The frost line—also known as frost depth or freezing depth—is most commonly the depth to which the groundwater in soil is expected to freeze. The frost depth depends on the climatic conditions of an area, the heat transfer properties of the soil and adjacent materials, and on nearby heat sources. For example, snow cover and asphalt insulate the ground and homes can heat the ground (see also heat island). The line varies by latitude, it is deeper closer to the poles. Per Federal Highway Administration Publication Number FHWA-HRT-08-057, the maximum frost depth observed in the contiguous United States ranges from zero to about eight feet (2.4m). Below that depth, the temperature varies, but is always above 0 °C (32 °F).

Drainage system for tunnel in severe cold region

The invention relates to a drainage system for a tunnel in a severe cold region, comprising an inverting and initial supporting layer, wherein a center water pipe groove extending along the center line of each tunnel is excavated below the inverting and initial supporting layer, the center water pipe groove is internally provided with a center water pipe communicated with a lining drainage blind pipe by virtue of a transverse water pipe, and the center water pipe is completely deeply buried when the length of the tunnel is less than or equal to four kilometres; when the length of the tunnel is more than four kilometres, the center water pipe two kilometres near the inlet and the outlet of the tunnel is completely deeply buried, and the center water pipe paved on the rest segment of the tunnel is shallowly buried; and a drainage surface of the center water pipe which is deeply buried is arranged below a local frost line. The drainage system provided by the invention can adapt different weather conditions in various regions, the characteristic that temperature inside the tunnel is higher is fully utilized, the center water pipe which is 2000m long is deeply buried at the two ends of the tunnel respectively, and buried depth of the center water pipe can be reduced inside the tunnel, so that construction labour hour can be reduced and material and manpower cost can be further saved.
Owner:THE SECOND CONSTR OF CTCE GROUP

Pipeline laying method of long-distance coal conveying pipeline

The invention discloses a pipeline laying method of a long-distance coal conveying pipeline. The method comprises the following steps that A, a pipeline is imbedded below a frost line, and an earth covering depth from the top of the pipeline to a natural terrace is not less than 1.0 m; B, when the pipeline is laid in a gravel area, the over excavation of 0.2 m is required, a fine earth or fine sand cushion layer which is 0.2 m thick is first paved necessarily at the bottom of a trench, and then, the pipeline can be lifted to be put in the trench after the fine earth or fine sand cushion layer is flat, when the trench for the pipeline in the gravel area is backfilled, the trench is first backfilled to 0.3 m above the top of the pipeline necessarily by using fine earth (sand), and then, the trench can be backfilled by using original earth, the maximal grain size of the backfilling fine earth is not more than 10 mm, and gravel blocks as the backfilling earth are not expected to be more than 250 mm; and C, accident cutoff valves and valve chests are arranged at two ends of the pipeline traversing a large river and at proper positions along the pipeline, and the pipelines within at least 50 m outside outer edge lines of two ends of the pipelines traversing large and medium rivers and gullies are expected to adopt a way the same as a traversing section. Not only is the wear to a pipe wall in a construction process reduced, but also the maintenance cost of the pipeline in a process that the pipeline is used for conveying coal slurry is reduced.
Owner:WUHAN DESIGN & RES INST OF CHINA COALTECH & ENG GROUP

Solar subsurface intermittent-aeration constructed wetland system applied to small towns in cold region

The invention discloses a solar subsurface intermittent-aeration constructed wetland system applied to small towns in a cold region and relates to a wetland system applied to the small towns in a cold region. The solar subsurface intermittent-aeration constructed wetland system is mainly used for solving the technical problems that an existing constructed wetland system for the small towns in the cold region cannot be operated throughout the year, is high in operation cost, complex in management, low in dissolved oxygen in water and not good in treatment effect. The solar subsurface intermittent-aeration constructed wetland system consists of a slot body, a water inlet tube, a water outlet tube, a water distributing tube, a water collecting tube, an aeration tube, a solar panel power supply device and a water baffle, wherein the water baffle is arranged below a frost line and used for dividing the slot body into upper and lower layers; the perforated aeration tube is arranged on the bottom of the lower layer of the slot body; the perforated aeration tube is communicated with an air outlet of the air pump; and a power supply input end of the air pump is connected with the solar panel power supply device. The solar subsurface intermittent-aeration constructed wetland system can be operated in cold small towns throughout the year, is low in operation cost and simple to operate, and the water quality of operating effluent in a freeze-up period meets the national sewage emission standards. The solar subsurface intermittent-aeration constructed wetland system disclosed by the invention is applied to the sewage treatment field.
Owner:HARBIN INST OF TECH

Cooling device for film blowing equipment

ActiveCN108422650ATight press closeAchieve coolingAperture arrayFrost line
The invention discloses a cooling device for film blowing equipment. An air supply inlet facing upwards is arranged right in the center of an air supply base, an annular air flow is supplied to an inner cavity of the air supply base through a flow splitting mechanism, an air supply pipe surrounds the air supply base evenly and is connected with the inner cavity of the air supply base and an annular main air duct, the annular main air duct diverts to the inner side to form a first-level annular air duct and a second-level annular air duct, outlets of the first-level annular air duct and the second-level annular air duct both face upwards and mutually come together, an inlet of the first-level annular air duct is peripherally arranged on an air discharge regulating ring in the form of an inlet aperture array and is mutually communicated with the second-level annular air duct, the air discharge regulating ring only regulates the space of the second-level annular air duct and regulates thevelocity of both the first-level annular air duct and the second-level annular air duct, the air discharge regulating ring is provided with a closing structure for closing the second-level annular air duct, and the annular main air duct directly supplies air to the first-level annular air duct in the closing state. The device improves the cooling stability of a film blank, particularly a primarily extruded viscous-state film blank, and meanwhile, the forming effect of the film blank near to the part of the frost line is improved.
Owner:汕头市众鑫隆机械制造有限公司

Method for treating subgrade of highway in frozen soil region

The invention discloses a method for treating a subgrade of a highway in a frozen soil region. The method comprises the following steps: a, thawing a frozen soil subgrade in a frost line in advance; b, excavating all thawed soil; c, laying a layer of coarse-grained soil and a reversed filter layer at the bottom of an excavation layer, and laying lime waterproof layers and gravel expansion guide layers on two sides; d, filling activated magnesia carbonized and cured sludge soil layer by layer and performing tamping reinforcement; e, compacting filled embankment filling soil and setting a coarse-grained soil layer containing an XPS insulation board below a pavement structure; f, setting waterproof protecting feet on two sides of an embankment respectively. Subgrade pre-thawing, filling treatment and soft soil carbonization and curing technologies for the frozen soil region are fully combined, the frozen soil subgrade is effectively reinforced, the engineering problems of refreezing and frost heaving of subgrade soil are well solved, non-uniform settling of the subgrade is further reduced, and the problem of secondary damage of the highway in the cold region is reduced greatly. The method has the advantages of being economic, environmentally friendly, safe, efficient, high in controllability, easy to operate and the like.
Owner:SOUTHEAST UNIV

A drainage system for tunnels in severe cold regions

The invention relates to a drainage system for a tunnel in a severe cold region, comprising an inverting and initial supporting layer, wherein a center water pipe groove extending along the center line of each tunnel is excavated below the inverting and initial supporting layer, the center water pipe groove is internally provided with a center water pipe communicated with a lining drainage blind pipe by virtue of a transverse water pipe, and the center water pipe is completely deeply buried when the length of the tunnel is less than or equal to four kilometres; when the length of the tunnel is more than four kilometres, the center water pipe two kilometres near the inlet and the outlet of the tunnel is completely deeply buried, and the center water pipe paved on the rest segment of the tunnel is shallowly buried; and a drainage surface of the center water pipe which is deeply buried is arranged below a local frost line. The drainage system provided by the invention can adapt different weather conditions in various regions, the characteristic that temperature inside the tunnel is higher is fully utilized, the center water pipe which is 2000m long is deeply buried at the two ends of the tunnel respectively, and buried depth of the center water pipe can be reduced inside the tunnel, so that construction labour hour can be reduced and material and manpower cost can be further saved.
Owner:THE SECOND CONSTR OF CTCE GROUP

A flow-limiting device for the frosting pipeline of a refrigerator

The invention provides a flow limiting device for a frost flushing pipeline of a refrigerator, which belongs to the technical field of safety equipment. The invention solves the problems that the existing refrigerating machine frosting pipeline is not easy to be frosted and has poor safety. The flow limiting device of the frosting pipeline of this freezer, the frosting pipeline includes the frosting pipe, the flow limiting device includes flange 1, flange 2, barrel section 1, barrel section 2 and spring, flange 1 is connected to the frosting The end of the pipe, the bottom end of the barrel section 2 is fixedly connected to the inner wall of the flange hole of the flange 2, and the lower wall of the barrel section 2 has several through holes distributed along the circumferential direction of the barrel section 2, and the barrel section 2 One is built into the frosting pipe, and the lower part of cylinder section 1 slides and sleeves on cylinder section 2. When cylinder section 1 moves down, cylinder section 1 can cover the through hole 1, and the top of cylinder section 1 is fixedly connected with The top cover has a through hole 2 on the top cover, the top of the spring is against the bottom surface of the top cover, and the bottom of the spring is against the top of the cylinder section 2. It can self-adaptively adjust the flow of hot ammonia used for frosting, and has good safety.
Owner:台州中奥检测科技有限公司

A treatment method for expressway subgrade in permafrost regions

The invention discloses a method for treating a subgrade of a highway in a frozen soil region. The method comprises the following steps: a, thawing a frozen soil subgrade in a frost line in advance; b, excavating all thawed soil; c, laying a layer of coarse-grained soil and a reversed filter layer at the bottom of an excavation layer, and laying lime waterproof layers and gravel expansion guide layers on two sides; d, filling activated magnesia carbonized and cured sludge soil layer by layer and performing tamping reinforcement; e, compacting filled embankment filling soil and setting a coarse-grained soil layer containing an XPS insulation board below a pavement structure; f, setting waterproof protecting feet on two sides of an embankment respectively. Subgrade pre-thawing, filling treatment and soft soil carbonization and curing technologies for the frozen soil region are fully combined, the frozen soil subgrade is effectively reinforced, the engineering problems of refreezing and frost heaving of subgrade soil are well solved, non-uniform settling of the subgrade is further reduced, and the problem of secondary damage of the highway in the cold region is reduced greatly. The method has the advantages of being economic, environmentally friendly, safe, efficient, high in controllability, easy to operate and the like.
Owner:SOUTHEAST UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products