Intelligent concrete slurry pouring construction method and system based on cast-in-place piles
Through the control of the concrete boundary line and the pure concrete boundary line, combined with X-ray detectors and sensors, precise conduit movement and real-time pressure control during cast-in-place pile construction are realized, solving the problems of mud interlayer and improper pressure control, and improving efficiency. Strength and construction safety of cast-in-place piles.
Patent Information
- Application Number
- CN202410959630.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-07-17
AI Technical Summary
During the construction of cast-in-place piles, it is difficult to accurately control the lifting stroke of the concrete pouring conduit, resulting in mud interlayering and untimely control of grouting pressure, which affects the strength of the pile and construction safety.
The concrete dividing line and pure concrete dividing line are used to control the movement of the concrete pouring pipe. Through automated intermittent lifting and real-time regulation of the pouring pressure, X-ray detectors and sensors are used to achieve precise control and pressure adjustment of the concrete pouring pipe.
It completely solves the mud inclusion phenomenon, improves the strength and compactness of cast-in-place piles, reduces the risk of honeycombs and cavities, and achieves precise control of grouting pressure.
Smart Images

Figure CN118516993B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cast-in-place pile construction and computer image processing, in particular to an intelligent concrete slurry pouring construction method and system based on cast-in-place piles. Background Art
[0002] Bored piles are made by drilling holes directly on the pile position at the construction site, then placing a steel cage and pouring concrete. The construction process of bored piles is: leveling the site → preparing mud → burying casing → laying the working platform → installing machinery and equipment and positioning → punching holes → cleaning holes and checking the quality of holes → lowering the steel cage → pouring concrete → pulling out casing → checking quality.
[0003] The concrete pouring process of the prior art has the following construction characteristics: First, it is strictly forbidden to lift the concrete pouring conduit above the concrete pouring surface, and the conduit should be buried no less than 1.0m below the concrete pouring surface at one time. This is to prevent the mud on the concrete pouring surface from being covered by concrete, so that a mud interlayer is formed in the concrete body. However, in the actual construction process, the lifting of the concrete pouring conduit is not effectively controlled, and the mud interlayer phenomenon occurs from time to time. Therefore, how to effectively and accurately control the lifting stroke of the concrete pouring conduit is a problem that needs to be solved at present; Second, it has been found through research that the mud is not only in the area above the concrete pouring surface, but also in the area between the concrete pouring surface and about 1 meter below the concrete pouring surface. It is a mixed area of mud and concrete, with a large mud content, which has a certain influence on the strength of the pile body, and even in this mixed area, there is a mud interlayer. The shape is not taken into consideration in actual construction. Even if the concrete pouring pipe is not lifted above the concrete pouring surface, mud inclusion cannot be avoided. Third, in the concrete pouring process, the grouting pressure of the pouring pump is determined entirely according to work experience, and the grouting pressure is not adjusted in real time according to the actual working conditions. Therefore, the actual grouting pressure is either large or small. If it is too small, it will affect the bearing capacity of the pile body. If it is too large, it will cause energy waste and even safety hazards in construction, such as pipe jamming. Fourth, in order to solve the problem of honeycomb and voids in the pile body, during the grouting process, the concrete pouring pipe must be moved up and down repeatedly to compact the concrete. The purpose is to increase the density of the pile body. However, this construction method greatly increases the number of movements of the concrete pouring pipe, which is the main reason for the occurrence of mud inclusion. Summary of the invention
[0004] In order to solve the above problems, the purpose of the present invention is to provide an intelligent concrete slurry pouring construction method and system based on cast-in-place piles. The present invention uses the concrete slurry dividing line and the mixed and pure concrete dividing line to control the movement of the concrete pouring pipe, so that the lower end of the concrete pouring pipe does not cross the mixed and pure concrete dividing line during the upward movement of the concrete pouring pipe, and realizes automatic and precise control of the movement of the concrete pouring pipe, which completely solves the mud-entrapment phenomenon of the cast-in-place pile.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0006] An intelligent concrete slurry pouring construction method based on cast-in-place piles comprises the following steps:
[0007] S1. Inject static pressure mud and lower the pipe: inject static pressure mud into the pile hole, lower the concrete pouring pipe into the pile hole and place it in the center of the pile hole, and keep a distance of 30mm-60mm between the lower end of the concrete pouring pipe and the bottom of the pile hole;
[0008] S2. Pouring concrete slurry: Start the concrete pouring pump, and the concrete slurry enters the bottom of the pile hole through the concrete pouring pipe. The concrete slurry gradually pushes the static pressure mud upward in the pile hole from the bottom of the pile hole. The columnar structure formed by the concrete slurry in the pile hole is called the concrete body. The concrete body gradually pushes the static pressure mud in the pile hole upward to the outside of the pile hole;
[0009] S3, automatically and intermittently lift the concrete pouring pipe so that the lower end of the concrete pouring pipe does not cross the boundary line between pure concrete and impure concrete during the upward movement of the concrete pouring pipe;
[0010] S4. Real-time regulation of pouring pressure: When the concrete pouring pipe is not moving, the speed of the concrete pouring pump is regulated to regulate the pouring pressure in real time;
[0011] S5. Forming cast-in-place piles: When the concrete slurry on the boundary line of pure concrete is discharged out of the pile hole, the pouring process of the concrete slurry is completed, and the cast-in-place piles are formed after the concrete solidifies.
[0012] Further, in step S3, the specific method is as follows: as the concrete slurry is continuously poured into the pile hole, the concrete slurry boundary line and the pure concrete boundary line in the pile hole gradually move upward, and when the upper concrete slurry boundary line sensor detects the concrete slurry boundary line, the pipe pulling drive device is started, and the concrete pouring pipe starts to move upward, and the upward movement speed is greater than the upward movement speed of the concrete slurry boundary line; when the lower concrete slurry boundary line sensor detects the concrete slurry boundary line, the pipe pulling drive device is turned off, the concrete pouring pipe stops moving upward, and the distance between the upper concrete slurry boundary line sensor and the lower concrete slurry boundary line sensor is not greater than the distance between the concrete slurry boundary line and the pure concrete boundary line.
[0013] Furthermore, in step S4, the method for regulating the speed of the concrete pouring pump is as follows:
[0014] S41. During the concrete slurry pouring process, an X-ray detector is used to obtain a concrete body detection image in real time;
[0015] S42, identifying an aggregate image in the detection image;
[0016] S43, calculating the aggregate density of the concrete body, and adjusting the rotation speed of the concrete pouring pump according to the aggregate density of the concrete body, so as to adjust the pouring pressure in real time.
[0017] Furthermore, in step S41, when the lower concrete slurry boundary line sensor detects the concrete slurry boundary line, the X-ray detector is started; when the upper concrete slurry boundary line sensor detects the concrete slurry boundary line, the X-ray detector is turned off.
[0018] Furthermore, in the step S42, the method for identifying the aggregate image in the detection image is as follows: grayscale and binarization are performed on the image, and then edge detection is performed on the grayscale image through an edge detection operator. The edge curve obtained by the edge detection divides the image into multiple sub-area images, and the sub-area images are the aggregate images in the detection image.
[0019] Furthermore, in step S43, the method for real-time regulating the perfusion pressure is as follows:
[0020] Step S4301: Create an acquired sub-area image set G = {G1, G2, G3, ...G j , …G n}, n is the number of sub-region images in the sub-region image set, set the variable j, and initialize the value of j to 1, G j is the j-th sub-region image in G;
[0021] Step S4302: Create sub-area image G j The set of pixel coordinates on the edge line P = {P1 (X1, Y1), P2 (X2, Y2), P3 (X3, Y3), ... P i (X i ,Y i ), …P m (X m ,Y m )}, m is G j The number of pixel coordinates on the edge line, set the variable i, initialize the value of i to 1, P i (X i ,Y i ) is the coordinate of the i-th pixel in the set P;
[0022] Step S4303: Using the sub-area image Gj The center point or center of gravity in is ZX, and the sub-area image G is calculated. j The pixel point P on the edge line i (X i ,Y i ) to ZX i ; The Euclidean distance D i Add to the Euclidean distance set DP﹤D i ﹥Medium;
[0023] Step S4304, increase the value of variable i by 1, if i≤m, jump to step S4303, otherwise jump to step S4305;
[0024] Step S4305: In the sub-area image G j In the calculation, the Euclidean distance set DP﹤D i ﹥The arithmetic mean of the Euclidean distance D AVG ;
[0025] Step S4306: Using the sub-area image G j The center point or center of gravity ZX is the center of the circle, and the arithmetic mean value D of the Euclidean distance is AVG is the radius, calculate the sub-area image G j The area S j ;
[0026] Step S4307: Sub-area image G j The area S j Add to the sub-area image area set SP﹤S j ﹥Medium;
[0027] Step S4308, increase the value of variable j by 1, if j≤n, jump to step S4302, otherwise jump to step S4309;
[0028] Step S4309: Calculate the sub-area image area set SP﹤S j The sum of the elements in ﹥ is used to obtain the total area of the sub-region image ΣS j ;
[0029] Step S4310: Calculate the aggregate density C of the concrete body, C=ΣS j / S zq , where S zq is the area of the concrete body detection area;
[0030] Step S4311: Set the reference threshold interval C of the aggregate density of the concrete body B (a,b); when C>b, jump to step S4314; when C<a, jump to step S4313; when C≥a, and C≤b, jump to step S4312;
[0031] Step S4312: maintaining the current speed of the concrete pouring pump to maintain the concrete pouring pressure within the range of 14.5-17.5 MPa;
[0032] Step S4313, increasing the speed of the current concrete pouring pump to increase the concrete pouring pressure, so that the concrete pouring pressure is maintained within the range of 17.5-21.5MPa;
[0033] Step S4314: reduce the current rotation speed of the concrete pouring pump to reduce the concrete pouring pressure so that the concrete pouring pressure is maintained within the range of 10.5-14.5 MPa.
[0034] Furthermore, the edge detection operator used is a Roberts Cross operator, a Prewitt operator, a Sobel operator, a Canny operator or a compass operator.
[0035] Furthermore, the aggregate refers to the machine-made sand with a particle size of 2-4 mm that is mixed and added into the concrete slurry.
[0036] Furthermore, the concrete pouring pipe includes an inner pipe and an outer pipe installed concentrically, and an annulus is formed between the inner pipe and the outer pipe. The inner pipe is used to transport concrete slurry. An upper concrete slurry boundary line sensor is provided in the annulus at a position N centimeters away from the lower port of the concrete pouring pipe, and a lower concrete slurry boundary line sensor is provided in the annulus at a position M centimeters away from the lower port of the concrete pouring pipe. N is a reference design distance value from the concrete slurry boundary line to the lower port of the concrete pouring pipe, and M is a reference design distance value from the pure concrete boundary line to the lower port of the concrete pouring pipe. The relationship between N and M is: N=M+h, N≥2h, wherein h is the length of the concrete body section mixed with slurry, and h=120cm.
[0037] Furthermore, the X-ray detector is arranged in the annulus and close to the lower port of the concrete pouring pipe.
[0038] An intelligent concrete slurry pouring construction system based on cast-in-place piles, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program and runs in the following system units:
[0039] An image acquisition unit, used for acquiring image data information of the concrete body;
[0040] An aggregate image search and identification unit, used for searching and identifying an aggregate image in an image;
[0041] A data calculation unit is used to calculate the aggregate density of the concrete body;
[0042] The pouring pump control and pouring pipe movement control unit controls the speed of the concrete pouring pump according to the aggregate density of the concrete body; and starts and shuts down the pipe pulling drive device according to the concrete slurry boundary line information detected by the upper concrete slurry boundary line sensor and the lower concrete slurry boundary line sensor, and performs intelligent lifting control on the concrete pouring pipe.
[0043] The beneficial effects of the present invention are:
[0044] 1. The present invention utilizes the static pressure mud in the pile hole to protect the pile hole wall and prevent the pile hole wall from collapsing. At the same time, the static pressure mud in the pile hole can also load downward pressure on the concrete body to improve the density of the concrete body. The present invention replaces the prior art of repeatedly moving the concrete pouring pipe up and down to pound the material, thereby greatly reducing the number of times the concrete pouring pipe moves, reducing the risk of mud inclusion, and effectively avoiding the occurrence of honeycombs and cavities in the concrete body, thereby improving the strength of the cast-in-place pile.
[0045] 2. The present invention utilizes the concrete slurry dividing line and the mixed and pure concrete dividing line to control the movement of the concrete pouring pipe, so that during the upward movement of the concrete pouring pipe, the lower end of the concrete pouring pipe does not cross the mixed and pure concrete dividing line, thereby realizing automatic and precise control of the movement of the concrete pouring pipe and completely solving the mud-entrapment phenomenon of the cast-in-place pile.
[0046] 3. The present invention can control the rotation speed of the concrete injection pump in real time during the grouting process according to the actual working condition of the concrete body in the pile hole, and adjust the grouting pressure within the required range. In particular, it adopts computer image processing technology and algorithms to characterize the actual working condition of the concrete body in the pile hole through the density of concrete aggregate, thereby realizing precise control of the injection pump. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 It is a flow chart of the grouting construction of the present invention;
[0048] Figure 2 It is a state diagram of the grouting construction of the present invention;
[0049] Figure 3 for Figure 2 The structural schematic diagram of the concrete pouring pipe shown;
[0050] Figure 4 This is a flow chart of the present invention for real-time regulation of perfusion pressure;
[0051] Figure 5 It is a structural block diagram of the system of the present invention. DETAILED DESCRIPTION
[0052] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.
[0053] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper surface", "lower surface", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "forward", "reverse", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0054] like Figure 1 , 2 As shown, an intelligent concrete slurry pouring construction method based on cast-in-place piles comprises the following steps:
[0055] S1. Inject static mud and lower the pipe: Inject static mud into the pile hole, lower the concrete pouring pipe into the pile hole and place it in the center of the pile hole, and keep a distance of 30mm-60mm between the lower end of the concrete pouring pipe and the bottom of the pile hole. The distance between the lower end of the concrete pouring pipe and the bottom of the pile hole cannot be too large, otherwise the static mud will be retained in the pile hole, thus affecting the quality of the pile body; this distance cannot be too small, otherwise it will affect the injection of concrete slurry.
[0056] The method of injecting static pressure mud into the pile hole is: in the process of cleaning the pile hole, the old mud in the pile hole is replaced with new mud, and the sediment at the bottom of the pile hole is taken away by the mud. After the pile hole is cleaned, the new mud is retained in the pile hole. At this time, the new mud in the pile hole is static pressure mud. This construction not only saves the time of injecting static pressure mud, but also saves the time of pumping out the new mud after the pile hole cleaning process is completed, thereby improving construction efficiency.
[0057] S2, pouring concrete slurry: start the concrete pouring pump, the concrete slurry enters the bottom 2 of the pile hole through the concrete pouring pipe 1, the concrete slurry gradually pushes the static pressure mud to move up in the pile hole 3 from the bottom 2 of the pile hole, and the columnar structure formed by the concrete slurry in the pile hole 3 is called the concrete body 4; as the concrete slurry is continuously poured into the pile hole, the concrete slurry boundary line 5 in the pile hole gradually moves upward, and the concrete body gradually pushes the static pressure mud 6 in the pile hole 3 upward to the outside of the pile hole. The concrete slurry boundary line 5 is the boundary line between the concrete body 4 and the static pressure mud 6 in the pile hole.
[0058] The concrete body includes a mixed concrete body section and a pure concrete body section. The mixed concrete body section has mud inclusions, which is called the mixed concrete body section. The boundary line between the mixed concrete body section and the pure concrete body section is called the mixed-pure concrete boundary line 7.
[0059] The present invention injects static pressure mud into the pile hole. During the process of pouring concrete slurry, the static pressure mud in the pile hole is used to protect the pile hole wall. At the same time, the static pressure mud in the pile hole applies downward pressure to the concrete body, which can improve the density of the concrete body and effectively avoid the occurrence of honeycombs and cavities in the concrete body, thereby improving the strength of the cast-in-place pile. The present invention no longer uses the method of repeatedly moving the concrete pouring pipe up and down, thereby greatly reducing the number of times the concrete pouring pipe moves, thereby reducing the risk of mud inclusion.
[0060] S3. Automatically intermittently lift the concrete pouring pipe so that the lower end of the concrete pouring pipe does not cross the boundary line between pure concrete and impure concrete during the upward movement of the concrete pouring pipe.
[0061] As concrete slurry is continuously poured into the pile hole, the concrete slurry dividing line and the mixed and pure concrete dividing line in the pile hole gradually move upward. When the upper concrete slurry dividing line sensor detects the concrete slurry dividing line, the pipe pulling drive device is started, and the concrete pouring pipe starts to move upward, and the upward movement speed is greater than the upward movement speed of the concrete slurry dividing line; when the lower concrete slurry dividing line sensor detects the concrete slurry dividing line, the pipe pulling drive device is closed, and the concrete pouring pipe stops moving upward. The distance between the upper concrete slurry dividing line sensor and the lower concrete slurry dividing line sensor is not greater than the distance between the concrete slurry dividing line and the mixed and pure concrete dividing line, so that the lower end of the concrete pouring pipe does not cross the mixed and pure concrete dividing line during the upward movement of the concrete pouring pipe.
[0062] The invention automatically and accurately controls the movement of the concrete pouring pipe to solve the mud-entrapment phenomenon of the cast-in-place pile.
[0063] like Figure 3 As shown, the concrete pouring pipe comprises an inner pipe 9 and an outer pipe 10 which are installed concentrically, and an annulus 11 is formed between the inner pipe and the outer pipe. The inner pipe 9 is used to transport concrete slurry. An upper concrete slurry boundary line sensor 12 is provided in the annulus 11 and at a position N cm away from the lower port 8 of the concrete pouring pipe. A lower concrete slurry boundary line sensor 13 is provided in the annulus and at a position M cm away from the lower port 8 of the concrete pouring pipe. N is a reference design distance value from the concrete slurry boundary line 5 to the lower port 8 of the concrete pouring pipe, and M is a reference design distance value from the pure concrete boundary line 7 to the lower port 8 of the concrete pouring pipe. The relationship between N and M is: N=M+h, N≥2h, wherein h is the length of the concrete body section mixed with slurry, and h=120cm. An X-ray detector 14 is provided in the annulus 11 and close to the lower port 8 of the concrete pouring pipe.
[0064] In this embodiment, the upper concrete slurry boundary line sensor 12 and the lower concrete slurry boundary line sensor 13 are both capacitive liquid level sensors.
[0065] Research has found that the length of the mixed concrete section of the concrete body is usually 120cm, and the section below 120cm is the pure concrete section. The dividing line between the two sections is the mixed-pure concrete dividing line. During the upward movement of the concrete pouring pipe, it cannot cross the mixed-pure concrete dividing line. If it crosses the mixed-pure concrete dividing line, the mud mixed in the mixed concrete section will be retained in the cast-in-place pile.
[0066] S4. Real-time regulation of pouring pressure: When the concrete pouring pipe is not moving, the speed of the concrete pouring pump is regulated to regulate the pouring pressure in real time. The specific method is as follows: Figure 4 As shown:
[0067] S41. During the concrete slurry pouring process, an X-ray detector is used to obtain a concrete body inspection image in real time.
[0068] When the lower concrete slurry boundary line sensor detects the concrete slurry boundary line, the X-ray detector is activated; when the upper concrete slurry boundary line sensor detects the concrete slurry boundary line, the X-ray detector is turned off. The X-ray detector starts scanning when the concrete pouring pipe is not moving. As the concrete slurry is continuously poured into the pile hole, the concrete slurry in the pile hole keeps moving upward, and the moving concrete slurry is scanned to obtain the detection image.
[0069] S42, identify the aggregate image in the detection image. The specific method is as follows: grayscale and binarization are performed on the image, and then edge detection is performed on the grayscale image by an edge detection operator. The edge curve obtained by edge detection divides the image into multiple sub-area images, and the sub-area images are the aggregate images in the detection image. The edge detection operator can use Roberts Cross operator, Prewitt operator, Sobel operator, Canny operator or compass operator, and these operators are all based on search methods for edge detection. Of course, in addition to the above-mentioned edge detection operator, the Marr-Hildreth edge detection algorithm based on the zero crossing method can also be used.
[0070] The aggregate refers to the machine-made sand with a particle size of 2-4 mm that is mixed and added to the concrete slurry.
[0071] S43, calculating the aggregate density of the concrete body, and adjusting the rotation speed of the concrete pouring pump according to the aggregate density of the concrete body, so as to adjust the pouring pressure in real time.
[0072] The method for real-time regulation of perfusion pressure is as follows:
[0073] Step S4301: Create an acquired sub-area image set G = {G1, G2, G3, ...G j , …G n}, n is the number of sub-region images in the sub-region image set, set the variable j, and initialize the value of j to 1, G j is the j-th sub-region image in G.
[0074] Step S4302: Create sub-area image G j The set of pixel coordinates on the edge line P = {P1 (X1, Y1), P2 (X2, Y2), P3 (X3, Y3), ... P i (X i ,Y i ), …P m (X m ,Y m )}, m is G j The number of pixel coordinates on the edge line, set the variable i, initialize the value of i to 1, P i (X i ,Y i ) is the coordinate of the i-th pixel in the set P.
[0075] Step S4303: Using the sub-area image G j The center point or center of gravity in is ZX, and the sub-area image G is calculated. j The pixel point P on the edge line i (X i ,Y i ) to ZX i ; The Euclidean distance D i Add to the Euclidean distance set DP﹤D i ﹥In.
[0076] Step S4304, increase the value of variable i by 1. If i≤m, jump to step S4303, otherwise jump to step S4305.
[0077] Step S4305: In the sub-area image G j In the calculation, the Euclidean distance set DP﹤D i ﹥The arithmetic mean of the Euclidean distance D AVG .
[0078] Step S4306: Using the sub-area image G j The center point or center of gravity ZX is the center of the circle, and the arithmetic mean value D of the Euclidean distance is AVG is the radius, calculate the sub-area image G j The area S j .
[0079] Step S4307: Sub-area image G jThe area S j Add to the sub-area image area set SP﹤S j ﹥In.
[0080] Step S4308, increase the value of variable j by 1. If j≤n, jump to step S4302, otherwise jump to step S4309.
[0081] Step S4309: Calculate the sub-area image area set SP﹤S j The sum of the elements in ﹥ is used to obtain the total area of the sub-region image ΣS j .
[0082] Step S4310: Calculate the aggregate density C of the concrete body, C=ΣS j / S zq , where S zq It is the area of the concrete body inspection zone.
[0083] Step S4311: Set the reference threshold interval C of the aggregate density of the concrete body B (a,b); when C﹥b, jump to step S4314; when C﹤a, jump to step S4313; when C≥a and C≤b, jump to step S4312.
[0084] Step S4312: Maintain the current rotation speed of the concrete pouring pump to maintain the concrete pouring pressure within the range of 14.5-17.5 MPa.
[0085] Step S4313: Increase the rotation speed of the current concrete pouring pump to increase the concrete pouring pressure so that the concrete pouring pressure is maintained within the range of 17.5-21.5 MPa.
[0086] Step S4314: reduce the current rotation speed of the concrete pouring pump to reduce the concrete pouring pressure so that the concrete pouring pressure is maintained within the range of 10.5-14.5 MPa.
[0087] The present invention adopts the above-mentioned computer image processing technology and algorithm, and characterizes the actual working condition of the concrete body in the pile hole through the density of concrete aggregate. During the grouting process, the rotation speed of the concrete pouring pump can be controlled in real time according to the actual working condition of the concrete body in the pile hole, and the grouting pressure can be adjusted within the required range.
[0088] S5. Forming cast-in-place piles: When the concrete slurry on the boundary line of pure concrete is discharged out of the pile hole, the pouring process of the concrete slurry is completed, and the cast-in-place piles are formed after the concrete solidifies.
[0089] In order to prevent mud from being trapped in the bored piles, the boundary line between pure concrete and impure concrete is used as the pile top line, and the cement slurry above the boundary line of pure concrete needs to be discharged out of the pile hole.
[0090] like Figure 5 As shown, an intelligent concrete slurry pouring construction system based on cast-in-place piles includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program and runs in the following system units:
[0091] An image acquisition unit, used for acquiring image data information of the concrete body;
[0092] An aggregate image search and identification unit, used for searching and identifying an aggregate image in an image;
[0093] Data calculation unit, used to calculate the aggregate gap of concrete body;
[0094] The pouring pump control and pouring pipe movement control unit controls the speed of the concrete pouring pump according to the aggregate density of the concrete body; and starts and shuts down the pipe pulling drive device according to the concrete slurry boundary line information detected by the upper concrete slurry boundary line sensor and the lower concrete slurry boundary line sensor, and performs intelligent lifting control on the concrete pouring pipe.
[0095] The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may be any conventional processor, etc. The processor is the control center of the operation system of the intelligent concrete slurry pouring construction system based on cast-in-place piles. The memory may be used to store the computer program and / or module, and the processor realizes various functions of the intelligent concrete slurry pouring construction system based on cast-in-place piles by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory.
[0096] The memory may include a high-speed random access memory and may also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0097] In addition, those skilled in the art may combine and combine the different embodiments or examples and the features of the different embodiments or examples described in this specification without contradiction. Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. Those skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. An intelligent concrete slurry pouring construction method based on cast-in-place piles, It is characterized in that The following steps are involved: S1. Inject static pressure mud and lower the pipe: inject static pressure mud into the pile hole, lower the concrete pouring pipe into the pile hole and place it in the center of the pile hole, and keep a distance of 30mm-60mm between the lower end of the concrete pouring pipe and the bottom of the pile hole; S2. Pouring concrete slurry: Start the concrete pouring pump, and the concrete slurry enters the bottom of the pile hole through the concrete pouring pipe. The concrete slurry gradually pushes the static pressure mud upward in the pile hole from the bottom of the pile hole. The columnar structure formed by the concrete slurry in the pile hole is called the concrete body. The concrete body gradually pushes the static pressure mud in the pile hole upward to the outside of the pile hole; S3, automatic intermittent lifting of concrete pouring pipe: during the upward movement of the concrete pouring pipe, the lower end of the concrete pouring pipe does not cross the boundary line between pure concrete and impure concrete; S4. Real-time regulation of pouring pressure: When the concrete pouring pipe is not moving, the speed of the concrete pouring pump is regulated to regulate the pouring pressure in real time; The method for regulating the speed of the concrete pouring pump is as follows: S41. During the concrete slurry pouring process, an X-ray detector is used to obtain a concrete body detection image in real time; When the lower concrete slurry boundary line sensor detects the concrete slurry boundary line, the X-ray detector is activated; when the upper concrete slurry boundary line sensor detects the concrete slurry boundary line, the X-ray detector is turned off; S42, identifying an aggregate image in the detection image; The method for identifying the aggregate image in the detection image is as follows: grayscale processing and binarization processing are performed on the image, and then edge detection is performed on the grayscale image through an edge detection operator. The edge curve obtained by edge detection divides the image into multiple sub-area images, and the sub-area images are the aggregate images in the detection image; S43, calculating the aggregate density of the concrete body, and adjusting the speed of the concrete pouring pump according to the aggregate density of the concrete body, so as to adjust the pouring pressure in real time; The method for real-time regulation of perfusion pressure is as follows: Step S4301: Create an acquired sub-area image set G={G 1 , G 2 , G 3 , …G j , …G n }, n is the number of sub-region images in the sub-region image set, set the variable j, and initialize the value of j to 1, G j is the j-th sub-region image in G; Step S4302: Create sub-area image G j The set of pixel coordinates on the edge line P = {P 1 (X 1 ,Y 1 ), P 2 (X 2 ,Y 2 ), P 3 (X 3 ,Y 3 ),…P i (X i ,Y i ), …P m (X m ,Y m )}, m is G j The number of pixel coordinates on the edge line, set the variable i, initialize the value of i to 1, P i (X i ,Y i ) is the coordinate of the i-th pixel in the set P; Step S4303: Using the sub-area image G j The center point or center of gravity in is ZX, and the sub-area image G is calculated. j The pixel point P on the edge line i (X i ,Y i ) to ZX i ; The Euclidean distance D i Add to the Euclidean distance set DP﹤D i ﹥Medium; Step S4304, increase the value of variable i by 1, if i≤m, jump to step S4303, otherwise jump to step S4305; Step S4305: In the sub-area image G j In the calculation, the Euclidean distance set DP﹤D i The arithmetic mean of the Euclidean distance D AVG ; Step S4306: Using the sub-area image G j The center point or center of gravity ZX is the center of the circle, and the arithmetic mean value D of the Euclidean distance is AVG is the radius, calculate the sub-area image G j The area S j ; Step S4307: Sub-area image G j The area S j Add to the sub-area image area set SP﹤S j ﹥Medium; Step S4308, increase the value of variable j by 1, if j≤n, jump to step S4302, otherwise jump to step S4309; Step S4309: Calculate the sub-area image area set SP﹤S j The sum of the elements in ﹥ is used to obtain the total area of the sub-region image ΣS j ; Step S4310: Calculate the aggregate density C of the concrete body, C=ΣS j / S zq , where S zq is the area of the concrete body detection area; Step S4311: Set the reference threshold interval C of the aggregate density of the concrete body B (a,b); when C>b, jump to step S4314; when C<a, jump to step S4313; when C≥a, and C≤b, jump to step S4312; Step S4312: maintaining the current speed of the concrete pouring pump to maintain the concrete pouring pressure within the range of 14.5-17.5 MPa; Step S4313, increasing the speed of the current concrete pouring pump to increase the concrete pouring pressure, so that the concrete pouring pressure is maintained within the range of 17.5-21.5MPa; Step S4314, reducing the speed of the current concrete pouring pump to reduce the concrete pouring pressure so that the concrete pouring pressure is maintained within the range of 10.5-14.5 MPa; S5. Forming cast-in-place piles: When the concrete slurry on the boundary line of pure concrete is discharged out of the pile hole, the pouring process of the concrete slurry is completed, and the cast-in-place piles are formed after the concrete solidifies.
2. The intelligent concrete slurry pouring construction method based on cast-in-place piles according to claim 1, It is characterized in that In step S3, the specific method is as follows: as the concrete slurry is continuously poured into the pile hole, the concrete slurry boundary line and the mixed and pure concrete boundary line in the pile hole gradually move upward, and when the upper concrete slurry boundary line sensor detects the concrete slurry boundary line, the pipe pulling drive device is started, and the concrete pouring pipe starts to move upward, and the upward movement speed is greater than the upward movement speed of the concrete slurry boundary line; when the lower concrete slurry boundary line sensor detects the concrete slurry boundary line, the pipe pulling drive device is closed, and the concrete pouring pipe stops moving upward, and the distance between the upper concrete slurry boundary line sensor and the lower concrete slurry boundary line sensor is not greater than the distance between the concrete slurry boundary line and the mixed and pure concrete boundary line, so that when the concrete pouring pipe moves upward, the lower end of the concrete pouring pipe does not cross the mixed and pure concrete boundary line.
3. The intelligent concrete slurry pouring construction method based on cast-in-place piles according to claim 1, Features: The edge detection operator used is Roberts Cross operator, Prewitt operator, Sobel operator, Canny operator or compass operator.
4. The intelligent concrete slurry pouring construction method based on cast-in-place piles according to claim 1, Features: The concrete pouring pipe includes an inner pipe and an outer pipe which are installed concentrically, and an annulus is formed between the inner pipe and the outer pipe. The inner pipe is used to transport concrete slurry. An upper concrete slurry boundary line sensor is provided in the annulus at a position N centimeters away from the lower port of the concrete pouring pipe. A lower concrete slurry boundary line sensor is provided in the annulus at a position M centimeters away from the lower port of the concrete pouring pipe. N is a reference design distance value from the concrete slurry boundary line to the lower port of the concrete pouring pipe, and M is a reference design distance value from the pure concrete boundary line to the lower port of the concrete pouring pipe. The relationship between N and M is: N=M+h, N≥2h, wherein h is the length of the concrete body section mixed with slurry, and h=120cm.
5. The intelligent concrete slurry pouring construction method based on cast-in-place piles according to claim 4, Features: The X-ray detector is arranged in the annulus and close to the lower port of the concrete pouring pipe.
6. A system for the intelligent concrete slurry pouring construction method based on cast-in-place piles as claimed in claim 1, It is characterized in that include: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to run in the following units of the system: An image acquisition unit, used for acquiring image data information of the concrete body; An aggregate image search and identification unit, used for searching and identifying an aggregate image in an image; A data calculation unit, used to calculate the aggregate density of the concrete body; The pouring pump control and pouring pipe movement control unit controls the speed of the concrete pouring pump according to the aggregate density of the concrete body; and starts and shuts down the pipe pulling drive device according to the concrete slurry boundary line information detected by the upper concrete slurry boundary line sensor and the lower concrete slurry boundary line sensor, and performs intelligent lifting control on the concrete pouring pipe.
Citation Information
Patent Citations
Bored pile concrete interface monitoring device and method
CN104631517A
Intelligent measurement and control method and device for pile foundation construction
CN111456120A
Automatic control device for concrete elevation pouring and control method for concrete elevation pouring
CN111851503A
Automatic control device for concrete elevation pouring
CN211143078U
Automatic grouting control system, for setting injection pressure, injection amount, and injection speed according to ground conditions and grouting purposes in advance
KR100625333B1