National enterprise target management evaluation method and system based on Internet
A target management, Internet technology, applied in data processing applications, instruments, resources, etc., can solve problems such as lack of data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0104] [Example 1] The calculation process and results of the target management evaluation and evaluation of a state-owned enterprise in the current year
[0105] Matrix calculation formula: Y=AX NA-NN , Explanation: NA is the option A of the Nth question, and NN is the Nth option of the Nth question
[0106] Y 15A-15G =0.7921X 1A-1F +1.0443X 2A-2J +0.8889X 3A +1.3114X 3B -1.3856X 3C +0.7997X 3D +1.3856X 3E -1.3856X 3F -1.3856X 3G +0.9582X 4A-4F +0.8235X 5A +0.8235X 5D +0.6946X 6A +0.59X 6B +1.2042X 7A-7E +0.7462X 7F +1.2042X 7G-7I +1.21X 8A-8J +1.0495X 9A-9B -1.0495X 9D-9E +0.5966X 10A-10B -0.5966X 10D-10E +0.8942X 11A-11I +0.8077X 12A-12H +1.3716X 13A-13E +0.5949X 13F-13G +1.3716X 13H-13L +0.5949X 13M +1.3716X 13N +0.7997X 14A-14B +0.8255X 16A-16B -0.8255X 16D-16E +0.8015X 17A-17B +0.8077X 18A-18F +0.9055X 19A-19K
[0107] After calculation, Y is 33.7098 in state-owned enterprises as the leadership core of the team, and the median value of...
example 2
[0110] [Example 2] A state-owned enterprise's annual team building evaluation process
[0111] Import the data of the three-level index system, including five first-level index systems: project construction, team construction, talent selection, risk control construction, and work style construction; 20 second-level index systems; 49 third-level index systems, and set third-level indicators Quantitative score, formulate evaluation form, enterprise network customers fill out the evaluation form.
[0112] If the evaluation score is greater than the first set threshold, it is determined that the team building of the corresponding enterprise is at an optimal level;
[0113] If the evaluation score is greater than the second set threshold and less than the first set threshold, it is determined that the corresponding enterprise team building is at the maintenance level;
[0114] If the evaluation score is less than the second set threshold, it is determined that the team building of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com