A kind of mining method of segmental grouting curtain water conservation in aquifer
A grouting curtain, water-retaining mining technology, used in surface mining, earth-moving drilling, underground mining and other directions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0071] as attached figure 1 and 2 As shown, the advancing length of the working face of a certain mine is n=1800m, the length of the working face is m=150m, and the thickness of the mineable coal seam is M=10m. Such as figure 2 As shown, the distance between the roof of the working face and the aquifer is H=160m, the thickness of the aquifer is h=10m, and the water pressure q=1MPa. The width of the protection coal pillar is W=60m, and the rock formation movement angle δ=70°.
[0072] Step 1: Arrange the grouting curtain 11w of the first working face of the first mining area on the side of the aquifer 4 away from the edge of the mining area. The grouting material is cement-water glass slurry, the water-cement ratio of cement is 0.8:1, and the water The Baume degree of the glass is 40°Bé, water glass: cement = 1:1, and the shear strength of the curtain is τ = 0.6MPa. curtain length The 1t distance from the stop production line of the first mining area is L≥Hcotδ=61.9m, an...
Embodiment 2
[0077] as attached figure 1 and 3 As shown, the advancing length of the working face of a certain mine is n=900m, the length of the working face is m=150m, and the thickness of the mineable coal seam is M=1m. Such as figure 1 As shown, the distance between the roof of the working face and the aquifer is H=100m, the thickness of the aquifer is h=5m, and the water pressure q=0.5MPa. The width of the coal pillar is W=60m, and the rock formation movement angle δ=70°.
[0078] Step 1: Arrange the grouting curtain 11w of the first working face of the first mining area on the side of the aquifer 4 away from the edge of the mining area. The grouting material is cement-water glass slurry, the water-cement ratio of cement is 0.8:1, and the water The Baume degree of the glass is 40°Bé, water glass: cement = 1:1, and the shear strength of the curtain is τ = 0.6MPa. Grouting Curtain Length The 1t distance from the stop production line of the first mining area is L≥Hcotδ=36.4m, and th...
Embodiment 3
[0084] as attached figure 1 and 4 As shown, the advancing length of the working face of a certain mine is n=1350m, the length of the working face is m=200m, and the thickness of the mineable coal seam is M=6m. Such as figure 1 As shown, the distance between the roof of the working face and the aquifer is H=30m, the thickness of the aquifer is h=9m, and the water pressure q=0.1MPa. The width of the protection coal pillar is W=60m, and the rock formation movement angle δ=70°.
[0085] Step 1: Arrange the grouting curtain 11w of the first working face of the first mining area on the side of the aquifer 4 away from the edge of the mining area. The grouting material is cement-water glass slurry, the water-cement ratio of cement is 0.8:1, and the water The Baume degree of the glass is 40°Bé, water glass: cement = 1:1, and the shear strength of the curtain is τ = 0.6MPa. Grouting Curtain Length The 1t distance from the stop production line of the first mining area is L≥Hcotδ=10...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com