Active control method for large deformation of extremely high crustal stress soft rock tunnel

By adopting technologies such as active ground stress release, combination of long and short anchor rods, improvement of surrounding rock grouting strength and multi-layer initial support in the construction of extremely high ground stress soft rock tunnels, the problem of tunnel deformation and failure is solved, and the stability of the tunnel is improved. The service life reduces construction costs and risks.

CN118911705APending Publication Date: 2024-11-08BEIJING JIAOTONG UNIV +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411113078.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Extremely high-stress soft rock tunnels are prone to major deformation and damage in complex geological environments. Traditional passive support technology cannot effectively and actively control tunnel deformation, resulting in stability and service life problems.

Method used

Adopt the active release method of ground stress, the active control method of combining long and short anchor rods, the active increase of surrounding rock grouting strength, the multi-layer initial support method, the reasonable reserve of deformation, the setting of buffer layer and the addition of the tensile anchor pipe at the bottom of the tunnel. Realize active deformation control during tunnel construction.

Benefits of technology

Effectively reduce the risk of tunnel deformation and damage, improve tunnel stability and service life, reduce construction costs and risks, and improve construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911705A_ABST
    Figure CN118911705A_ABST
Patent Text Reader

Abstract

The invention discloses an active control method for large deformation of a soft rock tunnel with extremely high crustal stress, which relates to the technical field of tunnel engineering construction and comprises the following steps of: performing active control by adopting a crustal stress active release method, a long and short anchor rod combined active control method, a surrounding rock grouting strength active improvement method and a multi-layer primary support method in a tunnel excavation process; and deformation is reasonably reserved, a buffer layer is arranged, and a tunnel bottom tensile anchor pipe is additionally arranged. According to the method, active control over large deformation of the extremely-high crustal stress soft rock tunnel is achieved, deformation and damage of the tunnel are effectively reduced, the stability of the tunnel is improved, deformation and collapse risks of the soft rock tunnel are reduced, the service life of the tunnel is prolonged, the tunnel construction efficiency is improved, and risks in the construction process are reduced; construction accidents and casualties are reduced, and the construction safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering construction, and in particular to a method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress. Background Art

[0002] The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.

[0003] Extremely high geostress soft rock tunnels are usually located in areas with complex geological conditions and high geostress. Extremely high geostress means that the tunnel is subject to high geostress, which increases the risk of deformation and damage to the tunnel. Changes in geostress will also lead to stress concentration and uneven deformation in the tunnel, further exacerbating the stability problem of the tunnel. Soft rock tunnels are prone to large deformation and damage in such geological environments, posing challenges to the stability and safety of the tunnel. As an important part of transportation and infrastructure projects, the stability and reliability of soft rock tunnels are crucial to ensuring the safety and smoothness of transportation. Extremely high geostress soft rock tunnels are prone to extremely serious large deformation disasters.

[0004] Therefore, how to control the large deformation of soft rock tunnels with extremely high ground stress and improve their stability and service life has become an important issue in engineering practice. Traditional soft rock tunnel support technology is usually passive and can only be used to remedy the deformation of the tunnel, but cannot actively control the deformation of the tunnel.

[0005] Therefore, it is necessary to research and develop an active control technology that can actively control the deformation of the tunnel during tunnel construction to improve the stability and service life of the tunnel. Summary of the invention

[0006] The purpose of the present invention is to provide a method for actively controlling large deformation of soft rock tunnels with extremely high ground stress in view of the problems existing in the prior art, and adopt the method of actively releasing ground stress, the method of actively controlling the combination of long and short anchor rods, the method of actively improving the strength of surrounding rock grouting, the method of multi-layer initial support, the method of reasonably reserving deformation, setting a buffer layer and adding tensile anchor pipes at the bottom of the tunnel during tunnel excavation. This method is suitable for tunnel construction under extremely high ground stress soft rock conditions, can effectively improve the tunnel excavation speed, save construction period, thereby reducing construction costs, and well control the problem of large deformation of the tunnel caused by extremely high ground stress soft rock geological conditions.

[0007] The technical solution of the present invention is as follows:

[0008] A method for actively controlling large deformation of extremely high ground stress soft rock tunnels, comprising: actively controlling the tunnel excavation process by adopting a ground stress active release method, an active control method combining long and short anchor rods, an active surrounding rock grouting strength enhancement method, and a multi-layer initial support method, and reasonably reserving deformation, setting a buffer layer, and adding a tensile anchor pipe at the bottom of the tunnel.

[0009] Furthermore, the method for actively releasing ground stress comprises:

[0010] Step A: Lay out a parallel pilot tunnel at a horizontal position 3 to 4D away from the main tunnel, and the excavation distance of the parallel pilot tunnel ahead of the main tunnel is 5 to 6D; D is the diameter of the main tunnel;

[0011] Step B: Set up a pilot hole inside the main hole.

[0012] Furthermore, the step B comprises:

[0013] The cross-sectional area of ​​the intermediate guide tunnel is 0.6 times the cross-sectional area of ​​the main tunnel. The centerline of the intermediate guide tunnel coincides with the centerline of the main tunnel, and the height difference of the arch is 2.0m.

[0014] During the construction process, the pilot tunnel is 2 to 3D ahead of the main tunnel excavation.

[0015] Furthermore, the active control method for the combination of long and short anchor rods comprises:

[0016] Install short prestressed anchor rods on the upper step;

[0017] After the lower step is excavated, short prestressed anchor rods and self-propelled long anchor rods are installed simultaneously on the side walls of the main tunnel.

[0018] Furthermore, the short prestressed anchor rod has a length of about 5 m, a prestressing force set at more than 100 kN, and is made of high-strength threaded steel;

[0019] The self-propelled long anchor rod is greater than 12 m in length, is drilled using an anchor drilling rig, and is made of a high-strength threaded pipe.

[0020] Furthermore, the method for actively improving the surrounding rock grouting strength comprises:

[0021] The surrounding rock in front of the tunnel face is reinforced by grouting using advanced pipe racks and advanced small guide tubes.

[0022] Furthermore, the advanced pipe shed is arranged within 150° of the tunnel arch, with an annular spacing of 1m, a diameter of 108mm, a pipe shed wall thickness of 6mm, and a length greater than 12m. Drilling and grouting can adopt a skip hole method and backward segmented grouting;

[0023] The advance small pipe is laid within the 120° range of the tunnel arch, with an annular spacing of 1m, a diameter of 42mm, a pipe wall thickness of 6mm, and a length greater than 4m;

[0024] Radial grouting is completed through sleeve valve pipe with a length greater than 5m. The grouting pressure is determined comprehensively based on the surrounding rock characteristics and ground stress.

[0025] Furthermore, the multi-layer initial support method comprises:

[0026] Use double or triple layers of initial support.

[0027] Furthermore, the first layer of initial support is 30cm thick, using full-ring I25b steel arch frame with a spacing of 0.6m, and the shotcrete is C30; the second layer of initial support is 40cm thick, using full-ring I25b steel arch frame with a spacing of 0.6m, and the shotcrete is C35; the third layer of initial support is 40cm thick, using full-ring cast-in-place concrete, the main reinforcement HRB400 is 22mm in diameter, and the shotcrete is C35.

[0028] Furthermore, the setting of the reserved deformation is combined with the deformation characteristics of the tunnel, and reasonable reserved deformations of different initial support layers and different positions are set respectively; a 6cm thick buffer layer is added between the third layer of initial support of the arch wall and the secondary lining of the tunnel, and the material is a high-density closed-cell rubber-plastic sponge, which is placed on the outside of the waterproof board;

[0029] Tensile anchor pipes are added to the tunnel invert, with 9 φ76 grouting anchor pipes arranged per meter of tunnel, with a length of more than 10m.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] The present invention proposes a method for actively controlling large deformation of soft rock tunnels with extremely high ground stress. The key point is to adopt a set of technologies such as an active ground stress release method, an active control method combining long and short anchor rods, an active surrounding rock grouting strength improvement method, a multi-layer initial support method, a reasonable reserved deformation amount, a buffer layer, and an additional tunnel bottom tensile anchor pipe technology, thereby realizing active control of large deformation of soft rock tunnels with extremely high ground stress, effectively reducing deformation and damage of tunnels, improving tunnel stability, reducing deformation and collapse risks of soft rock tunnels, extending the service life of tunnels, improving the efficiency of tunnel construction, reducing risks in the construction process, reducing the occurrence of construction accidents and casualties, and improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is the layout diagram of the flat guide and main tunnel;

[0033] Figure 2 This is the cross-section of the middle guide tunnel;

[0034] Figure 3 This is a schematic diagram of the construction of long and short anchor rods;

[0035] Figure 4This is the topographic map of Haba Snow Mountain Tunnel;

[0036] Figure 5 This is the longitudinal section of Haba Snow Mountain Tunnel;

[0037] Figure 6 Reveal surrounding rock maps for tunnel excavation;

[0038] Figure 7 This is the tunnel face collapse map;

[0039] Figure 8 This is the initial support deformation diagram;

[0040] Fig. 9 This is a diagram of structural damage;

[0041] Fig.10 This is the extrusion deformation diagram of the tunnel face;

[0042] Fig.11 This is the stability diagram of the tunnel face;

[0043] Fig.12 is the tunnel deformation curve;

[0044] Fig.13 This is the effect of secondary lining construction. DETAILED DESCRIPTION

[0045] It should be noted that relational terms such as "first" and "second" are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0046] The features and performance of the present invention are further described in detail below in conjunction with the embodiments.

[0047] Embodiment 1

[0048] A method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress, specifically comprising:

[0049] During the tunnel excavation process, active control is carried out by adopting the method of active release of ground stress, active control method combining long and short anchor rods, active improvement method of surrounding rock grouting strength, and multi-layer initial support method, and reasonable deformation is reserved, buffer layer is set, and tensile anchor pipes are added to the tunnel bottom.

[0050] In this embodiment, specifically, the method for actively releasing ground stress includes:

[0051] Step A: Lay out a parallel pilot tunnel at a horizontal position 3 to 4D (D is the diameter of the main tunnel) from the main tunnel. The parallel pilot tunnel is 5 to 6D ahead of the main tunnel, which can release about 5% to 10% of the surrounding rock stress of the main tunnel in advance. Figure 1 As shown;

[0052] Step B: Set up a middle guide tunnel inside the main tunnel; the cross-sectional area of ​​the middle guide tunnel is 0.6 times the cross-sectional area of ​​the main tunnel, the centerline of the middle guide tunnel coincides with the centerline of the main tunnel, and the height difference of the arch is 2.0m; during the construction process, the guide tunnel is 2 to 3D ahead of the main tunnel excavation; the reasonable setting of the leading middle guide tunnel can reduce the ground stress by more than 20%, and the peak stress in the surrounding rock is transferred to the depth of about 4m, greatly reducing the damage to the support structure. The cross-sectional area of ​​the middle guide tunnel is as follows: Figure 2 shown.

[0053] In this embodiment, specifically, the active control method for the combination of long and short anchor rods includes:

[0054] Taking into account the timeliness of construction space and support, short prestressed anchor rods are installed in time after the excavation of the upper step of the main tunnel. It is recommended that the length of the short prestressed anchor rods be about 5m, the prestress be set at more than 100kN, and high-strength threaded steel should be used for the anchor rods. By timely installing short prestressed anchor rods on the upper step, the deformation of the surrounding rock and the development of the loosening circle can be controlled, the surrounding rock can form a bearing ring, and the loosening circle can be inhibited from developing to the depth.

[0055] After the lower step is excavated, the construction space becomes larger. Short prestressed anchor rods and self-propelled long anchor rods are installed on the side walls of the main tunnel to further strengthen the bearing ring and transfer part of the surrounding rock pressure to the outside of the loose circle, so that the long anchor rods and the bearing ring can cooperate to resist deformation. Figure 3 As shown in the figure, the long anchor rods of the side walls can be made of high-strength threaded pipes, the length of which should be greater than 12m, and can be drilled with an anchor drilling rig for quick installation.

[0056] In this embodiment, specifically, the method for actively improving the surrounding rock grouting strength includes:

[0057] Use advanced pipe sheds and advanced small guide tubes to grout and reinforce the surrounding rock in front of the tunnel face; the advanced pipe shed is arranged within 150° of the tunnel arch, with an annular spacing of 1m, a diameter of 108mm, a pipe shed wall thickness of 6mm, and a length greater than 12m. Drilling and grouting can adopt skip hole method and backward segmented grouting;

[0058] The advance small pipe is laid within the 120° range of the tunnel arch, with an annular spacing of 1m, a diameter of 42mm, a pipe wall thickness of 6mm, and a length greater than 4m;

[0059] The radial grouting is completed through a sleeve valve pipe with a length greater than 5m. The grouting pressure is determined comprehensively based on the surrounding rock characteristics and ground stress;

[0060] That is, in order to solve the problem of excessive radial deformation of the tunnel, grouting reinforcement is carried out on the surrounding rock, which is conducive to forming a surrounding rock bearing ring and preventing excessive deformation. The radial grouting is completed through a sleeve valve pipe, the length of which should be greater than 5m. The grouting pressure should be determined comprehensively based on the surrounding rock characteristics and ground stress, and it is recommended to be set above 5MPa.

[0061] In this embodiment, specifically, the multi-layer initial support method includes:

[0062] Double or three layers of initial support are adopted; among them, the first layer of initial support is 30cm thick, using full-ring I25b steel arch frame, with a spacing of 0.6m, and the shotcrete is C30; the second layer of initial support is 40cm thick, using full-ring I25b steel arch frame, with a spacing of 0.6m, and the shotcrete is C35; the third layer of initial support is 40cm thick, using full-ring cast-in-place concrete, the main reinforcement (HRB400) has a diameter of 22mm, and the shotcrete is C35.

[0063] In this embodiment, specifically, the setting of the reserved deformation is combined with the deformation characteristics of the tunnel, and the reasonable reserved deformation of different initial support layers and different positions is set respectively, as shown in Table 1; a 6 cm thick buffer layer is added between the third layer of initial support of the arch wall and the secondary lining of the tunnel, and the material is a high-density closed-cell rubber-plastic sponge, which is placed on the outside of the waterproof board;

[0064] In order to suppress the uplift of the invert, tensile anchor pipes are added to the tunnel invert, with 9 φ76 grouting anchor pipes arranged for every meter of tunnel, with a length of more than 10m.

[0065] Table 1 Reserved deformation

[0066]

[0067] Embodiment 2

[0068] The second embodiment is a specific application of the large deformation active control method for extremely high ground stress soft rock tunnel proposed in the first embodiment.

[0069] (1) Project Background

[0070] The Haba Snow Mountain Tunnel on the Lixiang Line of the Yunnan-Tibet Railway is located in the middle section of the Hengduan Mountains on the southeastern edge of the Qinghai-Tibet Plateau in the northwest of Yunnan Province. It belongs to the plateau tectonic erosion landform area. The mountain is low on the left and high on the right, with large terrain fluctuations. It is located in the erosion platform of the Chongjiang River and the Jinsha River. Figure 4 The ground elevation is 2050m~3400m, the natural cross slope is 15°~40°, and there are steep cliffs in some parts. The tunnel is a mountain-crossing tunnel.

[0071] The tunnel is a key control project of the entire Lixiang Line of the Yunnan-Tibet Railway. It is a Class I high-risk tunnel with a designed speed of 140km / h. The starting and ending mileage is DK52+183~DK61+706, the total length is 9523m, and the maximum buried depth is 1155m. The maximum buried depth is at about DK58+900 in the tunnel mileage. The geological longitudinal section of the tunnel is shown as follows Figure 5 shown.

[0072] The tunnel site is distributed with Quaternary Holocene landslide accumulation block soil, slope residual silty clay, breccia soil, moraine breccia soil, and the underlying bedrock is the Middle Triassic dolomitic limestone, the Lower Triassic Hutiaojian area sandy slate, slate interbedded with limestone, foliated basalt, and fault breccia. Mainly north-south faults are developed, and branch faults are developed locally.

[0073] The Haba Snow Mountain Tunnel is buried deep, with complex geological structures and geostress environments, and strong neotectonic movements. The surrounding rock is mainly fragmented and foliated basalt intercalated with tuff, which is mostly squeezed into breccia and sandy soil. The excavated slag is in the form of powder, gravel, breccia, sand and flakes. The surrounding rock is weak and loose, and the self-stability is extremely poor. Figure 6 As shown, this is a soft rock tunnel with extremely high ground stress.

[0074] During the construction process, the tunnel experienced severe deformation problems in many sections. The characteristics of the tunnel deformation mainly include the following aspects:

[0075] 1) The face is prone to instability

[0076] During the tunnel construction process, several landslides occurred, and the amount of soil (rock) gushing out was large. Figure 7 As shown in the figure, the stability of the tunnel face is difficult to control in time, and the spray mix (about 45 cm) that closes the tunnel face is squeezed and cracked within 3 days.

[0077] 2) The support deformation rate is fast and the deformation amount is large

[0078] After tunnel excavation, the deformation rate is above 15cm / d, and the cumulative deformation on one side is greater than 2m. Figure 8 As shown, the maximum uplift of the invert is more than 1.5m.

[0079] 3) Severe structural damage

[0080] The Haba Snow Mountain Tunnel was difficult to stabilize due to its large deformation, which led to serious structural damage during construction. A large area of ​​long sections of the secondary lining collapsed, with a length of 189 meters. Fig. 9 During the construction process, large cracks appeared in the molded lining at the fork in the road within a week, making it difficult to ensure the safety of the structure.

[0081] (2) Effect of technology application

[0082] The Haba Snow Mountain Tunnel reinforced the tunnel face through measures such as advanced small guide tubes, grouting, and pipe sheds, reducing the extrusion deformation of the tunnel face by more than 60%. Fig.10 As shown in the figure, the probability of tunnel face collapse is reduced; the loosening range of the surrounding rock in front of the tunnel face is reduced, which enhances the mechanical properties of the surrounding rock of the tunnel face and thus improves the stability of the tunnel face. Fig.11 shown.

[0083] By taking measures such as long and short anchor rods coordinated active control, radial grouting to enhance surrounding rock strength, and adding tensile anchor pipes at the bottom of the tunnel, the tunnel vault settlement and the horizontal convergence of the upper and lower steps were greatly reduced, and the uplift of the invert arch was effectively controlled. Before and after the control measures were adopted, the tunnel deformation curve was as follows: Fig.12 As shown, tunnel deformation is reduced by more than 40%.

[0084] The contact pressure of the secondary lining section of Haba Snow Mountain Tunnel is less than 0.1MPa; the stress of the main reinforcement of the secondary lining is relatively small except for the left wall. The maximum main reinforcement stress is -152.6MPa, which appears on the inner side of the left wall, which is 42.39% of the design value of the steel bar compressive strength; the stress of the secondary lining concrete does not exceed the design value of the concrete strength. Fig.13 shown.

[0085] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.

[0086] This background section is provided to generally present the context of the invention, and the work of the presently named inventors, the work to the extent described in this background section, and aspects of this section that did not constitute prior art at the time of application are neither explicitly nor implicitly admitted to be prior art to the present invention.

Claims

1. A method for actively controlling large deformation of soft rock tunnels with extremely high ground stress, characterized in that: include: During the tunnel excavation process, active control is carried out by adopting the method of active release of ground stress, active control method combining long and short anchor rods, active improvement method of surrounding rock grouting strength, and multi-layer initial support method, and reasonable deformation is reserved, buffer layer is set, and tensile anchor pipes are added to the tunnel bottom.

2. The method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress according to claim 1, characterized in that: The method for actively releasing ground stress comprises: Step A: Lay out a parallel pilot tunnel at a horizontal position 3 to 4D away from the main tunnel, and the excavation distance of the parallel pilot tunnel ahead of the main tunnel is 5 to 6D; D is the diameter of the main tunnel; Step B: Set up a pilot hole inside the main hole.

3. The method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress according to claim 2, characterized in that: The step B comprises: The cross-sectional area of ​​the intermediate guide tunnel is 0.6 times the cross-sectional area of ​​the main tunnel. The centerline of the intermediate guide tunnel coincides with the centerline of the main tunnel, and the height difference of the arch is 2.0m. During the construction process, the pilot tunnel is 2 to 3D ahead of the main tunnel excavation.

4. The method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress according to claim 1, characterized in that: The active control method for combining long and short anchor rods comprises: Install short prestressed anchor rods on the upper step; After the lower step is excavated, short prestressed anchor rods and self-propelled long anchor rods are installed simultaneously on the side walls of the main tunnel.

5. The method for actively controlling large deformation of extremely high ground stress soft rock tunnel according to claim 4, characterized in that: The short prestressed anchor rod is about 5m long, with a prestress set at more than 100kN, and is made of high-strength threaded steel; The self-propelled long anchor rod has a length greater than 12 m, is drilled using an anchor drilling rig, and is made of a high-strength threaded pipe.

6. The method for actively controlling large deformation of extremely high ground stress soft rock tunnel according to claim 1, characterized in that: The method for actively improving the surrounding rock grouting strength comprises: The surrounding rock in front of the tunnel face is reinforced by grouting using advanced pipe racks and advanced small guide tubes.

7. The method for actively controlling large deformation of extremely high ground stress soft rock tunnel according to claim 6, characterized in that: The advanced pipe shed is arranged within 150° of the tunnel arch, with an annular spacing of 1m, a diameter of 108mm, a pipe shed wall thickness of 6mm, and a length greater than 12m. Drilling and grouting can adopt a skip hole method and backward segmented grouting; The advance small pipe is laid within the 120° range of the tunnel arch, with an annular spacing of 1m, a diameter of 42mm, a pipe wall thickness of 6mm, and a length greater than 4m; Radial grouting is completed through sleeve valve pipe with a length greater than 5m. The grouting pressure is determined comprehensively based on the surrounding rock characteristics and ground stress.

8. The method for actively controlling large deformation of extremely high ground stress soft rock tunnel according to claim 1, characterized in that: The multi-layer initial support method comprises: Use double or triple layers of initial support.

9. The method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress according to claim 8, characterized in that: The first layer of initial support is 30cm thick, using full-ring I25b steel arch frame with a spacing of 0.6m, and the shotcrete is C30; the second layer of initial support is 40cm thick, using full-ring I25b steel arch frame with a spacing of 0.6m, and the shotcrete is C35; the third layer of initial support is 40cm thick, using full-ring cast-in-place concrete, the main reinforcement HRB400 has a diameter of 22mm, and the shotcrete is C35.

10. The method for actively controlling large deformation of a soft rock tunnel with extremely high ground stress according to claim 1, characterized in that: The setting of the reserved deformation is combined with the deformation characteristics of the tunnel, and reasonable reserved deformations of different initial support layers and different positions are set respectively; a 6cm thick buffer layer is added between the third layer of initial support of the arch wall and the secondary lining of the tunnel. The material is a high-density closed-cell rubber-plastic sponge, which is placed on the outside of the waterproof board; Tensile anchor pipes are added to the tunnel invert, with 9 φ76 grouting anchor pipes arranged per meter of tunnel, with a length of more than 10m.