracket group (6) is provided with at least two groups of first concave holes (7) which are transparent from front to back are provided on the side surface of the bottom plate (1), and a sliding track which matches the first slider (4) is provided on the first concave hole (7); the top plate (2) is provided with a second concave hole (8) which is transparent from front to back is provided on the side surface, and a sliding track which matches the second slider (5) is provided on the second concave hole (8); The clamping mechanism comprises a platform (9), a rotating groove (10) and a U-shaped frame (11); the platform (9) is arranged above the top plate (2), and the platform (9) and the top plate (2) are arranged to be in contact with each other; at least two rotating grooves (10) are provided; the rotating grooves (10) are fixedly connected to the top surface of the platform (9); the rotating groove (10) is a cubic shell with the top surface and the back surface removed; and the U-shaped frame (11) is rotatably connected to the rotating groove (10).
2. A building drainage pipe installation device according to claim 1, characterized in that: The rotating mechanism comprises a rotating motor (12), a worm (13), a worm wheel (14), and a rotating shaft built into the platform (9); the rotating shaft is arranged in the left-right direction, and is arranged at a rear position on the side of the platform (9) and is fixedly connected to the platform (9); an end of the rotating shaft of the worm wheel (14) close to the left side is fixedly connected to the inner side of the worm wheel (14); the output end of the rotating motor (12) is fixedly connected to the worm (13), and the worm (13) is meshingly connected to the worm wheel (14).
3. A building drainage pipe installation device according to claim 1, characterized in that: A first locking nut (17) is also arranged in the first concave hole (7), and the first locking nut (17) is movably arranged in the first concave hole (7) and arranged on the left and right sides of the first sliding block (4).
4. A building drainage pipe installation device according to claim 1, characterized in that: A second locking nut (18) is arranged in the left and right directions of the rotation groove (10), and the second locking nut (18) passes through the rotation groove (10) and the left and right sides of the U-shaped frame (11).
