An online risk management system for building construction quality and safety
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A technology of construction and risk management, applied in the field of risk management of construction projects, can solve the problems of many uncertain factors of risk, diverse risks and randomness, etc., and achieve the effect of ensuring smooth implementation and powerful data analysis function.
Active Publication Date: 2016-06-29
SHANGHAI JIANKE ENG CONSULTING
View PDF3 Cites 1 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
However, because large-scale construction projects are restricted by various conditions, there are many risk uncertainties, and the risks are diverse and random. Once a quality safety accident occurs, the impact on the environment and society will be huge. The quality and safety management mode in the construction stage of large-scale construction projects in line with international standards, forming an effective risk management system in the field of engineering construction
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0049] The large-scale building quality and safety online risk management system of the present invention will be described below in conjunction with the accompanying drawings.
[0050] The functional module composition diagram of the present invention is as follows figure 1 As shown, a large-scale construction quality and safety online risk management system includes two subsystems, the comprehensive management subsystem and the single project management subsystem. The comprehensive management subsystem includes the project risk status module, risk monitoring and early warning module, work reminder module, instruction Issue module, risk drill module; single project management subsystem includes engineering information module, risk identification module, risk assessment module, risk tracking module, early warning and emergency module, document management module, instruction reply module, video monitoring module. The integrated management system can enter the single project man...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention provides an online risk management system for building construction quality and safety, which relates to the technical field of risk management of construction engineering, and includes a comprehensive management subsystem and a single project management subsystem. The comprehensive management subsystem includes project risk status, risk monitoring and early warning, work Five functional modules, including reminder, instruction issuing, and emergency drill, are used to browse the relevant information of all projects undertaken by the company, send instructions to the project department, and check the daily work of the project department; the single project management subsystem includes engineering information, risk identification, risk Nine functional modules, including assessment, risk tracking, early warning and emergency response, document management, work reminder, command reply, and video surveillance, are used for risk identification, assessment, tracking, early warning and emergency response through project overview information, and remote monitoring of project sites. This system integrates online risk assessment system, remote monitoring system and risk management information platform to realize real-time and whole-process management of risks in large-scale construction projects.
Description
technical field [0001] The invention belongs to the technical field of risk management of construction engineering, and in particular relates to an online risk management system for construction quality and safety. Background technique [0002] With the vigorous development of large-scale construction projects in our country, engineering construction presents the characteristics of diversified investment subjects, complex technical processes, new building materials, independent enterprises, and large-scale construction projects. For a large-scale construction project, quality safety is an important basis to ensure the smooth progress of construction and safe use. Once a quality accident occurs, it will affect the smooth progress of the construction at the slightest, and leave hidden dangers in the project or shorten the service life of the building, or even Buildings collapse, causing casualties and huge economic losses. Therefore, quality and safety risks and safety issues ...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.