A technology for cutting wells and pulling grooves, which is applied in earth-moving drilling, underground mining, surface mining, etc., can solve the high requirements of forced grooved blasthole construction, the difficulty of single-stage blasting of cutting grooves, and the medium depth outside the vein. The problem of large hole construction workload, etc., achieves the effect of small blasting clamping effect, improving labor environment and reducing construction difficulty.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] see Figure 1 to Figure 3 As shown, this embodiment provides a method of pulling grooves in combination with up and down holes without cutting wells:
[0049] Implementation background: In a gold mine, the average dip angle of the ore body is 38°, and the average thickness is 10m. The ore body occurs in the structural alteration zone and is strictly controlled by the structural fracture zone. Cut wells towards construction.
[0050] The specific construction steps of the slotting method are as follows:
[0051] S1, before pulling the cutting groove, first complete the layout and construction of the lower layer drilling roadway 1, the upper layer rock drilling roadway 2, the mine exit roadway 3, and the ore loading approach roadway 4, relying on the footwall of the ore body and vertically Under the construction of layer rock drilling roadway 1, layer cutting horizontal roadway 5, such as figure 1 and figure 2 shown; wherein, the section specification of the lower la...