Method and system for calculating green time of each phase of signalized intersection

A technology of green light time and calculation method, applied in the direction of controlling traffic signals, etc., can solve problems such as defects and unreasonable time allocation, and achieve the effect of improving utilization rate, simple and convenient calculation operation process, and simple system structure.

Active Publication Date: 2013-02-06
ZHEJIANG SUPCON INFORMATION TECH CO LTD
View PDF3 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention mainly solves the problem of unreasonable and defective time allocation of the signal lamp time allocation method for sudden or congested traffic situations in the prior art, and provides a signal that can be better adjusted for gradual and sudden changes in traffic conditions. Calculation method of green light time of each phase at intersection

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for calculating green time of each phase of signalized intersection
  • Method and system for calculating green time of each phase of signalized intersection
  • Method and system for calculating green time of each phase of signalized intersection

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0028] In this embodiment, a method and system for calculating the green light time of each phase at a signalized intersection, such as figure 2 As shown, the system includes a traffic signal light, a number of detection units for detecting the number of vehicles passing during the green light time of the phase 1, a timing unit 2 and a processing unit 3 that record the green light duration of each phase. The detection units are respectively connected to the processing units. The detection unit is a coil detector, which is respectively installed at each phase of the road junction, generally behind the stop line at the road junction, so that the number of vehicles passing through a green light period can be counted. The timing unit 2 is set on the signal light, one end of the timing unit is connected to the signal light, and the other end is connected to the processing unit. The timing unit records the time of the green light and sends the data to the processing unit. The process...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method and a system for calculating green time of each phase of a signalized intersection. The method comprises the following steps of: setting a service traffic objective function of the signalized intersection; setting the maximum green time and the minimum green time of each phase green lamp in a period, wherein the green time of each phase is shorter than or equal to the maximum green time and is longer than or equal to the minimum green time and the sum of the green time of all the phases is cycle time; setting a proportionality coefficient to ensure a ratio of the green time of any two phases in the current period less than or equal to the product of the proportionality coefficient and a ratio of flow rates of the corresponding phases in the previous period; and under the constraint conditions, by traversing the proportionality coefficient, calculating the green time of each phase of the signalized intersection so as to ensure the intersection to have the maximum service traffic. According to the method, the ballast and gradient traffic flow can be well processed, the mutative traffic flow can be rapidly responded, the largest number of vehicles can pass through the intersection and the service level of the signalized intersection is improved.

Description

Technical field [0001] The invention relates to the field of urban traffic signal control, in particular to a method and system for calculating the green light time of each phase of a signalized intersection that can make better adjustments corresponding to gradual and sudden traffic conditions. Background technique [0002] In recent years, with the development of society and economy, the acceleration of urbanization and the rapid increase of motor vehicles, urban traffic problems have become increasingly serious, and urban traffic pressure has increased, especially at signalized intersections. Therefore, under the selected period of signalized intersections, the green light time of each phase can be allocated more reasonably to maximize the service flow of the intersection, and adaptive adjustments should be made as much as possible to reduce idle time and improve the use of green light time Improve the traffic service level of road intersections, so that motor vehicles can pas...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G08G1/07
Inventor 杨永耀吴汉沈国江章如峰汤灏杨成邢水泉
Owner ZHEJIANG SUPCON INFORMATION TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products