Unlock instant, AI-driven research and patent intelligence for your innovation.

A comprehensive optimization method for building design plans based on bim modeling

An optimization method and building technology, applied in design optimization/simulation, prediction, calculation, etc., can solve the problems affecting the flexibility and convenience of the modeling system, the inability of the modeling system to adjust the hardware system, and the poor efficiency and accuracy of related data acquisition and other issues, to achieve the effect of modeling data comprehensiveness and high reliability, strong information and data processing capabilities, and good data communication

Active Publication Date: 2021-02-19
江苏南码信息科技有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, before building construction, it is necessary to carry out pre-budget work on the construction period and cost of the building. In order to improve the work efficiency of the construction budget, the current construction budget work is gradually introducing auxiliary budget statistics based on the BIM 3D modeling system. In the process of work, Chinese patent, publication number: 111383061A, publication date: 2020-07-07, patent application number: 2020101925861, patent name: A method for preparing project budget estimates based on BIM models, and other construction budget methods, Although this type of method greatly improves the efficiency and calculation accuracy of construction budget work compared with traditional methods, it is found in actual work that when the current BIM-based 3D modeling system is used for auxiliary budget statistics work, it is often impossible to The labor efficiency and cost during the construction period, the impact of market fluctuations on the cost of raw materials for building construction and the extension of the construction period due to weather factors are included in the budget operation, resulting in the accuracy and reliability of the current building construction budget At the same time, the currently used BIM 3D modeling systems are often run on a single machine or a local area network built with several devices, resulting in relatively low efficiency in modeling operations, and relatively poor efficiency and accuracy in obtaining relevant data required for modeling operations At the same time, it also caused the modeling system to be unable to flexibly adjust the hardware system according to the needs of actual use, which seriously affected the flexibility and convenience of the modeling system's manipulation and use.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A comprehensive optimization method for building design plans based on bim modeling
  • A comprehensive optimization method for building design plans based on bim modeling

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] In order to make the technical means, creative features, goals and effects achieved by the present invention easy to understand, the present invention will be further described below in conjunction with specific embodiments.

[0023] Such as figure 1 and 2 As shown, a comprehensive optimization method for building design plans based on BIM modeling, including the following steps;

[0024] S1, system construction, first build a BIM database, 1-3 BIM servers, several BIM workstations, several BIM display terminals and communication networks, the BIM servers are connected in parallel with each other, and are connected to the BIM database and each BIM workstation through the communication network , the BIM workstations are connected through a communication network and connected to the BIM display terminal through the communication network, the number of the BIM display terminals is not greater than the number of BIM workstations, each BIM display terminal is connected to a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a comprehensive optimization method for building design plans based on BIM modeling, including five steps of system construction, basic data entry, group modeling, building modeling and cost analysis. On the one hand, the system structure of the present invention is simple, easy and flexible to operate, and has good data communication and system expansion capabilities, and can effectively adjust hardware and human resources flexibly according to the actual workload, so as to flexibly meet the requirements of building three-dimensional modeling and construction cost analysis On the other hand, the information data processing ability is strong, the modeling efficiency is high, and the modeling data is comprehensive and reliable, thus effectively overcoming the traditional BIM modeling system for building composition analysis that cannot be based on actual market fluctuations and natural construction. The shortcomings of flexible adjustment due to environmental changes have greatly improved the work accuracy of 3D modeling and cost analysis of buildings.

Description

technical field [0001] The invention relates to a building construction budget method, in particular to a BIM modeling-based comprehensive optimization method for building design plans. Background technique [0002] At present, before building construction, it is necessary to carry out pre-budget work on the construction period and cost of the building. In order to improve the work efficiency of the construction budget, the current construction budget work is gradually introducing auxiliary budget statistics based on the BIM 3D modeling system. In the process of work, Chinese patent, publication number: 111383061A, publication date: 2020-07-07, patent application number: 2020101925861, patent name: A method for preparing project budget estimates based on BIM models, and other construction budget methods, Although this type of method greatly improves the efficiency and calculation accuracy of construction budget work compared with traditional methods, it is found in actual wo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/08G06F30/13
CPCG06Q10/04G06Q10/06313G06Q50/08G06F30/13G06F30/20
Inventor 王静宇
Owner 江苏南码信息科技有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More