Building construction scheme generation method

A construction plan and construction technology, applied in the direction of instruments, electrical digital data processing, data processing applications, etc., can solve problems such as unreasonable construction parameters, inconsistent standards, and various plan versions, so as to achieve good market operation prospects and improve efficiency and progress, solve the effect of various versions

Pending Publication Date: 2020-12-25
成都建工第二建筑工程有限公司 +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, in editing and reviewing construction organization design and special construction plan, due to the uneven technical level of the preparers and the offline preparation process, there are many plan versions, inconsistent standards, unreasonable construction parameters, messy plan storage and inaccessibility outside technical issues

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction scheme generation method
  • Building construction scheme generation method
  • Building construction scheme generation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] The present invention will be clearly and completely described below in conjunction with the accompanying drawings. Those skilled in the art will be able to implement the present invention based on these descriptions. Before the present invention is described in conjunction with the accompanying drawings, it should be pointed out that:

[0049] The technical solutions and technical features provided in each part of the present invention, including the following description, can be combined with each other under the condition of no conflict.

[0050] In addition, the embodiments of the present invention referred to in the following description are generally only a part of the embodiments of the present invention, rather than all the embodiments. Therefore, based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to building construction, in particular to a building construction scheme generation method, which comprises the following steps that: a construction scheme generation system displays at least one building construction project generation component on a display interface after receiving an instruction, and the building construction project generation component comprises a plurality of construction scheme components; after receiving the instruction, the construction scheme component obtains submission time and writes the submission time into an interface; the construction scheme generation system displays a construction scheme editing interface; the editing of the construction scheme comprises the following steps: an editing interface comprises a text component; after the text component is triggered, a content interface for filling in text content is obtained; the one or more construction scheme components form a generated building construction scheme. By adopting the building construction scheme generation method, an operator on a project selects a required template to compile a scheme, submits auditing on line and modifies for the second time to finally form acomplete special construction scheme, and compared with an offline compiled construction scheme, the method can improve the generation efficiency of the construction scheme.

Description

technical field [0001] The patent of the present invention relates to building construction, in particular to a method for generating a building construction plan. Background technique [0002] At present, in editing and reviewing construction organization design and special construction plan, due to the uneven technical level of the preparers and the offline preparation process, there are many plan versions, inconsistent standards, unreasonable construction parameters, messy plan storage and inaccessibility outside technical issues. Contents of the invention [0003] The purpose of the present invention is to provide a method for generating a building construction plan that can better improve the efficiency of construction plan preparation. [0004] In order to achieve the above purpose, the technical solution adopted in this application is a method for generating a building construction plan. The construction plan generation system generates a building construction plan...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F40/186G06F9/451G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08G06F9/451G06F40/186
Inventor 刘宏薛庆文李维刘刚林裕田泽辉文俊杰尹超许健波石伟吴思杉唐海艳范金浔朱才元赵小龙
Owner 成都建工第二建筑工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products