Resource scheduling method and device
A resource scheduling and resource technology, applied in the field of wireless communication, can solve the problems of adjustment, the PA bias voltage adjustment range is small, and the PA bias voltage cannot be performed, so as to reduce power consumption and improve efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2015-06-24
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The present invention relates to wireless communication technology, in particular to a resource scheduling method and device. Background technique
[0002] With the rapid development of mobile communication, Long Term Evolution (LTE, Long Term Evolution) mobile communication technology has attracted more and more attention from the communication industry. The downlink structure of the LTE base station system is as follows: figure 1 As shown, the baseband subsystem 101 performs processing such as scheduling and modulation on the data from the core network; the intermediate frequency processor 102 performs filtering, frequency up-conversion and other processing on the digital signal received from the baseband subsystem 101; digital predistortion (DPD, Digital Predistortion ) processor 104 performs peak clipping and digital pre-distortion processing on the digital signal received after frequency conversion by the intermediate frequency processor 102; dig...
Examples
Embodiment Construction
[0034] In the embodiment of the present invention, the base station predicts the maximum upper limit of resources that can be used for the next scheduling according to the number of historical scheduling resources, and performs resource allocation according to the current service situation of the base station and the maximum upper limit of the resources during the next scheduling.
[0035] The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
[0036] Embodiments of the present invention implement a resource scheduling method, such as figure 2 As shown, the method includes the following steps:
[0037] Step 201: the base station predicts the maximum upper limit of resources that can be used for next scheduling according to the number of historical scheduling resources;
[0038] Specifically, the base station obtains the length of the time window and the prediction method input by the user, and pr...