Engineering machinery management method
A technology of construction machinery and management methods, applied in the direction of electrical program control, sequence/logic controller program control, etc., can solve the problems of lack of construction machinery management methods, and achieve the effect of improving maintenance effects and increasing utilization rates
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0020] The construction machinery management method includes two aspects, one is the maintenance of construction machinery files, and the other is the information interaction between scheduling and auxiliary equipment. The specific functions are as follows:
[0021] (1) Construction machinery management
[0022] Maintenance of basic information of auxiliary equipment, including adding, deleting, modifying, and querying.
[0023] (2) Construction Machinery Production Scheduling
[0024] This function allows the dispatcher to change the production or maintenance tasks of construction machinery according to the requirements of the production plan or maintenance plan. Construction machinery can be dispatched and tasked to dumps, crushing stations, shovels, workshops, roads—anywhere defined in the mining database. When the scheduling takes effect, the system transmits the scheduling information through the dedicated network and displays it on the terminal.
[0025] 1) Assign equ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com