Path planning method for boarding bridge

A path planning and boarding bridge technology, which is applied to aircraft parts, two-dimensional position/flight control, vehicle position/route/altitude control, etc. Aircraft damage, etc.

Active Publication Date: 2022-02-15
SHENZHEN CIMC TIANDA AIRPORT SUPPORT
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the operator of the boarding bridge has been defined as a special type of work. An operator needs to receive about 3 months of systematic training and pass the probationary assessment for more than half a year before he can be approved to take up the post, and he also needs to continue to accumulate in the way of masters and apprentices. Experience improves the technical level. For the airport, the shortage of boarding bridge operators is a more prominent problem; at the same time, due to the influence of factors such as the resignation of operators, the operation of airport boarding bridge equipment is even more difficult.
[0003] In addition, the professional work of boarding bridge operation is relatively difficult. Even operators who have undergone strict training and full practice need to concentrate and be cautious in the process of servicing the aircraft every time. it goes without saying
Often in actual work, the operator is easily affected by the environment or unexpected situations, and omits or makes mistakes in performing relevant operation steps, resulting in accidents where the boarding bridge collides with the aircraft or even damages the aircraft
In addition, due to the incorrect operation of the operator, it will also cause accidents in which other personnel and equipment on the platform are damaged.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Path planning method for boarding bridge
  • Path planning method for boarding bridge
  • Path planning method for boarding bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] Example embodiments will now be described more fully with reference to the accompanying drawings. Example embodiments may, however, be embodied in many forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the concept of example embodiments to those skilled in the art. The same reference numerals in the drawings denote the same or similar structures, and thus their detailed descriptions will be omitted.

[0041] refer to figure 1 , The boarding bridge 100 includes a support column, a rotating platform 101, a telescopic channel 102, a pick-up port 103, a lifting mechanism, a traveling mechanism and a control unit. The rotating platform 101 may be installed on the terminal building, or on the corridor leading to the terminal building. The support columns are arranged at the bottom of the rotating platform 101 for supporting the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a path planning method for a boarding bridge, which includes: obtaining a preset wing anti-collision line; obtaining the positions of a cabin door and an aircraft receiving port, and generating a path connecting the cabin door and the aircraft receiving port; connecting the aircraft port Simulate the process of moving to the door along the path. If the interference between the wing anti-collision line and the outer contour of the boarding bridge is formed during the simulation, at least part of the path in front of the engine will be moved away from the engine, and then the process will be carried out again. Simulate until there is no longer any interference between the wing collision line and the outer contour of the boarding bridge. When the boarding bridge travels along the resulting path, it will not collide with the wing anti-collision line, and will not collide with the aircraft wing or engine.

Description

technical field [0001] The present invention generally relates to a boarding bridge technology, and in particular, relates to a path planning method for a boarding bridge. Background technique [0002] As an important ground equipment for docking with aircraft, the boarding bridge is currently docked and withdrawn manually. However, the operator of the boarding bridge has been defined as a special type of work. An operator needs to receive about 3 months of systematic training and pass the probationary assessment for more than half a year before he can be approved to take up the post, and he also needs to continue to accumulate in the way of masters and apprentices. Experience improves the technical level. For the airport, the shortage of boarding bridge operators is a more prominent problem; at the same time, due to the influence of factors such as the resignation of operators, the operation of airport boarding bridge equipment is even more difficult. [0003] In addition,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G05D1/02B64F1/305
CPCG05D1/0225G05D1/0202B64F1/305G05D1/0214
Inventor 雷安良邓览向卫梁乐贤罗伟余秀强
Owner SHENZHEN CIMC TIANDA AIRPORT SUPPORT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products