Stone micro-pressure grouting concrete structure reinforcing method
A technology of concrete structure and gravel, which is applied in building construction, building maintenance, construction, etc., can solve the problems of less concrete, impossibility, external wall leakage, etc., and achieve the increase of component cross-sectional size, wide application range, and high quality guaranteed effect
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2022-04-08
Smart Images

Figure 1
Abstract
Description
technical field
[0001] The invention relates to the technical field of construction, in particular to a method for reinforcing concrete structures filled with gravel micro-pressure grouting. Background technique
[0002] my country's prefabricated construction industry is ushering in a new stage of rapid development. The contradiction between the rapid development of prefabricated buildings and the inspection and acceptance of related construction quality has gradually become prominent. The assembly steps of the nodes are completed on site: node reinforcement binding-blocking formwork-pouring concrete.
[0003] However, in the construction management, it was found that the vertical joint structure between the precast walls, the vertical joint structure of the precast wall at the corner, and the vertical joint structure of the prefabricated wall at the wing wall are very prone to concrete inconsistency in this part Phenomenon, there are many honeycombs and pores, and even lar...
Examples
Embodiment Construction
[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
[0032] refer to figure 1 , a method for reinforcing concrete structures filled with gravel micro-pressure grouting, comprising the following steps:
[0033] The first step: Chisel off the uncompacted concrete, clean the section, and repair the steel bar 1;
[0034] Specifically, while trimming the steel bars 1, the original stirrups are trimmed synchronously to ensure that the distances between the two stirrups are the same and they are arranged on the same axis.
[0035] Step 2: Bind the barbed wire cloth 2, fill the coarse aggregate stone 3, and make it evenly distributed, and the amount of the coarse aggregate stone 3 accounts for about 50%-60% of the cavity volu...