Coal-pillar-free mining concrete modular gob-side entry forming supporting structure
A technology of supporting structure and concrete, applied in mining equipment, earthwork drilling, shaft equipment, etc., can solve the problems of unconnected roof work efficiency, long concrete solidification time, affecting wall stubble, etc., to speed up cyclic production progress, improving mine safety, eliminating the effect of solidification time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail in combination with the embodiments and accompanying drawings. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. The technical solutions of the present invention will be described in detail below in conjunction with the embodiments and accompanying drawings, but the scope of protection is not limited thereto.
[0037] A concrete modular gob-side roadway support structure for coal pillar-free mining. The concrete modular wall consists of three parts:
[0038] (1) The upper layer is the roofing and unloading module, including the roofing intermediate concrete module 3, the roofing concrete module 4, and the roofing gap concrete module 5. The design size of the roofing intermediate conc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


