Flue gas waste heat efficient comprehensive utilization system
By designing a high-efficiency comprehensive utilization system for flue gas waste heat, the problems of acid dew point, fly ash wear, and air preheater blockage in flue gas waste heat utilization have been solved, realizing safe and reliable cascade waste heat utilization and improving the economic efficiency of power plants.
Patent Information
- Application Number
- CN202010564708.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-19
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-06-19
AI Technical Summary
In existing technologies, the utilization of waste heat from flue gas is contradictory to flue gas acid dew point, fly ash particle wear, and ammonium bisulfate blockage in air preheaters, making it difficult to achieve efficient and comprehensive utilization.
A high-efficiency comprehensive utilization system for flue gas waste heat was designed, including a flue gas heat release system, a waste heat utilization circulating heat exchange system, and a hot air heating system. It adopts components such as air preheater bypass, fly ash separator, wear-resistant tiles, acid-resistant flue, independent circulating heat exchange system, and high-temperature air cooler to ensure safe flue gas flow and cascade utilization of heat.
It reduced the wear of fly ash on the heat-receiving surfaces of waste heat utilization, solved the problem of ammonium bisulfate blockage in the air preheater, balanced the damage of flue gas acid corrosion to the waste heat surfaces, realized the cascade utilization of flue gas waste heat, improved the economic efficiency of the power plant, and solved the problems of freezing and cracking of the heater and air leakage in cold regions.
Smart Images

Figure CN111706849B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of thermal power generation, and in particular relates to a system for efficiently and comprehensively utilizing flue gas waste heat. Background Art
[0002] Exhaust heat loss is the main form of boiler heat loss. The utilization of flue gas waste heat has become the main way to improve the comprehensive utilization of energy. However, there is a relative contradiction between the utilization of flue gas waste heat and the acid dew point of flue gas, the abrasion of fly ash particles and the blockage of ammonium bisulfate in the air preheater. In order to comprehensively solve the influence of ammonium bisulfate blockage in the air preheater, the abrasion of fly ash particles and the acid dew point of flue gas on the utilization of waste heat, a set of flue gas waste heat efficient comprehensive utilization system is needed. Summary of the invention
[0003] The purpose of the present invention is to provide a system for the efficient comprehensive utilization of flue gas waste heat to solve the above technical problems.
[0004] The present invention provides a flue gas waste heat efficient comprehensive utilization system, including a flue gas heat release system, a waste heat utilization circulation heat exchange system and a hot air heating system;
[0005] The flue gas heat release system includes an air preheater bypass and a flue from the air preheater to the desulfurization island. The air preheater bypass is provided with an air preheater bypass flue gas regulating baffle, a fly ash separator, an air preheater bypass primary heat exchanger, and an air preheater bypass secondary heat exchanger in sequence along the flue gas flow direction; the flue from the air preheater to the desulfurization island is provided with an induced draft fan, and the outlet of the induced draft fan is provided with a primary heat exchanger before the desulfurization island and a secondary heat exchanger before the desulfurization island in sequence; the flue from the secondary heat exchanger before the desulfurization island to the desulfurization island section adopts an acid-resistant flue; the primary heat exchanger before the desulfurization island and the secondary heat exchanger before the desulfurization island are arranged in a slightly inclined manner to allow the condensed acid dew to flow safely to the desulfurization island;
[0006] The waste heat utilization circulation heat exchange system includes a water supply tank, a heater circulation pump, a primary heat exchanger at the outlet of the induced draft fan, a secondary heat exchanger at the outlet of the induced draft fan, a secondary heat exchanger at the bypass of the air preheater, a primary heat exchanger at the bypass of the air preheater, a phase change heat exchanger, an air supply or primary air-water heat exchanger, and a steam turbine deaerator; the water supply tank is connected to the secondary heat exchanger at the outlet of the induced draft fan, the primary heat exchanger at the outlet of the induced draft fan, the secondary heat exchanger at the bypass of the air preheater, the primary heat exchanger at the bypass of the air preheater, and the steam turbine deaerator in sequence through the heater circulation pump; the primary heat exchanger at the bypass of the air preheater is connected to the air supply or primary air-water heat exchanger through the phase change heat exchanger; the secondary heat exchanger at the bypass of the air preheater is connected to the water supply tank through the air supply or primary air-water heat exchanger;
[0007] The hot air heating system includes an air supply heating system and a primary air heating system. The air supply channel of the air supply heating system is provided with an air supply fan, a heat exchanger, an air preheater and a high-temperature air cooler in sequence along the air supply direction. The heat exchanger of the air supply heating system adopts a water heat exchanger or adopts a water heat exchanger and a phase change heat exchanger in sequence along the air supply direction. The air supply channel is also connected to a winter antifreeze recirculation air duct, one end of which is connected to the air supply channel between the air supply fan and the fan inlet, and the other end is connected to the air supply channel behind the high-temperature air cooler along the air supply direction.
[0008] The primary air channel of the primary air heating system is provided with a primary fan, a heat exchanger, an air preheater and a high-temperature air cooler in sequence along the flow direction of the primary air. The heat exchanger of the primary air heating system adopts a water heat exchanger or adopts a water heat exchanger and a phase change heat exchanger in sequence along the flow direction of the primary air. The primary air channel is also connected to a winter antifreeze recirculation air duct, one end of which is connected to the primary air channel between the primary fan and the fan inlet, and the other end is connected to the supply air channel behind the high-temperature air cooler of the supply air heating system.
[0009] Furthermore, the air preheater bypass primary heat exchanger and the air preheater bypass secondary heat exchanger are correspondingly equipped with soot blowers.
[0010] Furthermore, the air preheater adopts a rotary air preheater with a three-compartment arrangement or a four-compartment arrangement, which is used to increase the air temperature of the air preheater inlet to warm air or hot air, so as to ensure that the rotor temperature reaches the condition that ammonium bisulfate does not solidify before the air preheater rotates to the flue gas side, and to ensure that the exhaust gas temperature at any point is not lower than 146°C.
[0011] Furthermore, the air preheater bypass primary heat exchanger and the air preheater bypass secondary heat exchanger are provided with anti-wear tiles.
[0012] Furthermore, the fly ash separator includes a smoke guide plate, an air-locking wing-shaped separation grille, and an ash removal system. The smoke guide plate is arranged at the smoke inlet and the smoke outlet, the air-locking wing-shaped separation grille is arranged below the smoke guide plate at the smoke inlet, and the ash removal system is connected to the air-locking wing-shaped separation grille.
[0013] Furthermore, a fan outlet electric door is provided between the water heat exchanger and the fan in the air supply heating system.
[0014] Furthermore, an adjustable electric door is provided in the winter antifreeze recirculation air duct in the air supply heating system.
[0015] Furthermore, a fan outlet electric door is provided between the water heat exchanger and the primary fan in the primary air heating system.
[0016] Furthermore, an adjustable electric door is provided in the winter antifreeze recirculation air duct in the primary air heating system.
[0017] Through the above scheme, the flue gas waste heat efficient comprehensive utilization system has the following technical effects:
[0018] (1) Reduce the damage caused by fly ash to the wear of the heating surface of waste heat utilization.
[0019] (2) The problem of ammonium bisulfate blockage in the rotary air preheater during the denitrification process was solved.
[0020] (3) Balances the damage caused by flue gas acid erosion to the heating surface for flue gas waste heat utilization.
[0021] (4) The cascade utilization of flue gas waste heat is realized, improving the economic efficiency of the power plant.
[0022] (5) Solved the problem of frequent freezing and leakage of heaters in cold areas in winter.
[0023] (6) The problem of increased air leakage in air preheaters in cold regions in winter has been solved.
[0024] (7) The wing-shaped separation grid purifies the fly ash in the flue gas, which not only reduces the damage caused by fly ash to the wear of the waste heat utilization heating surface, but also reduces the burden on the dust collector.
[0025] (8) The air-locking wing-shaped separation grille realizes automatic cleaning of accumulated dust.
[0026] (9) The waste heat utilization adopts an independent circulation heat exchange system, which can achieve the requirements of safety, reliability and flexible adjustment.
[0027] (10) The high-temperature air cooler can not only cool down the high-load air temperature, but also heat the low-load cold air.
[0028] (11) The air heater is arranged at the fan outlet and after the hot air recirculation, which can not only ensure that the air temperature before the heater is always greater than 5°C, but also utilize the boost heat of the fan to ensure the safety of the heater.
[0029] (12) The system's practicality, scientificity, feasibility, safety and innovation meet all the requirements for engineering applications.
[0030] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention and implement it according to the contents of the specification, the preferred embodiments of the present invention are described in detail as follows. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a structural schematic diagram of the flue gas heat release system of the present invention;
[0032] Figure 2 This is the layout diagram of the air preheater bypass heat exchanger of the present invention;
[0033] Figure 3 It is a schematic diagram of the air preheater arrangement type;
[0034] Figure 4 Schematic diagram of the arrangement of the anti-wear tiles of the heat exchanger of the present invention;
[0035] Figure 5 It is a structural schematic diagram of the fly ash separator of the present invention;
[0036] Figure 6 It is a schematic diagram of the structure of the wing-shaped separation grid of the present invention;
[0037] Figure 7 It is a structural schematic diagram of the air lock blocker of the present invention;
[0038] Figure 8 It is a schematic diagram of the structure of the air lock counterweight and the support shaft of the present invention;
[0039] Fig. 9 It is a structural schematic diagram of the waste heat utilization circulation heat exchange system of the present invention;
[0040] Fig.10 It is a structural schematic diagram of the air supply heating system of the present invention;
[0041] Fig.11 It is a structural schematic diagram of the primary air heating system of the present invention.
[0042] Numbers in the figure:
[0043] 11-air preheater; 12-air preheater bypass flue gas regulating baffle; 13-fly ash separator; 131-flue gas guide plate; 132-wing-shaped separation grid; 133-ash removal system; 134-blocker; 135-air lock counterweight; 136-support shaft; 14-air preheater bypass primary heat exchanger; 141-heat exchanger anti-wear tile; 15-air preheater bypass secondary heat exchanger; 16-dust collector; 17-induced draft fan; 18-primary heat exchanger before desulfurization island; 19-secondary heat exchanger before desulfurization island;
[0044] 21-water supply tank; 22-heater circulation pump; 23-induced draft fan outlet primary heat exchanger; 24-induced draft fan outlet secondary heat exchanger; 25-air preheater bypass secondary heat exchanger; 26-air preheater bypass primary heat exchanger; 27-circulating heat exchange system phase change heat exchanger; 28-air supply or primary air-water heat exchanger; 29-turbine deaerator;
[0045] 31-water heat exchanger; 32-hot air heating system phase change heat exchanger; 33-winter antifreeze recirculation air duct; 34-high temperature air cooler; 35-air preheater; 36-air supply fan; 37-primary fan; 38-fan outlet electric door; 39-adjustable electric door. DETAILED DESCRIPTION
[0046] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0047] This embodiment provides a system for efficient and comprehensive utilization of flue gas waste heat, which mainly includes a flue gas heat release system, a waste heat utilization circulation heat exchange system, and a hot air heating system. Each system is described in further detail below.
[0048] 1. Flue gas heat release system
[0049] Ginseng Figure 1 As shown, the flue gas heat release system consists of an air preheater 11, an air preheater bypass flue gas regulating damper 12, a fly ash separator 13, an air preheater bypass primary heat exchanger 14 (including a soot blower), an air preheater bypass secondary heat exchanger 15 (including a soot blower), a desulfurization island front primary heat exchanger 18, a desulfurization island front secondary heat exchanger 19, a flue, a heating surface pipeline, a valve and corresponding thermal measurement points. The air preheater 11 adopts a rotary air preheater.
[0050] The flue gas heat release system includes an air preheater bypass and a flue gas duct from the air preheater to the desulfurization island. The air preheater bypass is provided with an air preheater bypass flue gas regulating damper 12, a fly ash separator 13, an air preheater bypass primary heat exchanger 14, and an air preheater bypass secondary heat exchanger 15 in sequence along the flue gas flow direction; an induced draft fan 17 is provided at the flue gas duct from the air preheater to the desulfurization island, and a primary heat exchanger 18 before the desulfurization island and a secondary heat exchanger 18 before the desulfurization island are provided at the outlet of the induced draft fan 17 in sequence; an acid-resistant flue gas is used from the secondary heat exchanger 19 before the desulfurization island to the desulfurization island section; the primary heat exchanger 18 before the desulfurization island and the secondary heat exchanger 19 before the desulfurization island are provided to ensure that the condensed acid dew flows safely to the desulfurization island.
[0051] Ginseng Figure 2 As shown, the air preheater bypass heat exchanger is divided into two stages, and a corresponding soot blower is installed at each stage. After the steam and water are separated in the secondary heat exchanger, the steam enters the dust collector 16. The soot blowers equipped with the primary and secondary heat exchangers can remove the dust on the heating surface to ensure the heat exchange effect of the heating surface. The flue gas bypass exhaust temperature is coordinated with the air preheater outlet exhaust temperature to ensure that it does not exceed the dust collector temperature requirement. The soot blowing pipeline can directly use the air preheater soot blowing pipeline and integrate it into the air preheater soot blowing system. The air preheater bypass primary and secondary heat exchangers carry anti-wear tiles.
[0052] Ginseng Figure 4As shown, the heat exchanger anti-wear tile 141 is designed to cover the first heating surface tube, the purpose is to prevent the heating surface from being directly eroded by the airflow, reduce the wear of the heating surface, and at the same time, perform flue gas flow uniformity to further reduce the damage to the heating surface caused by airflow deviation.
[0053] The outlet of the induced draft fan 17 is provided with a primary and secondary heat exchanger. The reason for grading the heat exchanger is the acid dew point of the flue gas. The primary heat exchanger 18 before the desulfurization tower is arranged before the acid dew point of the flue gas, and the secondary heat exchanger 19 before the desulfurization tower is arranged after the acid dew point of the flue gas. Therefore, the flue gas ducts after the secondary and secondary stages need to be designed to prevent acid corrosion. At the same time, the two-stage heat exchanger is arranged in a slightly inclined arrangement to ensure that the condensed acid dew can flow safely to the desulfurization island. Although the additional secondary arrangement can improve the economy of flue gas waste heat utilization, it will also increase the corresponding investment. Users can choose a primary or two-stage arrangement according to their needs. The exhaust temperature after the primary arrangement should not be lower than 90°C. When the exhaust temperature after the first stage is lower than 90°C, in order to protect the primary heat exchanger and the flue gas, the primary heat exchanger is not put into use.
[0054] The air temperature at the air preheater inlet is raised to warm air or hot air. According to the air preheater rotation direction, before the air preheater rotates to the flue gas side, ensure that the rotor temperature reaches the condition where ammonium bisulfate does not condense, and ensure that the exhaust gas temperature at any point is not lower than 146°C, completely solving the condensation of ammonium bisulfate and the problem of ammonium bisulfate blockage in the air preheater. Commonly used layout types are as follows: Figure 3 As shown, Figures a and b are four-compartment layouts; Figures c and d are three-compartment layouts. This embodiment uses hot air before entering the flue gas side.
[0055] Ginseng Figures 5 to 8 As shown, the fly ash separator 13 is composed of a flue gas guide plate 131, an air-locking wing-shaped separation grille 132, an ash removal system 133, and corresponding ash removal compressed air, pipelines, valves, and thermal measurement points. The flue gas guide plate 131 is arranged at the flue gas inlet and the flue gas outlet, the wing-shaped separation grille 132 is arranged below the flue gas guide plate 131 at the flue gas inlet, and the ash removal system 133 is connected to the wing-shaped separation grille 132. The flue gas guide plate 131 realizes the uniform flow of flue gas and the adjustment of the flue gas flow direction. The flue gas guide plate 131 close to the flue gas inlet enables the flue gas to face the air-locking wing-shaped separation grille 132, ensuring more effective separation of fly ash in the flue gas, and the flue gas guide plate 131 close to the flue gas outlet realizes uniform flow of flue gas, reducing the wear of the heating surface caused by uneven flue gas. The fly ash separator can reduce the dust content in the flue gas and reduce the burden on the dust collector.
[0056] The airfoil-shaped separation grid 132 can utilize the inertia of the fly ash to efficiently separate the fly ash and can avoid the backflow of the fly ash without increasing much resistance of the system.
[0057] The air lock of the airfoil separation grid 132 is composed of a blocker 134, an air lock counterweight 135 and a support shaft 136. Other air locks can also be used. The purpose is to naturally unload the ash when there is a lot of ash accumulated on the airfoil separation grid, so that the ash enters the ash removal system 133. The ash removal system adopts a traditional ash removal method. Since it mainly transports coarse ash, it can be directly transported to the slag removal system.
[0058] 2. Waste heat utilization circulation heat exchange system
[0059] Ginseng Fig. 9 As shown, in order to improve the safety of the system and reduce the interference to the host system, the heat transfer adopts an independent circulating heat exchange system. The water used in the circulating heat exchange system comes from chemical desalted water. The system mainly consists of chemical water, water supply tank 21, heater circulation pump 22, primary heat exchanger 23 at the outlet of induced draft fan, secondary heat exchanger 24 at the outlet of induced draft fan, secondary heat exchanger 25 at the bypass of air preheater, primary heat exchanger 26 at the bypass of air preheater, phase change heat exchanger 27 of circulating heat exchange system, air supply or primary air-water heat exchanger 28, turbine deaerator 29 and corresponding pipelines, valves, drains, bypasses and thermal measurement points.
[0060] The make-up water tank 21 is connected to the secondary heat exchanger 24 at the outlet of the induced draft fan, the primary heat exchanger 23 at the outlet of the induced draft fan, the secondary heat exchanger 25 of the air preheater bypass, the primary heat exchanger 26 of the air preheater bypass, and the steam turbine deaerator 29 in sequence through the heater circulation pump 22; the primary heat exchanger 26 of the air preheater bypass is connected to the supply air or primary air-water heat exchanger 28 through the circulating heat exchange system phase change heat exchanger 27; the secondary heat exchanger 25 of the air preheater bypass is connected to the make-up water tank 21 through the supply air or primary air-water heat exchanger 28.
[0061] The chemically desalted water is pressurized by the heater circulation pump 22 and enters the secondary heat exchanger 24 (optional) at the outlet of the induced draft fan, the primary heat exchanger 23 at the outlet of the induced draft fan, and the secondary heat exchanger 25 of the air preheater bypass. After steam-water separation, the steam enters the primary heat exchanger 26 of the air preheater bypass, and the water enters the supply air or primary air-water heat exchanger 28. The steam is heated by the primary heat exchanger 26 of the air preheater bypass and then enters the phase change heat exchanger 27 of the circulating heat exchange system. The excess steam enters the steam turbine deaerator 29. The drainage of the phase change heat exchanger 27 of the circulating heat exchange system enters the supply air or primary air-water heat exchanger 28 to continue heating the supply air (primary air) system. The water in the supply air or primary air-water heat exchanger 28 returns to the make-up water tank 21.
[0062] In this embodiment, the steam-water separation from the second stage to the first stage of the air preheater bypass adopts the traditional drum boiler method, and the steam flow separation of the first stage adopts the method of heating air as the main method and deaerator as the auxiliary method to ensure that the air preheater will not be blocked.
[0063] 3. Hot air heating system
[0064] Ginseng Fig.10 , Fig.11 As shown, the hot air heating system includes a supply air heating system and a primary air heating system, and both the supply air heating system and the primary air heating system include a water heat exchanger 31, a hot air heating system phase change heat exchanger 32, a winter antifreeze hot air recirculation 33, a high temperature air cooler 34, and corresponding measuring points (T / P) and electric doors, etc. The hot air heating system is arranged with a water heat exchanger or a water heat exchanger + a phase change heat exchanger according to the requirements of the wind temperature. At the same time, a hot air recirculation system is added to deal with the problems of freezing and cracking leakage of heaters in winter in cold areas and increased air leakage of air preheaters caused by cold weather. Since the high temperature air of the primary air belongs to high pressure head air, in order to comprehensively utilize the efficiency of the fan, the recirculation air at the inlet of the primary fan should adopt the supply air recirculation after the high temperature cooler. If there is a problem of difficulty in arrangement, the primary air after the high temperature cooler can also be used. At the same time, temperature (T) and pressure (P) measuring points are added to the smoke and air duct system to facilitate control and adjustment.
[0065] The hot air heating system includes an air supply heating system and a primary air heating system. The air supply channel of the air supply heating system is provided with an air supply fan 36, a heat exchanger, an air preheater 35, and a high-temperature air cooler 34 in sequence along the air supply direction. The air supply heating system heat exchanger adopts a water heat exchanger 31 or adopts a water heat exchanger 31 and a hot air heating system phase change heat exchanger 32 in sequence along the air supply direction. The air supply channel is also connected to a winter antifreeze recycling air duct 33. One end of the winter antifreeze recycling air duct 33 is connected to the air supply channel between the air supply fan 36 and the fan inlet, and the other end is connected to the air supply channel after the high-temperature air cooler 34 along the air supply direction.
[0066] In the primary air channel of the primary air heating system, a primary fan 37, a heat exchanger, an air preheater 35, and a high-temperature air cooler 34 are arranged in sequence along the primary air flow direction. The primary air heating system heat exchanger adopts a water heat exchanger 31, or adopts a water heat exchanger 31 and a hot air heating system phase change heat exchanger 32 in sequence along the primary air flow direction; the primary air channel is also connected to a winter antifreeze recycling air duct 33, one end of the winter antifreeze recycling air duct 33 is connected to the primary air channel between the primary fan 37 and the fan inlet, and the other end is connected to the supply air channel behind the high-temperature air cooler 34 of the supply air heating system.
[0067] A fan outlet electric door 38 is provided between the water heat exchanger 31 and the fan 36 in the air supply heating system; an adjustable electric door 39 is provided in the winter antifreeze recirculation air duct 33 in the air supply heating system; a fan outlet electric door 38 is provided between the water heat exchanger 31 and the primary fan 37 in the primary air heating system; and an adjustable electric door 39 is provided in the winter antifreeze recirculation air duct 33 in the primary air heating system.
[0068] The hot air heating system is arranged with a water heat exchanger or a water heat exchanger + a phase change heat exchanger according to the wind temperature requirements. It is recommended to increase the air temperature at the air preheater inlet to between 80 and 90°C, and at least ensure that the air temperature before the heat exchanger returns to the flue gas side is not less than 80°C.
[0069] Due to the increase of hot air, the high temperature air temperature at the outlet of the air preheater is increased. For the safety of the burner, the safety of the heating surface and the reduction of the exhaust temperature, it is necessary to reduce the high temperature air temperature and add a high temperature air cooler, which can also achieve the comprehensive utilization of energy. Generally, the high temperature air temperature can reach between 350 and 400 ° C, which can heat the feed water and realize the function of some economizers. The feed water flow is adjusted according to the requirements of the high temperature wind reduction.
[0070] When the ambient temperature is lower than 5°C, the winter antifreeze recirculation duct 33 is opened to protect the water heat exchanger 31 and the phase change heat exchanger 32 of the hot air heating system. At the same time, the problem of increased air leakage in the air preheater caused by winter in cold areas is solved. In addition, the high-temperature air cooler and the recirculation duct work together to realize the air supply start-up heating function during the startup process, thereby meeting the full-time heater protection from startup to full load.
[0071] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the technical principles of the present invention, and these improvements and modifications should also be regarded as within the scope of protection of the present invention.
Claims
1. A system for efficient comprehensive utilization of flue gas waste heat, It is characterized in that Including flue gas heat release system, waste heat utilization circulation heat exchange system and hot air heating system; The flue gas heat release system includes an air preheater bypass and a flue from the air preheater to the desulfurization island. The air preheater bypass is provided with an air preheater bypass flue gas regulating baffle, a fly ash separator, an air preheater bypass primary heat exchanger, and an air preheater bypass secondary heat exchanger in sequence along the flue gas flow direction; the flue from the air preheater to the desulfurization island is provided with an induced draft fan, and the outlet of the induced draft fan is provided with a primary heat exchanger before the desulfurization island and a secondary heat exchanger before the desulfurization island in sequence; the flue from the secondary heat exchanger before the desulfurization island to the desulfurization island section adopts an acid-resistant flue; the primary heat exchanger before the desulfurization island and the secondary heat exchanger before the desulfurization island are arranged in a slightly inclined manner to allow the condensed acid dew to flow safely to the desulfurization island; The first-stage heat exchanger before the desulfurization tower is arranged before the flue gas acid dew point, and the second-stage heat exchanger before the desulfurization tower is arranged after the flue gas acid dew point; The waste heat utilization circulation heat exchange system includes a water supply tank, a heater circulation pump, a primary heat exchanger at the outlet of the induced draft fan, a secondary heat exchanger at the outlet of the induced draft fan, a secondary heat exchanger at the bypass of the air preheater, a primary heat exchanger at the bypass of the air preheater, a phase change heat exchanger, an air supply or primary air-water heat exchanger, and a steam turbine deaerator; the water supply tank is connected to the secondary heat exchanger at the outlet of the induced draft fan, the primary heat exchanger at the outlet of the induced draft fan, the secondary heat exchanger at the bypass of the air preheater, the primary heat exchanger at the bypass of the air preheater, and the steam turbine deaerator in sequence through the heater circulation pump; the primary heat exchanger at the bypass of the air preheater is connected to the air supply or primary air-water heat exchanger through the phase change heat exchanger; the secondary heat exchanger at the bypass of the air preheater is connected to the water supply tank through the air supply or primary air-water heat exchanger; The hot air heating system includes an air supply heating system and a primary air heating system. The air supply channel of the air supply heating system is provided with an air supply fan, a heat exchanger, an air preheater, and a high-temperature air cooler in sequence along the air supply direction. The air supply heating system heat exchanger adopts a water heat exchanger or adopts a water heat exchanger and a phase change heat exchanger in sequence along the air supply direction. The air supply channel is also connected to a winter antifreeze recirculation air channel. One end of the winter antifreeze recirculation air channel is connected to the air supply channel between the air supply fan and the fan inlet, and the other end is connected to the air supply channel after the high-temperature air cooler along the air supply direction. A primary air fan, a heat exchanger, an air preheater, and a high-temperature air cooler are sequentially arranged in the primary air channel of the primary air heating system along the primary air flow direction. The heat exchanger of the primary air heating system adopts a water heat exchanger or sequentially adopts a water heat exchanger and a phase change heat exchanger along the primary air flow direction; the primary air channel is also connected to a winter antifreeze recirculation air channel, one end of the winter antifreeze recirculation air channel is connected to the primary air channel between the primary air fan and the fan inlet, and the other end is connected to the air supply channel after the high-temperature air cooler of the air supply heating system; The air preheater adopts a rotary air preheater with a three-compartment arrangement or a four-compartment arrangement, which is used to increase the air temperature at the air preheater inlet to warm air or hot air, so as to ensure that the rotor temperature reaches the condition that ammonium bisulfate does not solidify before the air preheater rotates to the flue gas side, and to ensure that the exhaust gas temperature at any point is not lower than 146°C; The fly ash separator comprises a smoke guide plate, an air-locking wing-shaped separation grid, and an ash removal system. The smoke guide plate is arranged at the smoke inlet and the smoke outlet. The air-locking wing-shaped separation grid is arranged below the smoke guide plate at the smoke inlet. The ash removal system is connected to the air-locking wing-shaped separation grid. The air locker of the wing-shaped separation grid is composed of a blocker, an air locker counterweight and a support shaft.
2. According to the flue gas waste heat efficient comprehensive utilization system of claim 1, It is characterized in that The air preheater bypass primary heat exchanger and the air preheater bypass secondary heat exchanger are correspondingly equipped with soot blowers.
3. According to claim 2, the flue gas waste heat efficient comprehensive utilization system, It is characterized in that The air preheater bypass primary heat exchanger and the air preheater bypass secondary heat exchanger are provided with anti-wear tiles.
4. According to claim 1, the flue gas waste heat efficient comprehensive utilization system, It is characterized in that In the air supply heating system, an electric door for the fan outlet is arranged between the water heat exchanger and the fan.
5. According to claim 4, the flue gas waste heat efficient comprehensive utilization system, It is characterized in that An adjustable electric door is provided in the winter antifreeze recirculation air duct in the air supply heating system.
6. The flue gas waste heat efficient comprehensive utilization system according to claim 1, It is characterized in that A fan outlet electric door is provided between the water heat exchanger and the primary fan in the primary air heating system.
7. The flue gas waste heat efficient comprehensive utilization system according to claim 6, It is characterized in that An adjustable electric door is provided in the winter antifreeze recirculation air duct in the primary air heating system.
Citation Information
Patent Citations
Zig air flue K-shaped flow equalizing apparatus with flyash separation
CN101440959A
Method for reducing ash fouling of air preheater of coal burning boiler and cyclone separator therefor
CN101629725A
System and method for preventing ammonium bisulfate from blocking air preheater after SCR denitration modification
CN107642793A
Smoke waste heat utilization system and method based on multiple energy levels and recycling cold air heating
CN108443906A
Heat primary air circulation anti-blocking device based on combustion bitumite and anthracite boiler rotary air preheater
CN108826349A