Plant grid used for improving graff water quality
A plant grid and river channel technology, applied in the field of plant grid, can solve the problems of difficult to grow plants, lack of medium for microorganisms to attach and grow, and loss of self-purification ability of soil, so as to achieve the effect of saving investment and good growth.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Basic information: The inland river runoff in a certain city is mainly rainwater runoff, sewage pipe network running, dripping and leaking, and drainage of residents along the river. duckweed, the inland river width is 10m, the water depth is 40cm on weekdays, and the water depth is 3m in flood season, and the hardening time of the inland river bed and embankment is 3 years.
[0024] refer to figure 1 As shown, it is composed of the outer stable wall (including the water inlet wall 2, the drainage wall 3 and the connecting wall 5) and the filling area 4. The outer stable wall adopts a brick-concrete structure, and the description is as follows:
[0025] A grid is installed 50m upstream of the processing unit. The grid is welded with angle iron. The spacing between the grid bars is 3cm and the height is 50cm. Sanitation workers clean the grid once a week. set up figure 1 There are 4 right-angled trapezoidal processing units in 2 pairs, where the height a=5m, the length...
Embodiment 2
[0028] Basic information: A rural drainage channel is mainly used for agricultural and residential drainage. The water body is black and smelly. The surface of the water body contains a large amount of solid waste. In summer, black film can be seen. The channel width is 3m, the channel depth is 1m, and the water depth is 30cm on weekdays , the flow rate does not exceed 1m / day, the canal is full during the flood season, and the hardening time is 5 years. It is a famous stinky ditch in the village.
[0029] refer to figure 2 As shown, the outer stable wall (including the water inlet wall 2 and the drainage wall 3) and the filling area 4 are composed of a brick-concrete structure. described as follows:
[0030] A grid is installed 10m upstream of the processing unit. The grid is welded with angle iron. The spacing between the grid bars is 4cm and the height is 50cm. The village committee organizes workers to clean the grid once a week. set up figure 2 There are 3 rectangular...
PUM
Property | Measurement | Unit |
---|---|---|
height | aaaaa | aaaaa |
height | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com