Support-free pier column underpinning steel cover beam structure
Through the structure of the steel cover beam without support, prefabricated components are used to simplify construction and directly lift the upper beam body, solving the complex and risky problems of existing pier column retention methods, and achieving convenient and efficient pier column support Change.
Patent Information
- Application Number
- CN202410952518.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-19
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing pier column support method has complex processes and long cycles, and has a great impact on the space under the bridge, which poses construction risks and structural damage.
The structure of the steel cover beam without support without support, including the steel cover beam side box, end beam, replenishment beam, ordinary beam, partition plate, stiffener rib, shear stud and pier top steel sleeve, which is prefabricated The components are assembled on site to reduce the use of temporary brackets and on-site construction, and directly lift the upper beam body.
The construction process is simplified, the construction period is shortened, the damage to the original structure and construction risks are reduced, and the impact on the space under the bridge is reduced. It is suitable for support of different pier column types.
Smart Images

Figure CN118979434A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel cap beams, and in particular to a support-free pier column underpinning steel cap beam structure. Background Art
[0002] When a new road passes through the space where the substructure of an existing bridge is located, pier underpinning becomes the best solution to ensure the use function of the existing structure and provide space conditions for the new road. With the advancement of urban upgrading and urbanization, the construction of transportation infrastructure has developed rapidly, and there are more and more new roads crossing existing lines. Given the immutability of the use function of the existing structure, more and more cases require underpinning.
[0003] At present, for the uncapped beam-column piers, the commonly used replacement method is: first construct a new pile foundation at the corresponding position under the existing structure, then set up a temporary support to lift the upper beam body to empty the support, then remove the original pier columns that need to be abolished, construct new bridge piers and concrete cap beams, and finally slowly lower the beams and remove the temporary supports; for the capped beam-column piers, the commonly used replacement method is: first construct a new pile foundation, then set up a temporary support to lift the upper beam body to empty the support, then construct new bridge piers, and at the same time, plant reinforcement on the original cap beam to expand the cross-section and extend it, and after the cap beam is connected to the new bridge piers, remove the original pier columns that need to be abolished, and finally slowly lower the beams and remove the temporary supports.
[0004] However, conventional pier column replacement methods require the erection of temporary supports to lift the upper beam, and the on-site construction of steel bars and formwork before pouring the cap beam concrete. The construction process is complex, the cycle is long, and it has a great impact on the space under the bridge. For cap beam column piers, the original cap beam needs to be expanded and extended in cross section, which is difficult to construct and takes a long time. At the same time, it causes great damage to the original structure and there are certain construction risks. Summary of the invention
[0005] The purpose of the present invention is to provide a support-free pier column to support the steel cap beam structure, solving the following technical problems:
[0006] How to shorten the cycle of pier underpinning and simplify the operation process?
[0007] The purpose of the present invention can be achieved by the following technical solutions:
[0008] In the first aspect, the present invention discloses a support-free pier column underpinning steel cap beam structure, comprising two steel cap beam side boxes, steel cap beam end cross beams are connected between both ends of the two steel cap beam side boxes, and a cross beam for underpinning and a common cross beam of the steel cap beam are also connected between the two steel cap beam side boxes;
[0009] Among them, the common cross beam of the steel cap beam is connected between the two steel cap beam side boxes, and each replacement cross beam is composed of two symmetrical beam bodies, which enclose a pier hole for being installed on the pier that needs to be demolished.
[0010] In a further solution of the present invention: a plurality of steel cap beam cross partitions aligned with the steel cap beam end beams, the support beams and the ordinary beams of the steel cap beams are arranged inside the steel cap beam side box.
[0011] In a further solution of the present invention: a crossbeam alignment stiffening rib aligned with the upper flange of the replacement crossbeam is arranged inside the steel cap beam side box.
[0012] In a further solution of the present invention: a pier top steel sleeve is provided at the bottom of the steel cap beam end cross beam, and the steel sleeve is inserted into the interior of the steel cap beam end cross beam.
[0013] In a further solution of the present invention: a plurality of shear bolts are arranged inside the steel cap beam side box, and a plurality of shear bolts are also arranged outside the steel cap beam side box and on the concrete side within the consolidation range of the existing piers to be removed.
[0014] In a further embodiment of the present invention, a plurality of shear bolts are provided on the upper flange and the concrete side of the web of the underpinning cross beam.
[0015] In a further embodiment of the present invention, a plurality of shear bolts are arranged inside the end cross beam of the steel cap beam.
[0016] In a second aspect, the present invention further discloses a construction method for replacing a steel cap beam structure with a bracket-free pier column as described above, which is used to replace a pier column of a cap beam-column type pier that currently needs to be replaced, wherein the cap beam-column type pier includes a cap beam that currently needs to be replaced and a pier column that currently needs to be removed and is arranged on the lower side of the cap beam that currently needs to be replaced, and is characterized in that it includes the following construction steps:
[0017] S1: construct new pile foundations at the planned locations of the existing cap beam column piers that need to be replaced, roughen the top of the columns and the interface between the new and old concrete of the cap beams, apply interface agent, plant reinforcement on the concrete surface, and simultaneously complete the prefabrication of the steel cap beam structure for the support-free pier columns in the factory;
[0018] S2: The support-free pier column to support the steel cap beam structure is installed on site. The steel cap beam side box, steel cap beam end beam, support beam, steel cap beam common beam, steel cap beam cross diaphragm, beam alignment stiffening ribs, pier top steel sleeve and shear bolts are all prefabricated in the factory. After completion, they are transported to the site. After reaching the design plane, they are welded together to form a whole through the steel cap beam end beam, support beam and steel cap beam common beam. After the support-free pier column to support the steel cap beam structure is assembled, the support-free pier column to support the steel cap beam structure is lifted to the design elevation by cranes on both sides.
[0019] S3: Tie up the steel bars of the pier column, pour the concrete of the pier column and the cross beam at the end of the steel cap beam, and remove the cranes on both sides after the concrete reaches the design age;
[0020] S4: Pour the internal concrete of the support-free pier column to replace the steel cap beam structure. After the concrete reaches the design age, use jacks to temporarily lift the upper beam body on the support-free pier column to replace the steel cap beam structure after the concrete is poured. After lifting until the support is empty, use steel pads to tighten the jack position;
[0021] S5: pouring consolidation nodes and then pouring concrete to combine the new and old structures;
[0022] S6: Remove the existing piers that need to be removed at the positions where the piers need to be removed;
[0023] S7: Slowly unload the temporary jacks under the beam, complete the beam drop construction, and finally complete the underpinning.
[0024] In a further solution of the present invention: in step S2, when the support-free pier column underpinning steel cap beam structure is assembled, the underpinning crossbeam is sleeved on the bottom of the pier column that needs to be removed.
[0025] In a further solution of the present invention: in step S4, the upper beam body is an upper structure of the cap beam that needs to be replaced.
[0026] Beneficial effects of the present invention:
[0027] (1) The support-free pier replacement steel cap beam structure of the present invention is a steel cap beam structure suitable for pier replacement. The upper beam body can be lifted directly on the steel cap beam side box without setting up temporary supports. The construction is convenient and has little impact on the space under the bridge.
[0028] (2) The support-free pier column underpinning steel cap beam structure of the present invention does not require large-scale planting of reinforcement bars on the existing cap beam during the replacement process, which is convenient for construction and can effectively reduce damage to the original structure and lower construction risks.
[0029] (3) The support-free pier column replacement steel cap beam structure of the present invention does not require on-site tying of new cap beams or enlarged cross-section steel bars when in use, and does not require the erection of formwork. The construction is convenient and can effectively shorten the construction period.
[0030] (4) The support-free pier column underpinning steel cap beam structure of the present invention has wide adaptability and is not limited by the existing pier column structure type. It can be flexibly applied to the underpinning design of pier column types such as non-cap beam column type pier and cap beam column type pier. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The present invention will be further described below in conjunction with the accompanying drawings.
[0032] Figure 1It is a schematic diagram of the structure of the cap beam-column pier that needs to be replaced in the present invention;
[0033] Figure 2 It is a front view of the structure of the support-free pier column underpinning the steel cap beam in the present invention;
[0034] Figure 3 It is a top view of the structure of the support-free pier column underpinning the steel cap beam in the present invention;
[0035] Figure 4 It is a side cross-sectional view of the structure of the support-free pier column underpinning the steel cap beam in the present invention;
[0036] Figure 5 It is a side view of the structure of the support-free pier column underpinning the steel cap beam in the present invention;
[0037] Figure 6 It is a side view of the steel cap beam side box in the support-free pier column supporting steel cap beam structure of the present invention.
[0038] In the figure: 1. The cap beam needs to be replaced at present; 2. The pier columns need to be removed at present; 3. The side boxes of the steel cap beam; 4. The cross beams at the ends of the steel cap beam; 5. The cross beams for replacement; 6. The ordinary cross beams of the steel cap beam; 7. The cross diaphragms of the steel cap beam; 8. The stiffening ribs for the cross beams; 9. The steel sleeves at the top of the pier; 10. The shear bolts; 11. The embedded reinforcement bars; 12. The concrete is poured after the consolidation nodes; 13. The cutting positions of the pier columns need to be removed at present; 14. The strengthening ribs at the top of the pier. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0040] Example 1
[0041] See also Figure 1-2 As shown, the present invention is a support-free pier column replacement steel cap beam structure, which is used to replace the pier columns of the existing cap beam column type pier that needs to be replaced. For example, in the embodiment of the present invention, the existing cap beam column type pier that needs to be replaced is a conventional implicit cap beam connected to a double cylindrical pier structure, including an existing cap beam 1 that needs to be replaced and two existing pier columns 2 that need to be removed that are arranged on the lower side of the existing cap beam 1 that needs to be replaced; according to the overall plan for the new road, the two existing pier columns 2 that need to be removed of the cap beam connected to the double cylindrical pier need to be replaced and removed. The construction period of this project is tight, and due to the special geographical location, it is not suitable to set up temporary supports on a large scale. It is difficult to achieve if conventional pier column replacement methods are used; therefore, the support-free pier column replacement steel cap beam structure of the present invention can be used to achieve rapid and efficient replacement.
[0042] The support-free pier column replacement steel cap beam structure of the present invention is composed of two steel cap beam side boxes 3, two steel cap beam end cross beams 4, two replacement cross beams 5, one steel cap beam ordinary cross beam 6, 18 steel cap beam cross partitions 7, 4 cross beam alignment stiffening ribs 8, 2 pier top steel sleeves 9 and a plurality of shear bolts 10.
[0043] See also Figure 3-4 The two steel cap beam side boxes 3 are arranged in parallel and symmetrically. The two steel cap beam end cross beams 4 are respectively connected between the two ends of the two steel cap beam side boxes 3. The bottoms of the two steel cap beam end cross beams 4 are provided with pier top steel sleeves 9, which are inserted into the steel cap beam end cross beams 4; the steel cap beam common cross beam 6 is connected to the middle position between the two steel cap beam side boxes 3. With the different lengths of the steel cap beam side boxes 3, the position and number of the steel cap beam common cross beam 6 can be adjusted as needed. It is used to enhance the stability between the two steel cap beam side boxes 3. Two replacement cross beams 5 are also connected between the two steel cap beam side boxes 3. Each replacement cross beam 5 is composed of two symmetrical beam bodies. The two beam bodies are enclosed on the left and right to form a pier column hole, which is used to be set on the pier column 2 that needs to be removed at present; the two steel cap beam side boxes 3 are provided with beam alignment stiffening ribs 8 aligned with the upper flanges of the two replacement cross beams 5 to enhance the strength of the replacement cross beam 5.
[0044] It should be noted that the number of replacement beams 5 is determined according to the number of piers 2 that need to be removed in the current situation. In other embodiments, the number of replacement beams 5 can be adjusted to flexibly adapt to the number of piers 2 that need to be removed in different current situations. At the same time, there is no specific restriction on the number of ordinary beams 6 of the steel cap beam, and the number of ordinary beams 6 of the steel cap beam can be adjusted according to actual conditions.
[0045] See also Figure 5-6 There are 18 steel cap beam cross partitions 7 connected to the inside of the two steel cap beam side boxes 3, with 9 of them arranged in each steel cap beam side box 3, which are respectively aligned with the center position and the inner side of the two steel cap beam end beams, the four parts of the beam body in the two replacement beams 5 and the steel cap beam ordinary beam 6, so as to enhance the overall stability of the structure of the steel cap beam supported by the bracket-free pier.
[0046] Shear bolts 10 are arranged inside the steel cap beam side box 3 to ensure that the steel cap beam side box 3 forms a whole with the concrete poured inside; shear bolts 10 are arranged on the outside of the steel cap beam side box 3 and on the concrete side within the consolidation range of the piers that need to be removed at present, and a number of shear bolts 10 are arranged on the upper flange and web concrete side of the replacement beam 5 to increase the strength, and shear bolts 10 are also arranged inside the steel cap beam end beam 4.
[0047] Example 2
[0048] This embodiment discloses a construction method for replacing a steel cap beam structure with a bracket-free pier column based on the embodiment 1, comprising the following construction steps:
[0049] S1: construct a new pile foundation at the planned location of the existing cap beam column pier, roughen the top of the column and the interface between the new and old concrete of the cap beam, apply interface agent, plant reinforcement 11 on the concrete surface, and simultaneously complete the prefabrication of the support-free pier column to support the steel cap beam structure in the factory;
[0050] S2: Install the support-free pier column to support the steel cap beam structure on site. The steel cap beam side box 3, steel cap beam end cross beam 4, support beam 5, steel cap beam common cross beam 6, steel cap beam cross diaphragm 7, cross beam alignment stiffening rib 8, pier top steel sleeve 9 and shear bolt 10 are all prefabricated in the factory and transported to the site after completion. After reaching the design plane, the steel cap beam end cross beam 4, support beam 5 and steel cap beam common cross beam 6 are butt welded to form a whole. After assembling into the support-free pier column to support the steel cap beam structure described in Example 1 (the pier column hole of the support beam 5 needs to be set at the bottom of the pier column 2 that needs to be removed at present), the support-free pier column to support the steel cap beam structure is lifted to the design elevation by cranes on both sides;
[0051] S3: Tie up the pier column reinforcement, pour the pier column concrete and the concrete of the cross beam 4 at the end of the steel cap beam, and install the pier reinforcement rib 14. After the concrete reaches the design age, remove the cranes on both sides;
[0052] S4: pouring concrete inside the structure of the steel cap beam supported by the pier without support. After the concrete reaches the design age, the upper beam body is temporarily lifted by a jack on the structure of the steel cap beam supported by the pier without support after the concrete is poured (the upper structure of the cap beam 1 needs to be replaced at present). After the jacking is lifted until the support is empty, the jack position is plugged with a steel pad;
[0053] S5: pour concrete at the consolidation node formed by the connection between the cross beam 5 for replacement and the pier 2 to be removed, and combine the new and old structures;
[0054] S6: Remove the existing pier 2 that needs to be removed at the removal position 13 of the existing pier;
[0055] S7: Slowly unload the temporary jacks under the beam, complete the beam drop construction, and finally complete the underpinning.
[0056] In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, and a specific direction structure and operation, and therefore, cannot be understood as a limitation on the present invention. In addition, "first" and "second" are only for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0057] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0058] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A structure for replacing steel cap beams with pier columns without brackets, characterized in that: It comprises two steel cap beam side boxes (3), both ends of the two steel cap beam side boxes (3) are connected with steel cap beam end cross beams (4), and the two steel cap beam side boxes (3) are also connected with a support cross beam (5) and a steel cap beam common cross beam (6); Among them, the common cross beam (6) of the steel cap beam is connected between the two steel cap beam side boxes (3), and each replacement cross beam (5) is composed of two symmetrical beam bodies, which enclose a pier hole for being installed on the existing pier (2) that needs to be removed.
2. The structure of replacing steel cap beam with pier without support according to claim 1 is characterized in that: A plurality of steel cap beam cross diaphragms (7) aligned with the steel cap beam end cross beams (4), the replacement cross beams (5) and the steel cap beam common cross beams (6) are arranged inside the steel cap beam side box (3).
3. The structure of replacing steel cap beam with pier without support according to claim 1 is characterized in that: The steel cap beam side box (3) is provided with a beam alignment stiffening rib (8) aligned with the upper flange of the replacement beam (5).
4. The structure of replacing steel cap beam with pier without support according to claim 1 is characterized in that: A pier top steel sleeve (9) is provided at the bottom of the steel cap beam end cross beam (4), and the steel sleeve (9) is inserted into the steel cap beam end cross beam (4).
5. The structure of replacing steel cap beam with pier without support according to claim 1 is characterized in that: A plurality of shear bolts (10) are arranged inside the steel cap beam side box (3), and a plurality of shear bolts (10) are also arranged on the outside of the steel cap beam side box (3) and on the concrete side within the consolidation range of the existing pier column (2) to be removed.
6. The structure of replacing steel cap beam with pier without support according to claim 1 is characterized in that: A plurality of shear bolts (10) are arranged on the upper flange and the concrete side of the web of the replacement cross beam (5).
7. The structure of replacing steel cap beam with pier without support according to claim 1 is characterized in that: A plurality of shear bolts (10) are arranged inside the steel cap beam end cross beam (4).
8. A construction method for replacing a steel cap beam structure with a support-free pier column based on any one of claims 1 to 7, for replacing a pier column of a cap beam-column type pier that currently needs to be replaced, wherein the cap beam-column type pier comprises a cap beam (1) that currently needs to be replaced and a pier column (2) that currently needs to be removed and is arranged on the lower side of the cap beam (1) that currently needs to be replaced, and is characterized in that: The construction steps include: S1: construct a new pile foundation at the planned location of the existing cap beam column pier that needs to be replaced, roughen the top of the column and the interface between the new and old concrete of the cap beam, apply interface agent, and plant reinforcement on the concrete surface (11), and simultaneously complete the prefabrication of the steel cap beam structure of the bracket-free pier column replacement in the factory; S2: The support-free pier column supporting the steel cap beam structure is installed on site. The steel cap beam side box (3), the steel cap beam end cross beam (4), the support cross beam (5), the steel cap beam common cross beam (6), the steel cap beam cross diaphragm (7), the cross beam alignment stiffening rib (8), the pier top steel sleeve (9) and the shear bolt (10) are all prefabricated in the factory. After completion, they are transported to the site. After reaching the design plane, they are butt-welded to form a whole through the steel cap beam end cross beam (4), the support cross beam (5) and the steel cap beam common cross beam (6). After the support-free pier column supporting the steel cap beam structure is assembled, the support-free pier column supporting the steel cap beam structure is lifted to the design elevation by cranes on both sides; S3: Tie up the pier column reinforcement, pour the pier column concrete and the steel cap beam end cross beam (4) concrete, and remove the cranes on both sides after the concrete reaches the design age; S4: Pour the internal concrete of the support-free pier column to replace the steel cap beam structure. After the concrete reaches the design age, use jacks to temporarily lift the upper beam body on the support-free pier column to replace the steel cap beam structure after the concrete is poured. After lifting until the support is empty, use steel pads to tighten the jack position; S5: pouring consolidation nodes and then pouring concrete (12) to combine the new and old structures; S6: removing the existing pier (2) that needs to be removed at the position (13) where the pier needs to be removed; S7: Slowly unload the temporary jacks under the beam, complete the beam drop construction, and finally complete the underpinning.
9. The construction method of the support-free pier column underpinning steel cap beam structure according to claim 8 is characterized in that: In step S2, when the support-free pier column underpinning steel cap beam structure is assembled, the underpinning crossbeam (5) is sleeved on the bottom of the pier column (2) that needs to be removed.
10. The construction method of the support-free pier column underpinning steel cap beam structure according to claim 8, characterized in that: In step S4, the upper beam body is the upper structure of the cap beam (1) that needs to be replaced.
Citation Information
Patent Citations
Connecting structure of steel cover beam and concrete rectangular pier column
CN115748426A
Transformation operation structure of underwater single-column pier bridge and pier top transformation method
CN116163242A
Dun ding sets up structure that bridge was widened to steel bent cap
CN205557351U
Overhead bridge transformation structure
CN205662837U
Single-column pier steel cover beam reinforcing structure
CN215758502U