A tower foundation construction measurement tool and measurement method thereof
By designing a multi-functional line tower foundation construction measurement tool, using horizontal rotatable seat body and connecting ruler, the problem of tower foundation measurement in complex terrain and GPS-free areas is solved, and fast and accurate measurement and positioning is achieved, reducing the problem of tower foundation measurement in complex terrain and GPS-free areas. Operational complexity and cost.
Patent Information
- Application Number
- CN202111548152.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-17
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2041-12-17
AI Technical Summary
In complex terrain and remote areas such as plains, mountainous areas, hills, etc., it is difficult for the existing technology to quickly and accurately perform tower foundation pit division and construction measurements, especially when there is no GPS signal or measurement of the impact of convex rocks on the ground.
A multi-functional line tower foundation construction measurement tool is designed, including a horizontal rotatable seat body and an adjustable base, equipped with a length ruler and a horizontal length ruler, by adjusting the length of the adjustable base and support rod, combined with a compass and circle Annular leveling device realizes rapid measurement and positioning of the tower foundation.
The tool can quickly and accurately measure the root opening, foundation pit bottom and elevation of the tower foundation under complex terrain and without GPS signals, simplifying the construction measurement process and reducing operational complexity and cost.
Smart Images

Figure CN114526714B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a multifunctional iron tower foundation measuring tool, specifically a tool for measuring the foundation of a iron tower in a plain, mountainous or hilly area, with four foundation pits at different levels, without complicated calculations. Ordinary construction workers can quickly measure the root opening of the iron tower foundation, the elevation of the bottom of the foundation pit and the top of the foundation, whether the center of the foundation pit is consistent with the line direction and other data, and carry out data monitoring during construction. Background Art
[0002] At present, the division of pits and construction measurements of line tower foundations are generally carried out by technicians using theodolites, levels, total stations and GPS measurements to locate and calculate, and use tape measures to measure specific division pit positioning points and calculate the depth of the pits on site. However, when measuring straight lines during the construction of tower foundations in mountainous areas, the overall rocks affect the measurement, and it is troublesome to clean them up, making it difficult to measure straight line data on the ground; if distance measuring instruments, total stations and GPS are used, due to the large drop of tower foundations in mountainous areas, the verticality of the measuring rod is difficult to control, and the values measured with a slight tilt will have large errors. At the same time, complex calculations are required for angle measurement and conversion, and the equipment and instruments are expensive and the operating procedures are cumbersome.
[0003] The method of arranging positioning piles at the bottom of the foundation pit is generally to first arrange auxiliary positioning piles around the foundation pit, and then arrange positioning piles at the bottom of the foundation pit based on the auxiliary positioning piles during the foundation pit excavation process. The procedure is complicated, and it is easy for workers to make mistakes in data measurement during construction, and the actual data does not match the drawing data, resulting in rework. At the same time, when relevant personnel conduct supervision and acceptance, complex calculations must be performed when the foundation pit is on different levels, making the supervision and acceptance process complicated and slow. Summary of the invention
[0004] The technical problem to be solved by the present invention is to overcome the shortcomings of the prior art, provide a tool for measuring the foundation pits and construction of line towers in plains, mountainous areas, hills, remote areas without GPS signals, four foundation pits at different levels, protruding rocks on the ground affecting the measurement, and provide a measurement method using the measurement tool.
[0005] The technical solution of the present invention is specifically as follows:
[0006] A multifunctional line tower foundation construction measurement tool comprises a horizontally rotatable seat body, which is fixed on an adjustable base, and the height of the adjustable base is determined according to the height of a convex stone within the on-site measurement range; connecting studs are arranged at the 0, 90, 180, and 270 scale positions of the horizontally rotatable seat body, each connecting stud is connected to an extension ruler, and the other end of the extension ruler is connected to a horizontal extension ruler, and after the horizontal extension ruler is rotated to a desired angle, a plumb line is tied to the corresponding scale of the horizontal extension ruler.
[0007] The above-mentioned horizontally rotatable base body includes an inner base plate and a horizontally rotatable base outer plate arranged on the inner base plate, wherein the horizontally rotatable base outer plate rotates on the inner base plate, the horizontally rotatable base outer plate is a circular level, there is a horizontal bubble in the circular level, and angle scale lines are set on the circular ring, and connecting studs are respectively arranged at the 0, 90, 180, and 270 scale positions of the horizontally rotatable base outer plate.
[0008] An angle locking screw is connected to the outer plate of the horizontally rotatable base.
[0009] A compass is also fixed on the inner plate of the base.
[0010] The lower end of each horizontal extension ruler is connected with a support rod, and the support rod is a telescopic rod.
[0011] A multifunctional line tower foundation construction measurement method comprises the following steps:
[0012] Step 1, adjust the telescopic legs of the adjustable base so that the 0, and 90 degree horizontal bubbles on the horizontally rotatable base are in the center position; the height of the telescopic legs of the adjustable base is determined according to the height of the convex stone within the on-site measurement range, so that the center hole of the horizontally rotatable base is aligned with the bottom center pile;
[0013] Step 2: Adjust the length of the support rod so that the horizontal bubble with the horizontal extension ruler is in the center; determine the number of extension rulers according to the drawing size;
[0014] Step 3: First, set the angles of the extension rulers at the four corners at 0, 90, 180, and 270 degrees. The 0-degree position is the center line of the tower, and the locking belt can rotate the seat body horizontally;
[0015] Step 4: According to the size of the drawing, directly connect the ruler at the four corners to read the distance scale and hang the plumb line. Obtain the four contact points between the plumb line and the ground, namely A, B, C, and D, and drive auxiliary positioning stakes respectively;
[0016] Step 5. Loosen the angle of the horizontal rotatable seat, and have four people rotate the four extension rulers and the horizontal rotatable seat 45 degrees through the angle scale line at the same time; if two people are working, all the extension rulers can be removed, and the horizontal rotatable seat can be rotated 45 degrees through the angle scale line, and repeat step 2; the extension ruler angle is set at 45, 135, 225, and 315 degrees, and the 0 degree position is the center line of the tower;
[0017] Step 6: According to the size of the drawing, directly connect the ruler to the four corners to read the distance scale and hang the plumb line. The four contact points between the plumb line and the ground, namely E, F, G, and H, are obtained. These four points are the center points of the foundation pit, and the positioning piles are driven in;
[0018] Step 7: Draw the four sides of each foundation pit according to the drawings;
[0019] Step 8: Measure the distance from the ground to the extension scale of each foundation pit and the distance from the ground to the extension scale of the center pile. The required excavation depth of each foundation pit can be calculated based on the drawings.
[0020] Step 9: During the foundation pit excavation process, the plumb line can be used in step 6 to monitor the verticality of the foundation pit excavation. After the foundation pit is excavated, the center of the bottom of the foundation pit is found by the plumb line, positioning piles are driven in, and foundation construction is carried out.
[0021] The beneficial effects of the present invention are:
[0022] 1. The present invention determines the number of extended rulers according to the actual situation on site, and finds the foundation pit positioning point through the wire pendant. The method is direct and simple.
[0023] 2. After finding the positioning point, you can directly measure the distance from the bottom of the pit to the extended ruler, and you can easily calculate the depth of the pit.
[0024] 3. By using the compass and the scale on the outer disk of the horizontally rotatable base, it can be calculated whether the axis of the tower is consistent with the angle of the entry and exit lines.
[0025] 4. It is suitable for data measurement during tower foundation construction and acceptance in plains, mountainous areas, hills, remote areas without GPS signals and most specifications and grades of lines.
[0026] 5. The present invention has a simple structure, is easy to operate, measures data intuitively and simply, does not require complex calculations, and is low cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 This is a front view of the multifunctional line tower foundation construction measurement tool of the present invention;
[0028] Figure 2 for Figure 1 A top view of
[0029] Figure 3 for Figure 1 A magnified image of the 0 region in the figure;
[0030] Figure 4 Schematic diagram of the process for determining the positioning pile;
[0031] Figure 5 Schematic diagram of the process for determining the center point of the foundation pit. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0034] like Figure 1 As shown, a multifunctional line tower foundation construction measurement tool includes a horizontally rotatable seat body 1, which is composed of a horizontally rotatable base outer disk 9, a base inner disk 10, a compass 8, and a connecting stud 11. The horizontally rotatable seat body 1 is fixed on an adjustable base 4 by a base fixing screw 12. The adjustable base 4 is composed of three telescopic legs to form a tripod. The telescopic legs of the adjustable base 4 are adjusted to achieve that the 0 and 90 degree horizontal bubbles on the horizontally rotatable seat body 1 are in the center position. The height of the telescopic legs of the adjustable base 4 is determined according to the height of the convex stone within the on-site measurement range.
[0035] The above-mentioned horizontally rotatable base body 1 comprises a base inner plate 10, a horizontally rotatable base outer plate 9 and a compass 8 arranged on the base inner plate, wherein the compass 8 is fixed on the base inner plate 10, the horizontally rotatable base outer plate 9 can rotate on the base inner plate 10, the horizontally rotatable base outer plate 9 is a circular level, a horizontal bubble 14 is arranged in the circular level, and angle scale lines are arranged on the circular ring, and the rotation angle can be read through the angle scale lines on the horizontally rotatable base outer plate 9. The connecting studs 11 are arranged at the 0, 90, 180, and 270 scale positions of the horizontally rotatable base outer plate 9, respectively, and the horizontally rotatable base outer plate 9 is locked with the angle locking screws 13 after the angle is adjusted.
[0036] Each connecting stud 11 is connected to the extension ruler 2, and the other end of the extension ruler 2 is connected to the belt horizontal extension ruler 3. The extension ruler 2 and the belt horizontal extension ruler 3 are screwed together without gaps, and the lower end of each belt horizontal extension ruler 3 is connected to the support rod 6, and the support rod 6 is a telescopic rod. It should be noted that the extension ruler 2 and the belt horizontal extension ruler 3 are marked with distance scales; the above-mentioned belt horizontal extension ruler 3 is equipped with a spirit level, and the horizontal bubble of the belt horizontal extension ruler 3 is in the center position by adjusting the length of the support rod 6. The number of roots of the extension ruler 2 is determined by the size of the drawing. Under normal circumstances, four sets of extension rulers are used. If there is a mountain obstruction, only one set of extension rulers can be used, and they can be rotated 0, 90, 180, and 270 degrees for measurement.
[0037] According to the dimensions on the drawing, rotate the horizontal extension ruler 3 to a desired angle, tie a plumb line 5 on the corresponding scale of the horizontal extension ruler 3, and find the position of the positioning pile.
[0038] The measuring method of the present invention is:
[0039] Step 1, adjust the telescopic legs of the adjustable base 4 so that the 0, and 90 degree horizontal bubbles 14 on the horizontally rotatable base 1 are in the center position; the height of the telescopic legs of the adjustable base 4 is determined according to the height of the convex stone within the on-site measurement range, so that the center hole of the horizontally rotatable base 1 is aligned with the bottom center pile.
[0040] Step 2: Adjust the length of the support rod 6 so that the horizontal bubble with the horizontal extension ruler 3 is in the center; determine the number of extension rulers 2 according to the drawing size; normally use four sets of extension rulers, but if there is a mountain obstruction, only use one set of extension rulers, and rotate them 0, 90, 180, and 270 degrees for measurement.
[0041] Step 3: First, set the angles of the extension rulers 2 at the four corners at 0, 90, 180, and 270 degrees. The 0 degree position is the center line of the tower. After adjusting the angle, lock it with the angle locking screw 13.
[0042] Step 4: According to the size of the drawing, directly connect the ruler to the four corners to read the distance scale and hang the pendant 5, such as Figure 1 , Figure 4 As shown, the four contact points between the plumb line and the ground, namely A, B, C, and D, are obtained, and auxiliary positioning piles are driven in respectively.
[0043] Step 5, loosen the angle locking screw 13, and have four people simultaneously rotate the four extension rulers 2 and the horizontal rotatable seat 1 by 45 degrees through the angle scale line. If two people are working, you can also remove all the extension rulers 2, rotate the horizontal rotatable seat 1 by 45 degrees through the angle scale line, and repeat step 2. The angle of the extension ruler 2 is set at 45, 135, 225, and 315 degrees, and the 0 degree position is the center line of the tower. Lock the angle locking screw 13, as shown in the figure below. Figure 4 shown.
[0044] Step 6: According to the size of the drawing, directly connect the ruler 2 at the four corners to read the distance scale (the distance between the center pile and the center of the foundation pit) and hang the plumb line 5, such as Figure 5 As shown, four contact points between the plumb bob 5 and the ground, namely, points E, F, G, and H, are obtained. These four points are the center points of the foundation pit, and positioning piles are driven in.
[0045] Step 7: Draw the four sides of each foundation pit according to the drawing.
[0046] Step 8. Measure the distance from the ground of each foundation pit to the extension ruler 2 and the distance from the ground of the center pile to the extension ruler 2. The required digging depth of each foundation pit can be calculated based on the drawings.
[0047] Step 9: During the excavation of the foundation pit, the plumb line can be used in step 6 to monitor the verticality of the foundation pit excavation and ensure the construction quality. After the foundation pit is excavated, the plumb line 5 is used to find the center of the bottom of the foundation pit, and positioning piles are driven to carry out foundation construction.
[0048] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is limited by the attached claims rather than the above description. Therefore, it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention, and any figure marks in the claims should not be regarded as limiting the claims involved.
[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A multifunctional line tower foundation construction measurement tool, characterized by: The invention comprises a horizontally rotatable seat body (1), the horizontally rotatable seat body (1) is fixed on an adjustable base (4), the height of the adjustable base (4) is determined according to the height of the convex stone within the on-site measurement range; connecting studs (11) are arranged at the 0, 90, 180, and 270 scale positions of the horizontally rotatable seat body (1), each connecting stud (11) is connected to the extension scale (2), the other end of the extension scale (2) is connected to the horizontal extension scale (3), after the horizontal extension scale (3) is rotated to a desired angle, a pendant (5) is tied to the corresponding scale of the horizontal extension scale (3); Here are the steps: Step 1, adjust the telescopic legs of the adjustable base (4) so that the 0, and 90 degree horizontal bubbles on the horizontally rotatable base (1) are in the center position; the height of the telescopic legs of the adjustable base (4) is determined according to the height of the convex stone within the on-site measurement range so that the center hole of the horizontally rotatable base (1) is aligned with the bottom center pile; Step 2, by adjusting the length of the support rod (6), the horizontal bubble with the horizontal extension ruler (3) is in the center position; the number of the extension rulers (2) is determined according to the size of the drawing; Step 3: First, set the angles of the extension rulers (2) at the four corners at 0, 90, 180, and 270 degrees, with the 0 degree position being the center line of the tower, and the locking belt can horizontally rotate the seat body (1) at an angle; Step 4: According to the size of the drawing, directly connect the ruler at the four corners to read the distance scale and hang the plumb line (5), and respectively obtain the four contact points between the plumb line and the ground, namely A, B, C, and D, four auxiliary positioning stakes, and respectively drive in auxiliary positioning stakes; Step 5, the angle of the belt horizontal rotatable seat (1) is loosened, and four people simultaneously rotate the four extension rulers (2) and the belt horizontal rotatable seat (1) by 45 degrees through the angle scale line; if two people are operating, the extension rulers (2) can also be completely removed, and the belt horizontal rotatable seat (1) can be rotated by 45 degrees through the angle scale line, and step 2 is repeated; the angle of the extension ruler (2) is set at 45, 135, 225, and 315 degrees, and the 0 degree position is the center line of the tower; Step 6: According to the size of the drawing, directly connect the ruler (2) at the four corners to read the distance scale plumb bob (5), and respectively obtain the four contact points between the plumb bob (5) and the ground, namely, points E, F, G, and H. These four points are the center points of the foundation pit, and the positioning piles are driven in; Step 7: Draw the four sides of each foundation pit according to the drawings; Step 8: Measure the distance from the ground of each foundation pit to the extension scale (2) and the distance from the ground of the center pile to the extension scale (2). The required excavation depth of each foundation pit can be calculated based on the drawings. Step 9: During the excavation of the foundation pit, the verticality of the foundation pit can be monitored by using the plumb line in step 6. After the foundation pit is excavated, the center of the bottom of the foundation pit is found by using the plumb line (5), and positioning piles are driven to carry out foundation construction.
2. The multifunctional line tower foundation construction measurement tool according to claim 1 is characterized in that: The horizontally rotatable base body (1) comprises a base inner plate (10) and a horizontally rotatable base outer plate (9) arranged on the base inner plate, wherein the horizontally rotatable base outer plate (9) rotates on the base inner plate (10), the horizontally rotatable base outer plate (9) is a circular level, a horizontal bubble (14) is arranged in the circular level, and angle scale lines are arranged on the circular ring, and connecting studs (11) are arranged at the 0, 90, 180, and 270 scale positions of the horizontally rotatable base outer plate (9), respectively.
3. The multifunctional line tower foundation construction measurement tool according to claim 2 is characterized in that: An angle locking screw (13) is connected to the horizontally rotatable base outer plate (9).
4. The multifunctional line tower foundation construction measurement tool according to claim 2 is characterized in that: A compass (8) is also fixed on the base inner plate (10).
5. The multifunctional line tower foundation construction measurement tool according to claim 1 is characterized in that: The lower end of each horizontal extension ruler (3) is connected to a support rod (6), and the support rod (6) is a telescopic rod.
6. A multifunctional line tower foundation construction measurement method using the measurement tool according to claim 1, characterized in that: The steps include: Step 1, adjust the telescopic legs of the adjustable base (4) so that the 0, and 90 degree horizontal bubbles on the horizontally rotatable base (1) are in the center position; the height of the telescopic legs of the adjustable base (4) is determined according to the height of the convex stone within the on-site measurement range so that the center hole of the horizontally rotatable base (1) is aligned with the bottom center pile; Step 2, by adjusting the length of the support rod (6), the horizontal bubble with the horizontal extension ruler (3) is in the center position; the number of the extension rulers (2) is determined according to the size of the drawing; Step 3: First, set the angles of the extension rulers (2) at the four corners at 0, 90, 180, and 270 degrees, with the 0 degree position being the center line of the tower, and the locking belt can horizontally rotate the seat body (1) at an angle; Step 4: According to the size of the drawing, directly connect the ruler at the four corners to read the distance scale and hang the plumb line (5), and respectively obtain the four contact points between the plumb line and the ground, namely A, B, C, and D, four auxiliary positioning stakes, and respectively drive in auxiliary positioning stakes; Step 5, the angle of the belt horizontal rotatable seat (1) is loosened, and four people simultaneously rotate the four extension rulers (2) and the belt horizontal rotatable seat (1) by 45 degrees through the angle scale line; if two people are operating, the extension rulers (2) can also be completely removed, and the belt horizontal rotatable seat (1) can be rotated by 45 degrees through the angle scale line, and step 2 is repeated; the angle of the extension ruler (2) is set at 45, 135, 225, and 315 degrees, and the 0 degree position is the center line of the tower; Step 6: According to the size of the drawing, directly connect the ruler (2) at the four corners to read the distance scale plumb bob (5), and respectively obtain the four contact points between the plumb bob (5) and the ground, namely, points E, F, G, and H. These four points are the center points of the foundation pit, and the positioning piles are driven in; Step 7: Draw the four sides of each foundation pit according to the drawings; Step 8: Measure the distance from the ground of each foundation pit to the extension scale (2) and the distance from the ground of the center pile to the extension scale (2). The required excavation depth of each foundation pit can be calculated based on the drawings. Step 9: During the excavation of the foundation pit, the verticality of the foundation pit can be monitored by using the plumb line in step 6. After the foundation pit is excavated, the center of the bottom of the foundation pit is found by using the plumb line (5), and positioning piles are driven to carry out foundation construction.
Citation Information
Patent Citations
Transmission line tangent tower footing rapid pit separating instrument
CN212133664U
Groove excavation size detector
CN212721216U