System and method for planning balance assistance based on electric power big data
A technology of big data and planning, applied in the field of information and communication, can solve problems such as lack of planning balance, heavy workload of personnel, and limited considerations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 As shown, the present invention discloses a system based on power big data plan balance assistance, including a plan balance module running on the controller. The plan balance module includes an overhaul year plan module, an overhaul month plan module, and a variable factor module. The balance module, maintenance year planning module, maintenance month planning module and variable factor module are program modules.
[0032] The maintenance year plan module is used for the controller to obtain the last verification time in the equipment ledger and the corresponding verification period of the equipment. When the last verification time in the equipment ledger + the corresponding verification period of the equipment <= the current year, Generate the plan into the annual inspection plan for this year; obtain the list of overhauled technical equipment, and list the plan reported one year in advance as the overhaul project for this year.
[0033] The maintena...
Embodiment 2
[0037] Such as figure 2 As shown, the present invention discloses a method for planning balance assistance based on electric power big data, including the following steps:
[0038] S1 Maintenance Year Plan
[0039] The controller obtains the last verification time in the equipment ledger and the corresponding verification cycle of the device. When the last verification time in the device ledger + the corresponding verification cycle of the device <= the current year, the plan is generated to the annual inspection plan for this year Medium; Obtain the list of overhaul technical upgrading equipment, and list the plan reported one year in advance as the overhaul project for this year.
[0040] S2 Maintenance Month Plan
[0041] The controller obtains the monthly plan decomposed from the annual plan and runs the established defect elimination plan to generate the balance factor when generating the maintenance monthly plan; the controller arranges time according to the defect le...
Embodiment 3
[0045] Embodiment 3 is different from Embodiment 1 in that the controller is a computer.
[0046] Such as image 3 As shown, the present invention discloses a system based on power big data plan balance assistance, including a plan balance module running on the controller. The plan balance module includes an overhaul year plan module, an overhaul month plan module, and a variable factor module. The balance module, maintenance year planning module, maintenance month planning module and variable factor module are program modules.
[0047] The maintenance year plan module is used for the controller to obtain the last verification time in the equipment ledger and the corresponding verification period of the equipment. When the last verification time in the equipment ledger + the corresponding verification period of the equipment <= the current year, Generate the plan into the annual inspection plan for this year; obtain the list of overhauled technical equipment, and list the pla...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com