Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A green building and evaluation system technology, applied in the direction of instruments, data processing applications, calculations, etc., can solve problems such as heavy coordination workload, inability to reflect, and difficulty in inter-professional cooperation, and achieve the effect of simplifying the assignment
Inactive Publication Date: 2014-11-12
SUZHOU BAISIDE CONSTR TECH CO LTD
View PDF4 Cites 3 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0006] 2. The organic process of green building implementation is artificially divided into several stages that are not affiliated with each other, resulting in difficulties in coordination between stages;
[0007] The artificial division in the green building evaluation process makes the coordination workload very large, and once the coordination and communication are not in place, it may cause the planning and design intention to be distorted in the construction and operation management and cannot be reflected, or cause difficulties in inter-professional cooperation
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0027] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0028] Such as figure 1 As shown, a green building evaluation system of the present invention includes an input layer 1, which is used for the assignment of input index parameters;
[0029] Calculation layer 2, which is used to analyze and calculate the building indicators of green buildings;
[0030] Output layer 3, which is used to obtain various reports that need to be submitted during the green building implementation process and realize the transfer and update of index values between modules;
[0031] The input layer 1 is connected to the calculation layer 2 through the network, and the calculation layer 2 and the output layer 3 are connected through the network.
[0032] The input layer 1 includes an indicator input module 11 .
[0033] The calculation layer 2 includes a green building evaluation system 21, which is used to receive i...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
PUM
Login to view more
Abstract
The invention discloses a green building evaluation system which comprises an input layer, a computing layer and an output layer. The input layer is used for inputting assignments of index parameters, the computing layer is used for analyzing and computing building indexes of a green building, and the output layer is used for obtaining various reports which need to be submitted in the green building construction process and achieving transmitting and updating of index numbers between modules. The input layer and the output layer are connected through a network, and the computing layer and the output layer are connected through the network. The green building evaluation system has the advantages that a common interface is provided, assignment, computing and parameter adjusting of the index parameters of the green building evaluation system are simplified, and coordination of all stages, all indexes, all main bodies and all professions in the green building construction process is achieved.
Description
technical field [0001] The invention relates to a green building evaluation system. Background technique [0002] At present, the evaluation of green buildings is artificially divided into many links, such as: according to the main body, it involves five types of implementation subjects, such as owners, design units, consulting units, construction units, and green energy-saving product suppliers; Structure, water supply and drainage, HVAC, electrical, landscape, decoration, weak electricity and other eight majors; according to the time scale, the whole life cycle of the project that runs through planning, design, construction, operation, maintenance and demolition is divided. [0003] Since green building evaluation involves a wide range of areas, many disciplines, and a long period of time, there is a serious fragmentation in the conventional evaluation, see Attached Table 1 for details. [0004] Conventional evaluation methods have the following problems: [0005] 1. It ...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.