Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Capital construction field operation management system

A field operation and management system technology, applied in the field of management systems, can solve problems such as inadequate civilized management of construction sites, impact on project quality, economic losses, etc., to facilitate management, improve communication channels, and improve efficiency.

Inactive Publication Date: 2013-12-04
GUANGDONG POWER GRID CO LTD INFORMATION CENT +1
View PDF5 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The progress of the project is an important link in the electric power infrastructure. The delay of the progress will not only affect the quality of the project, but also cause economic losses.
[0008] Construction site civilization management is not in place
Civilized construction is an extension of safe production, which embodies on-site civilized construction procedures, means of strengthening management, and safety work before construction, including personal protection, safety facilities, safe use of electricity, appearance inspection and display of tools, and operation of construction machinery The condition, site materials are placed neatly, and the positions of various safety signs must be strictly in place. In addition, the construction team must read the construction work ticket before the operation, and do "three handovers" and "three checks" to ensure that during the construction process It is implemented in accordance with the requirements of civilized construction, but in the actual implementation process, it is often impossible to meet the requirements of these contents

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Capital construction field operation management system
  • Capital construction field operation management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0022] Such as figure 1 As shown, infrastructure site operation management system 1 includes:

[0023] An electronic label 2, the electronic label 2 records the operation information of the operator.

[0024] The operation information includes the operator's name, location, and time of entry and exit.

[0025] It should be noted that the electronic tag 2 is set in the helmet to facilitate tracking of the workers, and the helmets correspond to the workers one by one.

[0026] The monitoring center 3 receives the GPS information of the electronic tag 2 .

[0027] The scanning device 4 reads the job information recorded on the electronic label 2 .

[0028] The contractor human resource management platform 5 receives and stores the job information read by the scan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a capital construction field operation management system which comprises an electronic tag, a monitoring center, a scanning device and a contractor human resource management platform. The electronic tag records operation information of an operator, the operation information includes the name, the place and in-out time of the operator, the monitoring center receives GPS (global positioning system) information of the electronic tag, the scanning device reads the operation information recorded by the electronic tag, the contractor human resource management platform receives and stores the operation information read by the scanning device and associates personal information of the operator according to the operation information, and the personal information includes a blood type, a family member contact and a contact way. By the aid of the capital construction field operation management system, related information of a capital construction field is managed according to NFC (near field communication) technology, LBS (location based service) technology and socialized technology, the electronic tag is connected with the scanning device by the aid of the NFC technology, a client rapidly and accurately counts position information of the operator by the aid of the LBS technology, and close contact between users is greatly facilitated by the aid of the socialized technology.

Description

technical field [0001] The invention relates to a management system, in particular to a management system for on-site operation of infrastructure. Background technique [0002] The difficulties of traditional infrastructure construction site operations mainly include the following aspects. [0003] Electric power construction is a high-risk industry with many unsafe factors. The electric power construction site is a production site with multiple types of work, multi-level three-dimensional intersection operations, many temporary facilities, and large changes in the working surface, and there are many unsafe factors. [0004] On-site quality control is difficult. Contractors, material quality, production equipment quality management, lack of responsibility mechanism or lack of monitoring, some management personnel have a weak sense of responsibility, do not know management responsibilities, have weak legal awareness, and the implementation of management methods is not in pl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06
Inventor 张若曦李隽董召杰袁霞
Owner GUANGDONG POWER GRID CO LTD INFORMATION CENT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products