Bridge crack repairing method
A crack repair and bridge technology, applied in the field of bridge crack repair, can solve problems such as unpleasant construction efficiency and long glue consolidation time, and achieve the effect of improving airtight performance and rapid repair
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] Such as figure 1As shown, it is a kind of grouting equipment disclosed by the present invention, which includes a grout storage tank 1 with openings at both ends and a grouting mechanism 2 arranged in the grout storage tank 1. One of the openings of the grout barrel 1 is the grouting port 4, the other opening is the operating port 5, and one end of the grouting port 4 is provided with a sealing assembly 6 (refer to image 3 ).
[0054] Such as figure 1 As shown, the mobile frame 3 includes a rectangular bottom frame 7 and a pulley 8 rotatably connected to each of the four corners of the lower end surface of the bottom frame 7 . The mobile frame 3 also includes a rectangular sliding plate 9 fixed to the middle upper end surface of the longer two sides of the bottom frame 7, the sliding plate 9 is perpendicular to the bottom frame 7, and the middle part of the sliding plate 9 is provided with a sliding groove 10, The sliding groove 10 extends from the lower end surface...
Embodiment 2
[0067] A bridge crack repair method, comprising the following construction steps:
[0068] Step 1: measurement and recording of cracks, so as to screen and record cracks that can be surrounded by the sealing component 6;
[0069] Step 2: Target crack surface cleaning treatment:
[0070] 1) Use a wire brush to remove foreign matter around the crack;
[0071] 2) Use a hair dryer or organic solvent to remove the dust from the cracks and make them fully dry;
[0072] Step 3: Use grouting equipment to inject grout into the crack:
[0073] 1) Push the slurry storage tank 1 to the target crack, so that the sealing assembly 6 corresponds to the target crack;
[0074] 2) Open the closure assembly 23;
[0075] 3) Personnel stand on the bearing plate 11 at the same time, thereby applying a load to the two bearing plates 11, so that the sealing assembly 6 is in close contact with the bridge deck, and then through the deformation of the sealing assembly 6, a seal is formed between the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com