Method for calculating rail elevation adjustment amount of settlement over-limit section of high-speed railway bridge
A calculation method and adjustment technology, applied to bridges, tracks, laying tracks, etc., can solve problems such as low work efficiency, unrecoverable and limited bridge sections, and achieve the effect of improving ride comfort
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] The calculation method for the track elevation adjustment amount of the high-speed railway bridge settlement overrun area of the present invention will be further described in conjunction with the accompanying drawings. figure 1 It is a flow chart of the calculation method for the track elevation adjustment amount of the high-speed railway bridge settlement overrun section of the present invention, and the method comprises the following steps:
[0044] S1. Obtain engineering information of subsidence overrun section; S2. Set track elevation adjustment effect requirements; S3. Set adjustable limit value of repair measures; S4. Construct track adjustment effect objective function; S5. Search and calculate optimal adjustment amount Program.
[0045] The specific implementation is as follows:
[0046] S1. Obtain engineering information of subsidence overrun section:
[0047] First, see figure 2 The schematic diagram of the settlement overrun section of the high-speed ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com