Fore-reservoir system driven by natural energy in lake outlet regions
A front-end storage and natural technology, applied in the field of lake eutrophication control system, can solve problems such as low efficiency, inability to drive the system operation, difficult power supply, etc., and achieve the effect of improving treatment efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] In Hukou District, a certain place in southern Jiangsu, the construction project of the front-end storage system in Hukou District driven by wind energy is carried out. The lake discharged a large amount of nitrogen and phosphorus nutrients through the lake mouth area, resulting in the deterioration of the lake's water quality. The windmill is used to lift water in this pre-storage project, and the design hydraulic load is 0.20 m 3 / m 2 / d, the water surface area of the front reservoir is designed to be 1250m 2 . The volume of this front warehouse project is 1520m 3 , water inflow is 250m 3 / d, the hydraulic retention time is 6d. The project adopts a brick-concrete structure, and each area is separated from each other and communicated with PVC pipes.
[0026] (1) Water diversion regulation and storage area: the area is 20m×5m=100m 2 , the water flow direction is parallel to the 20m side direction, accounting for 8% of the total area of the front reservoir, an...
Embodiment 2
[0034] Carry out the natural energy-driven Hukou District pre-storage project in Hukou District, somewhere in southern Jiangsu. A large amount of nutrients such as nitrogen and phosphorus entering the lake in Hukou District is one of the main reasons for the eutrophication of the lake. The windmill is used to lift water in this pre-storage project, and the design hydraulic load is 0.40 m 3 / m 2 / d, the water surface area of the front reservoir is 10000m 2 , volume is 13750m 3 , water inflow is 4000m 3 / d, the hydraulic retention time is 3.4d. The main project of the pre-reservoir is an earth structure with an approximately rectangular shape, and the various areas are separated by earth cofferdams. Except for the water diversion and storage area, fractures are set on the cofferdams to communicate with each purification area.
[0035] (1) Water diversion regulation and storage area: area 50×20=1000m 2 , the water flow direction is parallel to the 50m side direction, acco...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com