High-applicability working platform and manufacturing process thereof
A work platform and applicability technology, applied in manufacturing tools, tool storage devices, workshop equipment, etc., can solve the problems of consuming large space and interfering with the work of operators, so as to reduce the occupancy, reduce the space occupancy, and expand the accumulation. The effect of an item's ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Embodiment 1: refer to figure 2 , is a high applicability working platform disclosed by the present invention, including a bottom frame 2, and the bottom frame 2 in this embodiment is a rectangular frame composed of hollow square tubes connected end to end. The lower surface of the bottom frame 2 is fixed with several well-shaped reinforcing ribs 21 by welding, and the four corners of the bottom frame 2 bottom surface are also connected with swivel casters 22 by bolts. A fixed pedal 3 is arranged on the upper surface of the bottom frame 2 , and the fixed pedal 3 is directly placed on the bottom frame 2 .
[0044] refer to figure 2 with image 3 , The upper surface of the bottom frame 2 is provided with a number of support rods 4 , and each support rod 4 includes a support fixed tube 41 and a support telescopic tube 42 . One end of each supporting and fixing pipe 41 is all fixed on the upper surface of the bottom frame 2 by welding, two of which are located at the t...
Embodiment 2
[0049] Embodiment 2: a kind of processing technology of the working platform of high applicability, comprises the steps:
[0050] S10, cutting, cutting the bottom frame 2, the supporting fixed pipe 41, the supporting telescopic pipe 42, the overturned fixed pipe 101, the overturned telescopic pipe 102, the reinforcing rib 21, each fixed platform 6 and the fixed pedal 3 according to the design size.
[0051] S20, welding, forming the bottom frame 2 and the flip fixing frame 82 by welding, then welding the reinforcing ribs 21 to the bottom of the bottom frame 2, and then welding several support fixing pipes 41 to the upper surface of the bottom frame 2; The pipe 42 is welded on the fixed platform 6; the hanging plate 7 is welded between the supporting fixed pipe 41 and the supporting telescopic pipe 42 respectively.
[0052] S30, punching holes, drilling holes for the installation of the overturning fixed frame 82 on the bottom frame 2, punching holes connected to the bottom fra...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


