Embodiment 1
[0050] A work recording and reconciliation method provided by the embodiment of the present invention is applied to the management platform, such as figure 1 shown, including:
[0051] Step S102, obtaining the first work record information, which is the project information of the target project recorded by the worker, wherein the project information includes labor service information and labor-management information.
[0052] Specifically, the labor service information includes at least one of the following: the total amount of work that the worker needs to complete, the amount of work that the worker has completed, and the amount of work that the worker has not completed; the labor information includes at least one of the following: total salary, debit, unsettled salary. Engineering quantity refers to the parameters calculated based on engineering tasks, for example, a 10-meter-long beam; time length refers to the parameters calculated based on the time required to complete ...
Embodiment 2
[0098] A device for recording and reconciling accounts provided by an embodiment of the present invention, such as Figure 4 shown, including:
[0099] The first obtaining module 1 is used to obtain the first work record information, the first work record information is the project information of the target project recorded by the worker, wherein the project information includes the project quantity and / or the duration;
[0100] The second obtaining module 2 is used to obtain the second work record information, and the second work record information is the project information of the workers on the target project recorded by the team management personnel of the target project;
[0101] The first determination module 3 is configured to compare the first work record information with the second work record information, so as to determine the workload of the workers on the target project.
[0102] In the embodiment of the present invention, the first acquisition module 1 acquires ...