Building safety assessment method and device, equipment and storage medium
A security assessment and building technology, applied in the field of equipment and storage media, devices, and building security assessment methods, can solve the problems of high cost, low efficiency, complex detection equipment and procedures, and achieve the goal of improving efficiency and reducing detection costs. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] figure 1 It is a schematic flowchart of a building safety assessment method provided by Embodiment 1 of the present invention. This embodiment is applicable to monitoring the structural health of buildings. like figure 1 As shown, the building safety assessment method provided by Embodiment 1 of the present invention includes:
[0044] S110. Acquire seismic background noise data of the building to be measured.
[0045] Specifically, the building to be tested refers to a building that requires a safety assessment. Generally, performing a safety assessment on a building is to perform a health inspection on the building, that is, to determine whether the structure of the building is normal or safe. The seismic background noise data refers to the background noise data measured by the seismograph installed inside the building to be tested.
[0046] S120. Perform clock drift correction on the seismic background noise data to obtain correction data.
[0047] Specifically, ...
Embodiment 2
[0054] figure 2 It is a schematic flowchart of a building safety assessment method provided by Embodiment 2 of the present invention, and this embodiment is a further refinement of the foregoing embodiments. like figure 2 As shown, the building safety assessment method provided by the embodiment of the present invention includes:
[0055] S210. Obtain seismic background noise data within a preset observation period through a dense array seismometer set in the building to be measured.
[0056]In this embodiment, the building to be tested is a super high-rise building, such as Shanghai Tower. If a seismometer is placed on each floor of the building to be tested, then all the seismometers in the building to be tested form a dense array. For example, if a seismometer is placed on each floor of the Shanghai Tower, a total of 126 seismometers are deployed, and the seismometers are placed at the same position on each floor, then the seismometers in the Shanghai Tower form a vert...
Embodiment 3
[0067] image 3 It is a schematic flow chart of a building safety assessment method provided by Embodiment 3 of the present invention. This embodiment is a further optimization of the foregoing embodiments. like image 3 As shown, the building safety assessment method provided by the embodiment of the present invention includes:
[0068] S310. Obtain seismic background noise data within a preset observation period through a dense array seismometer set in the building to be measured.
[0069] S320. Perform clock drift correction on the seismic background noise data through seismic cross-correlation interferometry technology to obtain correction data.
[0070] S330. Determine the velocity disturbance of the building to be tested according to the calibration data.
[0071] Specifically, the velocity disturbance refers to the variation range of the velocity of the building to be measured in response to external excitation. In this embodiment, the external excitation is the nois...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com